Download presentation
Presentation is loading. Please wait.
Published byCatherine Hockin Modified over 9 years ago
1
Installation: the plan
2
Reality
3
Pressure dome: the problem
4
The Rack, Mark I
5
Scan Head, in place, finally
6
Pressure Vessel “Doghouse” Equipment Racks - Cable Run 6 144Z AMS Configuration
7
AMS Mosaic 3/1/13 7 Magna, UT Kennecott Smelter
8
Kennecott Stack 3/1/13 8 Kennecott Stack
9
West Valley City, UT 3/1/13 DRAFT9 RSAC
10
AirCell Issues Leaver Arm Measurements for Applinix Installed electronics into IPM box Integrate IPM and conduct ground tests Reconfigure AirCell for static IP and reset router Connect IPM to AirCell and AMS Test Ground Processing Software Connection
11
Wasatch Front 3/29/13 -112.245 42.069 7,5,3 7.6m
12
Wasatch Front 3/29/13
13
Utah Lake 3/29/13 Imagery will be evaluated by USGS for hot spring monitoring project
14
Questions
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.