East Hope VFD Butler Station Construction General Contractor: East Hope VFD Framing Contractor: Brent Lockwood & Norm Sommerfeld 2003
2
Conceptual Plan Architect : Fran Schuck Rendering: Ed Butler
3
Fire Station Lot 05/31/03
4
Clearing 06/07/03 Work Donated by Leonard Butler Jr.
5
Excavation 08/04/03 Bellomy Construction
6
Pouring Footings 08/22/03 Brent Lockwood, Norm Sommerfeld & Volunteers
7
Constructing Forms 08/18/03 Brent Lockwood, Norm Sommerfeld & Volunteers
8
Foundation Forms 08/24/03 Brent Lockwood, Norm Sommerfeld & Volunteers
9
Bedding Sand 09/01/03 East Hope VFD
10
Placing Rebar 09/04/03 East Hope VFD & Samowen VFD
11
Pouring Slab 09/05/03 Craig Comstock, Todd Woods & Volunteers
12
Wall Raising 09/10/03 Brent Lockwood, Norm Sommerfeld & Volunteers
14
Sheathing 09/16/03 Brent Lockwood & Norm Sommerfeld
15
Placing Beam 09/16/03 Brent Lockwood & Norm Sommerfeld
16
Trusses 09/26/03 Brent Lockwood, Norm Sommerfeld & Bob Cordes
17
Digging Power Line 10/01/03 Work Donated By Bruce Stutzke
18
Fire Station 11/08/04
20
Dedication 06/04
24
Butler Family 07/18/04
25
Volunteers 05/18/05
26
The End