Idaho Power Update JSIS Meeting March 3, 2015
2
Infrastructure PMU installations: 24 PMU sites: 15 WISP PMU Installations: 5 WISP PMU sites: 3 WISP installations are not redundant New PMU installations: in 2016 (7), in 2017(5) New PMU on all new generation interconnections greater than 10 MW
3
Data Management Streaming data in C37.118 at 30 frames/sec. No substation PDCs – direct to central PDCs Open PDC platform for archiving and viewing the data Data storage goals – 1 year of data for planning and 3 months data for operations. Data sent to Peak RC Sharing data with BPA, PEAK RC, EPRI, WSU and PAC
4
Engineering Applications Generator Model Validation GE PSLF Model Validation Post-Event Analysis (Schweitzer Engineering Laboratory SynchroWave and PSO). WSU developmental software for oscillation and voltage stability Working on developing Event Detection Tools
5
Control Room Applications Presently NONE
6
Expectations from WISP, JSIS, NASPI Exchange of lessons learned Gather information from utilities that have experience in applying synchrophasor data.