MPCA Citizens’ Board Information Item February 25, 2014
2
Chemical Disposal 1947-1962 Former General Mills Facility 2010 East Hennepin Avenue Minneapolis
3
Generalized Groundwater Contamination Water Table
4
Generalized Vapor Intrusion Dissolved contamination in groundwater
5
Groundwater Contamination
6
Soil Gas Investigation 2012-2013
7
Public Involvement Two Public Meetings November 12, 2013 Five Community Group Meetings “Office hours” sessions MPCA Project website E-mail distribution list for interested parties Widely covered in local media
8
Sub-slab Sampling
9
Building Mitigation
10
Current Status as of 2/19/14
11
Current Status Sub-slab Sampling 236 properties sampled Sub-slab Sampling Results 126 properties over 20 ug/m3 Mitigation Systems 56 installed and verification testing complete 30 installation process begun
12
Additional Remedial Actions
13
Questions & Discussion
14
Soil and Groundwater Cleanup 1981“absorption pit” removed addressing the soil contamination. 1984 Response Order by Consent between MPCA and General Mills 1985 Extraction and Treatment of Contaminated Groundwater began. 2010 Groundwater system turned off. TCE concentrations below the cleanup concentrations established in the Consent Order
15
November 6, 2013 Mailing to Residents