Download presentation
Presentation is loading. Please wait.
Published byAraceli Merton Modified over 9 years ago
1
Preparation run Tezzaron-Chartered 06.01.2009 A.Rozanov 1 Introduction Restarts test on PS en Avril 2009 Mesure PS SEU chip SEU-IBM-2008 40 Mhz avec FPGA Mesure PS SEU chip SEU-IBM-2009 ???? Mesure PS SEU FE-I4-Proto Mesure analogique FE-I4-Proto au CERN janvier-avril(comparaison avec LBNL) Mesure analogique FE-C4-Proto au CPPM Mesures PS analogue FE-C4-Proto apres irradiations Mesures PS SEU FE-C4-Proto
2
Preparation run Tezzaron-Chartered 06.01.2009 A.Rozanov 2 Details Test set-up de Bonn – must Test set-up de LBNL – optionel
3
Preparation run Tezzaron-Chartered 06.01.2009 A.Rozanov 3 Details Test set-up de Bonn – must Test set-up de LBNL – optionel
4
Preparation run Tezzaron-Chartered 06.01.2009 A.Rozanov 4 Details Test set-up de Bonn – must Test set-up de LBNL – optionel
5
Preparation run Tezzaron-Chartered 06.01.2009 A.Rozanov 5 Details Test set-up de Bonn – must Test set-up de LBNL – optionel
6
Preparation run Tezzaron-Chartered 06.01.2009 A.Rozanov 6 Details Test set-up de Bonn – must Test set-up de LBNL – optionel
7
Preparation run Tezzaron-Chartered 06.01.2009 A.Rozanov 7 Details Test set-up de Bonn – must Test set-up de LBNL – optionel
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.