SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting for SunGuide Release 4.1 October 14, 2008 1
2
October 14, 2008SunGuide 4.1 TRR 2 Introductions
3
October 14, 2008SunGuide 4.1 TRR 3 Agenda Date / TimeItemLead October 14 8:30 – 9:30 Test Readiness Review (TRR) Meeting: Discuss project status Discuss testing process Review test procedures Discuss lab configuration Open discussion Dellenback Robert Heller October 14 9:30 – 10:00 Training on new functionalityRoger Strain October 14 10:00 – 10:15 Break October 14 10:15 – 12:00 IC-1: Admin Editor (AE) IC-2: Graphical User Interface (GUI) SwRI Team October 14 1:00 – 5:30 IC-3: Data Archive (DA) IC-4: Probe Fusion (PF) IC-5: Automatic Vehicle Identification/License Plate Reader SwRI Team October 15 8:30 – 12:00 IC-6: Alternate Routes (AR) IC-7: Travel Times (TvT) IC-8: Miscellaneous (MISC) IC-9: Travel Time Computation (TVTC) SwRI Team October 15 1:00 – 5:30 Footprints Testing: 659, 678, 688, 689, 735, 741, 749, 755, 777, 793, 796, 803, 807, 809, 815,817, 822, 825, 826, 836 Regression Tests: D5 FL ATIS Transition Retest / revisit open issues SwRI Team October 16 8:30 – 11:00 Wrap up discussions: IV&V Deployment activities planned FDOT CO All
4
October 14, 2008SunGuide 4.1 TRR 4 Logistics Test location: –ITS Demo Lab Breaks: –Rolling Lunch –SwRI Cafeteria Internet: –Available in the lobby (100baseT connection) Restrooms Lobby Demo Lab
5
October 14, 2008SunGuide 4.1 TRR 5 Current Project Status Release 4.1 Development Complete 79 Requirements SwRI has exercised the system –Unit testing –Ad hoc testing –Dry runs of the SICP
6
October 14, 2008SunGuide 4.1 TRR 6 Architecture: What Changed?
7
October 14, 2008SunGuide 4.1 TRR 7 Test Hardware Layout
8
October 14, 2008SunGuide 4.1 TRR 8 Discuss Lab Configuration
9
October 14, 2008SunGuide 4.1 TRR 9 Discuss Lab Configuration : SwRI Server Farm SAN: –Two drive bays –6 fiber connected hosts FAT: –Four DL380s: Fermat Pythagoras Laplace Kepler Development: –Six DL380s –Eight DL370s
10
October 14, 2008SunGuide 4.1 TRR 10 Environment Note Note that SwRI has both “real” equipment and simulators in the lab There are times that the simulators “mis-behave” and we find ourselves “re-testing” to achieve the results The “re-tests” do NOT require software modifications For example, one time a drunk driver took out the power (actually causing a short on the power lines and toasted a number of devices such as voice mail) to SwRI and the Cortec Codecs have never been the same. SwRI has other project’s that will occasionally (accidentally) “hit” our development devices
11
October 14, 2008SunGuide 4.1 TRR 11 Discuss Testing Process Purpose: –Review preparations for testing –Walk through the test procedures at a very high level and determine if anyone has any comments Ground Rules: –Testing will not depart from the written procedures –Any requested “ad hoc” testing will occur after the formal testing process –Re-writing of requirements / scope additions will be captured for future consideration Approvals: –FDOT/SwRI will witness each test case (on “Master SICP”) –At the conclusion, FDOT will sign SICP cover page to acknowledge all tests were executed as written/noted in the “Master SICP”
12
October 14, 2008SunGuide 4.1 TRR 12 How Testing Will Occur For each Integration Case (IC): –SwRI will explain the objective of the IC –Requirements will be reviewed –A “reader” will walk through each test case (see next slide for an ‘example’ test case) –An “operator” will perform the GUI actions –Results will be captured –Note: Enhancements will be captured for future review by FDOT
13
October 14, 2008SunGuide 4.1 TRR 13 Test Case Example
14
October 14, 2008SunGuide 4.1 TRR 14 Review Test Procedures IC-1: Admin Editor (AE) IC-2: Graphical User Interface (GUI) IC-3: Data Archive (DA) IC-4: Probe Fusion (PF) IC-5: Automatic Vehicle Identification/License Plate Reader (AVI/LPR) IC-6: Alternate Routes (AR) IC-7: Travel Times (TvT) IC-8: Miscellaneous (MISC) IC-9: TvT Computation (TvTC)
15
October 14, 2008SunGuide 4.1 TRR 15 General Discussion Questions About Test Cases?
16
October 14, 2008SunGuide 4.1 TRR 16 Open Discussion
17
October 14, 2008SunGuide 4.1 TRR 17 Agenda Date / TimeItemLead October 14 8:30 – 9:30 Test Readiness Review (TRR) Meeting: Discuss project status Discuss testing process Review test procedures Discuss lab configuration Open discussion Dellenback Robert Heller October 14 9:30 – 10:00 Training on new functionalityRoger Strain October 14 10:00 – 10:15 Break October 14 10:15 – 12:00 IC-1: Admin Editor (AE) IC-2: Graphical User Interface (GUI) SwRI Team October 14 1:00 – 5:30 IC-3: Data Archive (DA) IC-4: Probe Fusion (PF) IC-5: Automatic Vehicle Identification/License Plate Reader SwRI Team October 15 8:30 – 12:00 IC-6: Alternate Routes (AR) IC-7: Travel Times (TvT) IC-8: Miscellaneous (MISC) IC-9: Travel Time Computation (TVTC) SwRI Team October 15 1:00 – 5:30 Footprints Testing: 659, 678, 688, 689, 735, 741, 749, 755, 777, 793, 796, 803, 807, 809, 815, 817, 822, 825, 826, 836 Regression Tests: D5 FL ATIS Transition Retest / revisit open issues SwRI Team October 16 8:30 – 11:00 Wrap up discussions: IV&V Deployment activities planned FDOT CO All
18
October 14, 2008SunGuide 4.1 TRR 18 Agenda Date / TimeItemLead October 14 8:30 – 9:30 Test Readiness Review (TRR) Meeting: Discuss project status Discuss testing process Review test procedures Discuss lab configuration Open discussion Dellenback Robert Heller October 14 9:30 – 10:00 Training on new functionalityRoger Strain October 14 10:00 – 10:15 Break October 14 10:15 – 12:00 IC-1: Admin Editor (AE) IC-2: Graphical User Interface (GUI) SwRI Team October 14 1:00 – 5:30 IC-3: Data Archive (DA) IC-4: Probe Fusion (PF) IC-5: Automatic Vehicle Identification/License Plate Reader SwRI Team October 15 8:30 – 12:00 IC-6: Alternate Routes (AR) IC-7: Travel Times (TvT) IC-8: Miscellaneous (MISC) IC-9: Travel Time Computation (TVTC) SwRI Team October 15 1:00 – 5:30 Footprints Testing: 659, 678, 688, 689, 735, 741, 749, 755, 777, 793, 796, 803, 807, 809, 815, 817, 822, 825, 826, 836 Regression Tests: D5 FL ATIS Transition Retest / revisit open issues SwRI Team October 16 8:30 – 11:00 Wrap up discussions: IV&V Deployment activities planned FDOT CO All
19
October 14, 2008SunGuide 4.1 TRR 19 Agenda Date / TimeItemLead October 14 8:30 – 9:30 Test Readiness Review (TRR) Meeting: Discuss project status Discuss testing process Review test procedures Discuss lab configuration Open discussion Dellenback Robert Heller October 14 9:30 – 10:00 Training on new functionalityRoger Strain October 14 10:00 – 10:15 Break October 14 10:15 – 12:00 IC-1: Admin Editor (AE) IC-2: Graphical User Interface (GUI) SwRI Team October 14 1:00 – 5:30 IC-3: Data Archive (DA) IC-4: Probe Fusion (PF) IC-5: Automatic Vehicle Identification/License Plate Reader SwRI Team October 15 8:30 – 12:00 IC-6: Alternate Routes (AR) IC-7: Travel Times (TvT) IC-8: Miscellaneous (MISC) IC-9: Travel Time Computation (TVTC) SwRI Team October 15 1:00 – 5:30 Footprints Testing: 659, 678, 688, 689, 735, 741, 749, 755, 777, 793, 796, 803, 807, 809, 815, 817, 822, 825, 826, 836 Regression Tests: D5 FL ATIS Transition Retest / revisit open issues SwRI Team October 16 8:30 – 11:00 Wrap up discussions: IV&V Deployment activities planned FDOT CO All