1
Installation of the new end mirror 1Frans Mul - fmul@nikhef.nl8 July 2008
2
The goal, a new mirror Mirror 140 mm replaces mirror 80 mm in the I.M.C. 2Frans Mul - fmul@nikhef.nl8 July 2008
3
Index New design New marionette New mirror New recoil mass New gear box New installation tool Balancing Electrical test Installation in the I.M.C. end tower Numbers Future improvements 3Frans Mul - fmul@nikhef.nl8 July 2008
4
New design New design Design by: Roma 1 and Nikhef 8 July 2008Frans Mul - fmul@nikhef.nl4 A new design of the marionette and gear box due to a larger mirror ( 140 mm) and Reaction Mass. - The pitch between the wires from the mirror measures140 mm. - The pitch between the wires from the RM measures190 mm. - The mirror and RM range for- and backward is 55 mm. 55 mm 190 mm 140 mm
5
New marionette New marionette Frequency results by: Paola, Eric Pre design 5Frans Mul - fmul@nikhef.nl8 July 2008
6
center of gravity New marionette New marionette Center of gravity Compensation ring for a heavy gear box Gear box with the contra tungsten mass 6Frans Mul - fmul@nikhef.nl8 July 2008
7
New marionette New marionette Machining by: Willem 7Frans Mul - fmul@nikhef.nl8 July 2008 Start with 200 kg After machining 75 kg ACP 5080 AlMg4,5Mn0,7, Werkstoffzustand 3.3547
8
New marionette New marionette Wiring by: Vincenzo, Fabio, Francesco, Rodolphe 8Frans Mul - fmul@nikhef.nl8 July 2008
9
New mirror New mirror Installation by: Michele, Paola 8 July 2008Frans Mul - fmul@nikhef.nl9 From the container to the installation tool and vacuum clamp. The front and back side of the mirror is covered with a protection foil. Technical details Beautiful, no scratching !
10
New recoil mass New recoil mass Vertical balancing: by Paola Old recoil mass New recoil mass center of gravity 10Frans Mul - fmul@nikhef.nl8 July 2008
11
New gear box What is new ? The pitch between the wires The bearings, ceramic and linear The self-brake wire stretchers The end stops The tungsten contra mass The 55 mm for- and backward range old 11Frans Mul - fmul@nikhef.nl8 July 2008 Self-brake wire stretcher
12
New gear box New gear box Wiring by: Francesco, Fabio, Rodolphe 8 July 2008Frans Mul - fmul@nikhef.nl12
13
New installation tool Gear box R.M. X-Y-Z Translation units Mirror X-Y-Z Roll, yaw, pitch Translation units Frame Mirror vacuum clamp unit 13Frans Mul - fmul@nikhef.nl8 July 2008
14
14Frans Mul - fmul@nikhef.nl8 July 2008 mass = mass New installation tool Installation tool by: Nikhef Tungsten contra mass Mirror and reaction mass
15
New installation tool New installation tool Wiring by: Paola Mirror vacuum clamp 15Frans Mul - fmul@nikhef.nl8 July 2008 Steel wires 0.2 mm 8 mm
16
8 July 2008Frans Mul - fmul@nikhef.nl16 New installation tool New installation tool Wiring by: Paola, Michele Peeling the protection foil With out the compensation ring detail
17
Balancing Balancing Horizontal at NIKHEF 10 April 2008 by: Paola, Thomas, Maurizio For the vertical balancing we use a water level 0.05 mm / m Balancing incl. gear box, 2 trim mass, top mass end 2 solid aluminum mass. During this procedure the safety belts where taken off! 17Frans Mul - fmul@nikhef.nl8 July 2008
18
Balancing Balancing Vertical at NIKHEF 10 April 2008 by: Paola, Thomas, Maurizio For the vertical balancing we use a theodolite. Balancing incl. gear box, 2 trim mass, top mass end 2 solid aluminum mass. 18Frans Mul - fmul@nikhef.nl8 July 2008
19
Electrical test Electrical test Trim mass test in the marionette by: Vincenzo, Fabio Tungsten Trim mass Open contact Each switch has been tested for 30 times in open and closed position 30x End switch with kapton isolation 19Frans Mul - fmul@nikhef.nl8 July 2008 Small modifications by Paul
20
30x Electrical test Electrical test Gear box test by: Vincenzo, Fabio 20Frans Mul - fmul@nikhef.nl8 July 2008 Each switch has been tested for 30 times in open and closed position.
21
Installation in the I.M.C. end tower Highway to building ………. 8 July 2008Frans Mul - fmul@nikhef.nl21 The road Road test Marionette on the road
22
Installation in the I.M.C. end tower Marionette by: Franco, Jo 8 July 2008Frans Mul - fmul@nikhef.nl22 Modification marionette lifting tool The marionette on his way The marionette on his wire
23
Installation in the I.M.C. end tower Marionette by: Franco, Piero 8 July 2008Frans Mul - fmul@nikhef.nl23
24
Installation in the I.M.C. end tower Marionette by: Franco, Piero 8 July 2008Frans Mul - fmul@nikhef.nl24
25
Installation in the I.M.C. end tower Installation in the I.M.C. end tower Mirror and RM by: Piero, Franco, Michele 8 July 2008Frans Mul - fmul@nikhef.nl25 After the mirror installation the safety structure is mounted.
26
Installation in the I.M.C. end tower Installation in the I.M.C. end tower Mirror and RM by: Piero, Franco 8 July 2008Frans Mul - fmul@nikhef.nl26 Each switch has been tested in open and closed position. The mirror and RM is moved 55 mm for- and backwards.
27
Installation in the I.M.C. end tower Installation in the I.M.C. end tower Mirror and RM by: Piero, Franco 8 July 2008Frans Mul - fmul@nikhef.nl27 It looks like the design !
28
Installation in the I.M.C. end tower Installation in the I.M.C. end tower mirror end reaction mass 8 July 2008Frans Mul - fmul@nikhef.nl28 Tuesday 01 July 2008 The MC tower bottom part has been finally closed and at about 12:15 AM (local time) the pumping system started the tower evacuation. The protection film of the MC mirror has been successfully removed. https://pub3.ego-gw.it/logbook/index.php?area=logbook&target=0&counter=1
29
Numbers Marionette mass inclusive: Top mass, 2 trim mass 2 moveable trim mass Mounting parts Sub. Total mass: 99.93kg Exclusive wires, mounting strips en bolds for the wires. Gearbox mass: 4.75kg Contra mass: 13.67kg Exclusive wires. Sub. Total mass: 18.42kg Mirror mass: 1.61kg Inclusive magnets. Reaction mass inclusive: Coils Coil holders Front ring Mounting parts (bolds) Sub. Total mass: 14.16kg Total mass < 134.12 kg 29Frans Mul - fmul@nikhef.nl8 July 2008 Mirror 140 mm thickness 45 mm. The mirror and RM range for- and backward is 55 mm. Wires for the mirror and RM are 0.2 mm steel. Marionette material: ACP 5080 AlMg4,5Mn0,7, Werkstoffzustand 3.3547
30
Future improvements 8 July 2008Frans Mul - fmul@nikhef.nl30 Modify transport lorry. Modify entrances off the buildings. Shock sensors during transport. Fixation tool for stabilize recoil mass and mirror in the tower on the safety structure. All the drawings will be prepared in Amsterdam and send to Cascina.
31
Installation of the new end mirror 31Frans Mul - fmul@nikhef.nl8 July 2008 E N D