SIS 2006 Update April 26, 2006. Big Picture Design Phase – April 21  Conceptual Design 99% Physical Designs Design Phase – May 30 –Configuration Documentation.

Similar presentations


Presentation on theme: "SIS 2006 Update April 26, 2006. Big Picture Design Phase – April 21  Conceptual Design 99% Physical Designs Design Phase – May 30 –Configuration Documentation."— Presentation transcript:

1 SIS 2006 Update April 26, 2006

2 Big Picture Design Phase – April 21  Conceptual Design 99% Physical Designs Design Phase – May 30 –Configuration Documentation & Testing Preparatory Projects Phase – April 24 – May 30 –Reconfigure K12/HAN/Library, Replace current HECN routers, local projects Implementation – ?June 12? – ?August 18? –Details to be determined

3 Current Risks Weather in the Red River Valley –Fiber runs should be completed in time Grand Forks Fiber –Delays in getting approvals and sign-offs One month delay in DCN turnover

4 Good News Extra month for testing DCN’s new location on schedule

5 More Information Next IVN Session = May 24 www.stagenet.nd.gov/projects/infrastructure/index.html –Biweekly status reports –Conceptual diagrams