 Project Status  Accident Data  Comparison with Other State Routes  Alternatives  Next Steps.

Similar presentations


Presentation on theme: " Project Status  Accident Data  Comparison with Other State Routes  Alternatives  Next Steps."— Presentation transcript:

1

2  Project Status  Accident Data  Comparison with Other State Routes  Alternatives  Next Steps

3  Project Study Report (Complete )  Project Report (Jan 2015)  Environmental (Jan 2015)  Design (June/2016)  Construction (July 2017)

4  Highway 17 Santa Cruz/Santa Clara County  Highway 50 El Dorado County  Highway 18 San Bernardino County

5

6

7

8 * = With Concrete Barrier * * DISTCOUNTYHIGHWAYPEAKPM1PM2LENGTHADT4/1/2002 TO 03/31/2012 (10 YEARS) ELEVATION (MILE)(1000)ACCIDENT RATES (MVM) (FT) ACTUALAVERAGE (Expected) FATF+ITOTALFATF+ITOTAL 5SANTA 171850 612.56.558.70.0060.531.750.0100.421.08 CRUZ 4SANTA07.1 60.20.0040.351.160.0100.350.92 CLARA TOTAL1713.6 DISTCOUNTYHIGHWAYPEAKPM1PM2LENGTHADT4/1/2002 TO 03/31/2012 (10 YEARS) ELEVATION (MILE)(1000)ACCIDENT RATES (MVM) (FT) ACTUALAVERAGE (Expected) FATF+ITOTALFATF+ITOTAL 3EL 504009 23.4431.558.1118.40.0060.240.530.0070.160.44 DORADO DISTCOUNTYHIGHWAYPEAKPM1PM2LENGTHADT4/1/2002 TO 03/31/2012 (10 YEARS) ELEVATION (MILE)(1000)ACCIDENT RATES (MVM) (FT) ACTUALAVERAGE (Expected) FATF+ITOTALFATF+ITOTAL 8SAN 184360 8.317.79.417.00.0480.491.020.0080.280.68 BERNARDINO Highway 17 Highway 50 Highway 18

9 SR-18 SBd CO10 YEAR- 1hr duration PREClPITATlON (IN) LOCATION ELEVATION (FT)AVEPEAKPEAKLATITUDELONGITUDE PM 15051.221.534.17161-117.27828.29 25001.371.6834.1938-117.278611.25 35071.541.8934.2234-117.293514.3 42201.531.8934.2329-117.294917.068 SR-17 SCR/SCL Co10 YEAR- 1hr duration PRECIPITATION (IN)LOCATION ELEVATION (FT)AVEPEAKLATITUDELONGITUDE PMPM 6901.441.6837.0676-121.99656.00 13481.591.8737.1118-121.976310.00 17861.641.9537.1428-121.985212.50 6211.41.6537.2036-121.991/ 5.00 3481.151.3537.225'-121.9771 7.00 SR-50 ED Co10 YEAR- 1hr duration PRECIPITATION (IN)LOCATION ELEVATION (FT)AVEPEAKLATITUDELONGITUDE PMPM 2990 0.760.879.38.7373-120.707823.44 30940.7710.89338.7353-120.681825.00 34550.7910.91838.744-120.649327.00 36730.8320.96838.7491-120.613929.00 39370.8771.0238.7608-120.58131.00

10 Ten Year Data 4/1/02 - 3/31/12 - Fatal Collisions = 13 - Injury Collisions = 79 - Property Damage = 39 Total Collisions = 131 Fatalities = 16 Injuries = 157

11  Concrete Barrier  Metal Beam Guardrail  Cable Barrier  Delineators  Reconfigure Lanes

12

13

14

15

16

17 NO BUILD

18  Review All Input Received  Examine Effectiveness of Each Alternative  Solicit Additional Comments from Stakeholders  Install Delineators on Top Section of SR-18  September - Present Proposed Solution for Entire Route (Lake Arrowhead Disaster Meeting)