Project Status Accident Data Comparison with Other State Routes Alternatives Next Steps
3
Project Study Report (Complete ) Project Report (Jan 2015) Environmental (Jan 2015) Design (June/2016) Construction (July 2017)
4
Highway 17 Santa Cruz/Santa Clara County Highway 50 El Dorado County Highway 18 San Bernardino County
8
* = With Concrete Barrier * * DISTCOUNTYHIGHWAYPEAKPM1PM2LENGTHADT4/1/2002 TO 03/31/2012 (10 YEARS) ELEVATION (MILE)(1000)ACCIDENT RATES (MVM) (FT) ACTUALAVERAGE (Expected) FATF+ITOTALFATF+ITOTAL 5SANTA 171850 612.56.558.70.0060.531.750.0100.421.08 CRUZ 4SANTA07.1 60.20.0040.351.160.0100.350.92 CLARA TOTAL1713.6 DISTCOUNTYHIGHWAYPEAKPM1PM2LENGTHADT4/1/2002 TO 03/31/2012 (10 YEARS) ELEVATION (MILE)(1000)ACCIDENT RATES (MVM) (FT) ACTUALAVERAGE (Expected) FATF+ITOTALFATF+ITOTAL 3EL 504009 23.4431.558.1118.40.0060.240.530.0070.160.44 DORADO DISTCOUNTYHIGHWAYPEAKPM1PM2LENGTHADT4/1/2002 TO 03/31/2012 (10 YEARS) ELEVATION (MILE)(1000)ACCIDENT RATES (MVM) (FT) ACTUALAVERAGE (Expected) FATF+ITOTALFATF+ITOTAL 8SAN 184360 8.317.79.417.00.0480.491.020.0080.280.68 BERNARDINO Highway 17 Highway 50 Highway 18
9
SR-18 SBd CO10 YEAR- 1hr duration PREClPITATlON (IN) LOCATION ELEVATION (FT)AVEPEAKPEAKLATITUDELONGITUDE PM 15051.221.534.17161-117.27828.29 25001.371.6834.1938-117.278611.25 35071.541.8934.2234-117.293514.3 42201.531.8934.2329-117.294917.068 SR-17 SCR/SCL Co10 YEAR- 1hr duration PRECIPITATION (IN)LOCATION ELEVATION (FT)AVEPEAKLATITUDELONGITUDE PMPM 6901.441.6837.0676-121.99656.00 13481.591.8737.1118-121.976310.00 17861.641.9537.1428-121.985212.50 6211.41.6537.2036-121.991/ 5.00 3481.151.3537.225'-121.9771 7.00 SR-50 ED Co10 YEAR- 1hr duration PRECIPITATION (IN)LOCATION ELEVATION (FT)AVEPEAKLATITUDELONGITUDE PMPM 2990 0.760.879.38.7373-120.707823.44 30940.7710.89338.7353-120.681825.00 34550.7910.91838.744-120.649327.00 36730.8320.96838.7491-120.613929.00 39370.8771.0238.7608-120.58131.00
10
Ten Year Data 4/1/02 - 3/31/12 - Fatal Collisions = 13 - Injury Collisions = 79 - Property Damage = 39 Total Collisions = 131 Fatalities = 16 Injuries = 157
11
Concrete Barrier Metal Beam Guardrail Cable Barrier Delineators Reconfigure Lanes
17
NO BUILD
18
Review All Input Received Examine Effectiveness of Each Alternative Solicit Additional Comments from Stakeholders Install Delineators on Top Section of SR-18 September - Present Proposed Solution for Entire Route (Lake Arrowhead Disaster Meeting)