Download presentation
Presentation is loading. Please wait.
Published byKarina Sergent Modified over 9 years ago
1
T ransmission I mprovement For the Red River Valley & West Central Minnesota
2
Red River Valley Area Fargo-Moorhead.
3
Red River Valley
5
Load 2004: 1029 MW 2011: 1223 MW 2016: 1315 MW
6
Red River Valley
7
Studies Identified Several Critical Contingencies Loss of Bulk Lines Center-Jamestown-Maple River Dorsey-Forbes Local load-serving benefits Alexandria St. Cloud Loss Reduction of approximately 100 MW Real-time Installation of Bemidji – Grand Rapids 230 kV Line shows delay of project need by approximately 4 years Projected need in Fargo area in 2018
8
Alexandria Area Loss of Grant County – Elbow Lake Line causes low voltages Breaker and capacitor addition postpones local-area need until 2013 or 2014 Loss of Elmo – Inman or Verndale – Wing River also causes problems when combined with Grant County line
9
St. Cloud Area Loss of Benton County – Granite City 115 kV DCTL causes low voltages and severe overloads St. Regis load dropped automatically Cannot reconfigure Granite City without new area source to provide support
10
The End
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.