Presentation is loading. Please wait.

Presentation is loading. Please wait.

AMS Certification Requirement AKA: Grading. All commodity meat & poultry processing must be performed supervision of AMS grader.

Similar presentations


Presentation on theme: "AMS Certification Requirement AKA: Grading. All commodity meat & poultry processing must be performed supervision of AMS grader."— Presentation transcript:

1 AMS Certification Requirement AKA: Grading

2 All commodity meat & poultry processing must be performed supervision of AMS grader

3 GMR, Standard Yield, & GRO

4 All commodity meat & poultry processing must be performed supervision of AMS grader GMR, Standard Yield, & GRO Processor pays for grader

5 Waiver of Grading Requirement Insufficient time to secure grader

6 Waiver of Grading Requirement Insufficient time to secure grader Cost of grader excessive

7 Waiver of Grading Requirement Insufficient time to secure grader Cost of grader excessive State needs product immediately

8 Minimum Grading Services for Poultry

9 Formulation verification Processing & fabrication procedure verification Batter & breading verification, if applicable Portion control & individual weights Metal detection Freezing requirements Test weighing, and Condition Examination Minimum Grading Services for Poultry

10 PY-210 (PPA) Receiving Certificate

11 Documentation of weight of raw commodity received into processing plant PY-210 (PPA) Receiving Certificate

12 Type of commodity received PY-210 should include:

13 Type of commodity received Marked weight of lot, including shortages or overages PY-210 should include:

14 Type of commodity received Marked weight of lot, including shortages or overages Notation if processor intends to substitute with commercial product PY-210 should include:

15 Type of commodity received Marked weight of lot, including shortages or overages Notation if processor intends to substitute with commercial product Contract number, DO, & Notice to Deliver PY-210 should include:

16 Type of commodity received Marked weight of lot, including shortages or overages Notation if processor intends to substitute with commercial product Contract number, DO, & Notice to Deliver Details of test weighing PY-210 should include:

17 PY-209 (PRA) Reprocessing Certificate

18 Documents details of processing (used to determine if GMR met) PY-209 (PRA) Reprocessing Certificate

19 Starting raw weight of commodity put into production State compares weight on PY-209 to starting weight on PY-210 PY-209 (PRA) Reprocessing Certificate includes:

20 Starting raw weight of commodity put into production State compares weight on PY-209 to starting weight on PY-210 Total weight of all finished end products PY-209 (PRA) Reprocessing Certificate includes:

21 Starting raw weight of commodity put into production State compares weight on PY-209 to starting weight on PY-210 Total weight of all finished end products Weight of all buy-backs Processor must reimburse or credit State Buy-backs not considered in GMR calculation PY-209 (PRA) Reprocessing Certificate includes:

22 Starting raw weight of commodity put into production State compares weight on PY-209 to starting weight on PY-210 Total weight of all finished end products Weight of all buy-backs Processor must reimburse or credit State Buy-backs not considered in GMR calculation Weight of all by-products produced Processor must reimburse or credit State PY-209 (PRA) Reprocessing Certificate includes:

23 Starting raw weight of commodity put into production State compares weight on PY-209 to starting weight on PY-210 Total weight of all finished end products Weight of all buy-backs Processor must reimburse or credit State Buy-backs not considered in GMR calculation Weight of all by-products produced Processor must reimburse or credit State Product condemnations Processor must replace losses exceeding 1% of raw commodity de- boned weight PY-209 (PRA) Reprocessing Certificate includes:

24 Starting raw weight of commodity put into production State compares weight on PY-209 to starting weight on PY-210 Total weight of all finished end products Weight of all buy-backs Processor must reimburse or credit State Buy-backs not considered in GMR calculation Weight of all by-products produced Processor must reimburse or credit State Product condemnations Processor must replace losses exceeding 1% of raw commodity de-boned weight Rework that has not been reincorporated into subsequent production runs PY-209 (PRA) Reprocessing Certificate includes:

25 Grading Certificates & Standard Yield

26 No official test weight procedures

27 Grading Certificates & Standard Yield No official test weight procedures All SY loads received at 36,000 pounds

28 Grading Certificates & Standard Yield No official test weight procedures All SY loads received at 36,000 pounds Processor not required to include grading certificate with MPR unless stipulated in SPA

29 Grading Certificates & Standard Yield No official test weight procedures All SY loads received at 36,000 pounds Processor not required to include grading certificate with MPR unless stipulated in SPA No buy-backs, by-products, or rework under SY

30 Grading Certification & Meat Inspection

31 All USDA commodity beef & pork must be inspected & certified by AMS graders

32 Grading Certification & Meat Inspection All USDA commodity beef & pork must be inspected & certified by AMS graders Processor must pay for grader

33 Meat Certification Grading Form (MCG-44)

34 1.Amount of commodity put into production

35 Meat Certification Grading Form (MCG-44) 1.Amount of commodity put into production 2.Number of pounds of end products produced

36 Meat Certification Grading Form (MCG-44) After production, grader issues certificate listing information about the production run

37 MCG-44 must include: 1.Date of production run

38 MCG-44 must include: 1.Date of production run 2.Starting pounds for each end product If production is multi-step process then starting commodity product & finished product may be on different MCG-44s, if so should be indicated on MCG-44

39 MCG-44 must include: 1.Date of production run 2.Starting pounds for each end product If production is multi-step process then starting commodity product & finished product may be on different MCG-44s, if so should be indicated on MCG-44 3.Name of end product being produced (& ounce size, if applicable)

40 MCG-44 must include: 1.Date of production run 2.Starting pounds for each end product If production is multi-step process then starting commodity product & finished product may be on different MCG-44s, if so should be indicated on MCG-44 3.Name of end product being produced (& ounce size, if applicable) 4.Amount of rework that will be included in current production and rework held for subsequent runs

41 MCG-44 must include: 1.Date of production run 2.Starting pounds for each end product If production is multi-step process then starting commodity product & finished product may be on different MCG-44s, if so should be indicated on MCG-44 3.Name of end product being produced (& ounce size, if applicable) 4.Amount of rework that will be included in current production and rework held for subsequent runs 5.Amount of product condemned & reason

42 MCG-44 must include: 1.Date of production run 2.Starting pounds for each end product If production is multi-step process then starting commodity product & finished product may be on different MCG-44s, if so should be indicated on MCG-44 3.Name of end product being produced (& ounce size, if applicable) 4.Amount of rework that will be included in current production and rework held for subsequent runs 5.Amount of product condemned & reason 6.Certificate number

43 MCG-44 must include: 1.Date of production run 2.Starting pounds for each end product If production is multi-step process then starting commodity product & finished product may be on different MCG-44s, if so should be indicated on MCG-44 3.Name of end product being produced (& ounce size, if applicable) 4.Amount of rework that will be included in current production and rework held for subsequent runs 5.Amount of product condemned & reason 6.Certificate number 7.Signature of AMS grader

44 Process Control Certification Program (PCCP) & Guaranteed Return Option (GRO)

45 Value-added grading service

46 Process Control Certification Program (PCCP) & Guaranteed Return Option (GRO) Value-added grading service AMS grader performs review of processor’s QC & HACCP procedures

47 Process Control Certification Program (PCCP) & Guaranteed Return Option (GRO) Value-added grading service AMS grader performs review of processor’s QC & HACCP procedures Once PCCP in place then can process under GRO if approved by FNS & AMS

48 Process Control Certification Program (PCCP) & Guaranteed Return Option (GRO) Value-added grading service AMS grader performs review of processor’s QC & HACCP procedures Once PCCP in place then can process under GRO if approved by FNS & AMS No grading certificates generated under GRO

49 AMS Grading Supervision Guarantees end products produced using commodity meat or poultry meet specifications listed on EPDSs, SEPDSs, & processing agreements


Download ppt "AMS Certification Requirement AKA: Grading. All commodity meat & poultry processing must be performed supervision of AMS grader."

Similar presentations


Ads by Google