LEARNED LESSONS: Propane Tanker Rollover Anhydrous Ammonia Release HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
2
BIOGRAPHY Hired as a regulator for HazMat programs ▫HMBP, USTs, Haz Waste, Storm water, etc. Hazardous Materials Responder 23+ years State Certified Hazardous Materials Instructor ▫18 Years for CSTI ▫FRA, FRO, Tech/Spec ▫Identification of Unknown Chemicals B.S. Geology – Chico State Incident Response Team Leader DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
3
AWARD-WINNING HAZ MAT TEAM Urban Shield – Haz Mat Division DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48 2011 – 3 rd Place (with Richmond FD)2012 – 1 st Place 2013 – 2 nd and 3 rd Places
4
INCIDENTS Propane Tanker Rollover Anhydrous Ammonia Release HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
5
PROPANE TANKER ROLLOVER October 7, 2013, 3:24 am – 5:45 pm ▫Allied Propane tanker overturned ▫Carlson Blvd. at I-80 E on-ramp, El Cerrito Unified Command ▫El Cerrito FD (IC) ▫Richmond FD (Operations) ▫Contra Costa Haz Mat (Haz Mat Group/ Entry) HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
6
PROPANE TANKER ROLLOVER Unified Command (cont’d) ▫Other agencies: CHP, Cal Trans, Chevron FD, American Red Cross, Cities of El Cerrito/Richmond Hazards of propane ▫Evacuation of immediate area east and west of I-80 Nearby motel Gas station HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
7
PROPANE TANKER ROLLOVER Multiple Entries &Tactical Groups ▫Reconnaissance ▫Continuous LEL/air monitoring of exclusion zone by Area RAE and Hand Held Monitors (CGI) ▫Patching ▫Up righting Master fog - El Cerrito and Richmond FDs Allied Propane Tow companies HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
8
PROPANE TANKER ROLLOVER Recon/Area RAE set-up, Block Storm Drain HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
9
PROPANE TANKER ROLLOVER Patching – 9:05 am HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
10
PROPANE TANKER ROLLOVER Patch applied/leak slowed – 10:00 am HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
11
PROPANE TANKER ROLLOVER Decoupled tanker/offloading commenced – 12:30 pm HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
12
PROPANE TANKER ROLLOVER Safety briefing prior to up righting – 1:45 pm HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
13
PROPANE TANKER ROLLOVER Up righting - 2:14 pm HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
14
PROPANE TANKER ROLLOVER Up righting HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
15
PROPANE TANKER ROLLOVER Tanker up righted – 4:00 pm HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
16
PROPANE TANKER ROLLOVER HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
17
PROPANE TANKER ROLLOVER The day after... HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
18
PROPANE TANKER ROLLOVER Lessons Learned: ▫SAFETY Flammability / Explosion hazard of propane ▫Importance of ICS/Unified Command ▫Specialized training for tow companies for haz mat transportation incidents CHP working on new guidelines In the interim, include tow operator safety in Site Safety Plan ▫Continuous LEL/air monitoring ▫Maintenance of zones (exclusion, CRZ, support) ▫I-80 closure? HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
19
ANHYDROUS AMMONIA RELEASE October 25, 2013, 2:43 – 8:00 am ▫PG&E Gateway Station, Antioch Unified Command ▫Contra Costa Fire Eng. 81 (IC) ▫Contra Costa Haz Mat (Haz Mat Group) ▫PG&E (Responsible Party Incident Comander) HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
20
ANHYDROUS AMMONIA RELEASE Situation ▫Small leak at two valves on piping system to anhydrous ammonia chiller ▫System shutdown on 10/24/13 for winter ▫Readings of ammonia monitors at 7-40 ppm HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
21
ANHYDROUS AMMONIA RELEASE Diagram of facility HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
22
ANHYDROUS AMMONIA RELEASE Outside of exclusion zone HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
23
ANHYDROUS AMMONIA RELEASE Chiller system HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
24
ANHYDROUS AMMONIA RELEASE Fixed Ammonia monitor HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
25
ANHYDROUS AMMONIA RELEASE Haz Mat makes entry – 5:40 am HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
26
ANHYDROUS AMMONIA RELEASE Entry ▫Objectives Safety – slips, trips, falls; tie off ladder Tighten bolts on flanges Multiple entries – tighten two valves ▫1 st entry – 5:40 am; 1 of 2 valves tightened ▫2 nd entry – 6:40 am – 2 of 2 valves tightened Leak stopped – 7:00 am ▫Ammonia readings subsided HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
27
ANHYDROUS AMMONIA RELEASE After leak stopped; one of the valves HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
28
ANHYDROUS AMMONIA RELEASE After leak stopped; one of the valves HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
29
ANHYDROUS AMMONIA RELEASE Lessons Learned ▫SAFETY ▫Continuous air monitoring – movement of Incident Command Post due to wind shift ▫Importance of pre-emergency planning with local responders HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
30
DECEMBER 10, 2013 BOARD OF SUPERVISORS Contra Costa Haz Mat, Richmond Fire, and El Cerrito Fire were commended by the County Supervisors for their efforts during the propane tanker rollover and ammonia release incidents. DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48
31
First Responder Awareness Safety Isolate/ Deny entry Notify
32
Safety S N I S I N
33
Upwind Upstream Upgrade Safe Approach 3 UP’s
34
On-scene Safety Guidelines Do not rush to assist Treat unknowns as hazardous until determined otherwise Safe distance; binoculars, rule of thumb Never eat, drink or smoke in the area Do not inhale, touch or ingest Eliminate all ignition sources – flares Reassess continually
35
QUESTIONS? (thank you.) HAZMAT DECEMBER 16, 2013 | CAER SAFETY SUMMIT 48