Download presentation
Presentation is loading. Please wait.
Published byCarlo Harkless Modified over 10 years ago
1
AGARTALA, TRIPURA REVIEW MEETING ON RD SCHEMES UNDER THE CHAIRMANSHIP OF HON’BLE MINISTER, RD DEPTT. Date:12.04.13 at 10:30 hrs Venue: CONFERENCE HALL - II
2
Convergence of MGNREGA with line departments – Financial and physical achievement, 2012-13 as on 31.03.13 Dist Fund Agra.Horti.FisherySeri.ForestARDDADCOtherTotal ((Rs.in lakh) Requirement Fund placed Actual Exp % of exp Unutilized fund Exp. Uploaded in MIS Amt. Pending for MIS entry No. of MD generated
3
Financial report under MGNREGA during the year 2012-2013 (Rs in lakh) District Actual OB as on 1.4.12 Central share received in current FY Misc (as per last review meeting report) State share released in current FY Total fund availability Total expenditure (As per MIS report as on 31/03/13) % of Exp. Balance fund DLI STH WST NTH UKT KHW GMT SPJ Total
4
Physical performance report under MGNREGA during the year 2012-13 as per(MIS report dated on 31/03/13) District Total job card issued Total employment demanded Total employment provided Persondays genarated Average mandays HHs Completed 100 days Persondays generated for women % of women participation DLI STH WST NTH UKT KHW GMT SPJ Total
5
Status of SC/ST updation in Jobcards District As on 31 st March, 2013 Total Job Cards% of SCs% of STs DLI GMT KHW NTH SPJ STH UKT WST State Total 5
6
MGNREGA- FUND UTILIZATION STATUS as on 31.03.13 District Total fund available Projected Exp. As per LB Expenditure Incurred (As per MIS) Gap between projection and achievement % of Expenditure DLI GMT KHW NTH SPJ STH UKT WST Total
7
MGNREGA-Physical performance as per MIS (31.03.12) District Projected Persondays as per LB Persondays generated Gap between Projection and achievement Projected Avg. PD as per LB Average manday’s Gap between Projection and achievement of Avg. Mandays DLI GMT KHW NTH SPJ STH UKT WST Total
8
Participation of Women, SC & ST in MGNREGA Works upto 31.03.13 Name of District Total Personday’s Generated % of Women Participation % of SC Participation % of ST Participation DLI GMT KHW NTH SPJ STH UKT WST Total National
9
DistrictsTarget As per LBAchievement % of Achievement DLI GMT KHW NTH SPJ STH UKT WST State Performance against approved LB (FY 2012-13) Persondays generated (In Lakhs) As on 31 st March, 2013 9
10
WORKS COMPLETION RATE AS PER MIS on DT. 31.03.13 District 2012-13 Total works taken up including Spill over Total works completed % of completion DLI GMT KHW NTH SPJ STH UKT WST Total
11
District wise asset created under MGNREGA (In Nos.) As per MIS as on 31.03.13 District Rural Connectivity Flood Control Water Conservation & Water Harvesting Drought Proofing Micro Irrigation Provision of Irrigation Facility to land development Renovation of Traditional water bodies Land Development Others Total DLI GMT KHW NTH SPJ STH UKT WST Total
12
District Total No. of GP/ADC Village No. of GPs/ADC Villages where BNRGSK taken up for construction No. of Blocks No. of Blocks where BNRGSK taken up for construction 2012-13 Taken upCompTaken upComp DLI GMT KHW NTH SPJ STH UKT WST Total Bharat Nirman Rajiv Gandhi Sewa Kendra – Progress up to 31 st March, 2013
13
Wage : Material Ratio as per MIS (dt. 31.03.13) District Total Expenditure Incurred (As per MIS dt. 31.03.13) Expenditure on wages Expenditure on Materials Wage : Material ratio of Exp. [60:40] DLI GMT KHW NTH SPJ STH UKT WST Total
14
V&MC MEETING, 2012-13 DISTRICTTARGET NO. OF MEETINGS HELD DATES OF MEETING WHETHER UPLOADED IN MIS STATUS OF 2 ND INSTALLMENT DLI GMT KHW NTH SPJ STH UKT WST
15
SOCIAL AUDIT, 2012-13 Districts No. of GPs/VCs No. of GP/VC covered through GRAM SABHA 4 th Qtr. No. of GP/VC through SoSSMBC 4 th Qtr. % of Coverage through Whether uploaded in MIS Gram Sabha MBC DLI GMT KHW NTH SPJ STH UKT WST Total
16
ICT INFRASTRUCTURE & CONNECTIVITY DISTRICTNO. OF GP/VC Total No. of Computer / Laptop supplied Total No. of GP/VC Internet connected DLI GMT KHW NTH SPJ STH UKT WST Total
17
Bank wise coverage of BC model under MGNREGA (State Level Completion Up to 31 st March, 2013) Bank No. of GP/VCs to be covered No. GP/ADC villages covered Total No. of Registered Job card holders Total No. of Enrolment completed Total No. of Smart card issued No. of Smart cards distributed No. of villages where payment started through BC Model TGB TSCB SBI UBI Total
18
DistBank No. of GP/VCs to be covered No. GP/ADC villages covered Total No. of Registered Job card holders Total No. of Enrolment completed Total No. of Smart card issued No. of Smart cards distribut ed No. of villages where payment started through BC Model TGB TSCB SBI UBI Total Status of coverage of payment of wages under BC Model up to 31 st March, 2013
19
Present Status of appointment of Ombudsman Name of the DistrictNo. of Blocks Ombudsman in Position DLI GMT KHW NTH SPJ STH UKT WST Total
20
STATUS OF e-FMS IMPLEMENTATION District No of e-FMS Blocks No of e-FMS Panchayat DSC Enrollment Total FTO Generated FTO send to Financial Institution FTO Processed by Financial Institution Target Achieve ment No of FTO No of Transacti on No of FTO No of Transact ion DLI GMT KHW NTH SPJ STH UKT WST Total
21
Physical Achievement under IAY, 2012-13 District TargetSanctionedCompleted % of Completion NormalRoFRTotalNormalRoFRTotalNormalRoFRTotal DLI GMT KHW NTH SPJ STH UKT WST Total
22
Financial Achievement under IAY, 2012-13 District Total Available fundsFunds Utilized % of fund Utilization NormalRoFRTotalNormalRoFRTotal DLI GMT KHW NTH SPJ STH UKT WST Total
23
Coverage of Target Groups of IAY District Target Coverage with Percentage (%) RM {15%}SC {20%}ST {40%} Others {25%}WomenPH {3%} DLI GMT KHW NTH SPJ STH UKT WST
24
Physical Achievement under SGSY, 2012-13 Name of Districts SHG formation1st Gradation2nd Gradation T A TATA DLI GMT KHW NTH SPJ STH UKT WST Total
25
Financial Achievement under SGSY, 2012-13 Name of Districts OB Funds Received Total Availability of fund Expenditure CentralState Subsidy (55%) RF (10%) Training (10%) Infra. (25%) Total (%) DLI GMT KHW NTH SPJ STH UKT WST Total
26
Financial Achievement under DRDA Admin, 2012-13 Name of Districts Fund ReceivedExpenditure OBCentralStateMisc.TotalSalary Non Salary- 30% of Salary Exp. Total DLI GMT KHW NTH SPJ STH UKT WST Total
27
DCC Bills (Rs.in lakh) Dist. Amt. of AC Bills pending for adjustmen t through DCC Bills as on 1.4.12 Amt. drawn through AC bills during 2011-12 Total amount of AC Bills (2+3) Amt. of DCC bills submitted upto 31 st March, ‘12 Year wise amount of AC Bills pending for adjustment through DCC bills after submission upto 31 st March, ’13 (4- 5) Upto 05-06 06-0707-0808-0909-1010-1111-12 1 23456789101112 DLI GMT KHW NTH SPJ STH UKT WST
28
deÉh¡c
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.