HATCH UNIT 1 CONDENSER HOTWELL DAMAGE & LONG CYCLE CLEANUP VALVE LEAKAGE FORCED OUTAGES JAN 2013 & OCT 2013
2
1A MAIN CONDENSER HOTWELL 2012 REFUELING OUTAGE
3
Divider wall section broken 1A MAIN CONDENSER HOTWELL 2012 REFUELING OUTAGE
5
False bottom cracks on Southeast corner tube sheet supports (8) 1A MAIN CONDENSER HOTWELL 2012 REFUELING OUTAGE
6
Divider wall separated from hotwell floor False Bottom topside 1A MAIN CONDENSER HOTWELL 2012 REFUELING OUTAGE
7
Cyclic fatigue due to large variations in circwater temperatures Condenser design deficiencies Corrective actions: Repair to previous condition System Engineer to identify condenser design deficiencies and initiate design changes INITIAL CAUSE DETERMINATION
8
Banging sounds identified from 1A Hotwell Same general area as previous damaged area ODMI created, evaluated to most likely be an FME issue (Grating) Sounds only heard when operating at or near 100% power JUNE 2012
9
Unit 1 Forced shutdown due to high conductivity Condenser tube rupture, circwater entered the hotwell 24 hours before planned Unit 2 refueling outage FEBRUARY 2013
10
1A HOTWELL DAMAGE
11
1A HOTWELL DAMAGE FEBRUARY 2013
12
FALSE BOTTOM DAMAGE
13
TUBE RUPTURE
14
No PMs on hotwell level transmitters “A” transmitter crosstied to 1B hotwell Level recorder displayed 1B hotwell level twice 1A hotwell level maintained too high Long cycle cleanup valve leakby CAUSE DETERMINATION
15
1A Hotwell 72”+ 1B Hotwell ~40” HOTWELL LEVEL
16
1N21F165 valve Open during startup only Short cycles condensate/feedwater from the condenser hotwell, through the condensate demins, through all FWHs, then back to the condenser hotwell Also used during low power operations for RWL control LONG CYCLE CLEANUP
17
1N21F165 14” CCI DRAG VALVE
18
LONG CYCLE CLEANUP FLOWPATH
19
Feedwater (~350 degrees, 1000 psi) short cycled back to hotwell Drains below hotwell false bottom (under water) Result: Flashing of feedwater within hotwell Water hammer inside hotwell 1N21F165 LEAK BY EFFECTS
20
“A” level transmitter valved back to 1A hotwell Transmitters recalibrated 1A hotwell level lowered Stopple valve plug considered, but rejected ~75 REM dose projection August & September, patches placed on valve body due to external leakage MARCH – OCTOBER 2013
21
External leakage exceeded the capacity of the conbay floor drain sumps Shutdown required as flooding neared the 3” setpoint to trip circwater pumps VALVE BODY BLOWOUT
22
~1” THOUGH BODY HOLE 2” VALVE BODY
23
REPAIRS 7” X 7” X 2” PLATE
24
Inadequate valve design No PMs (installed mid 1990’s) Leaking upstream valves Inadequate thermal performance monitoring No temperature indication downstream of 1N21F165 CAUSES
25
Since 2007, both Unit 1 RFPT RPMs were noted to have increased by about 150 RPMs Indications of feedwater being short cycled to the hotwell. RPMS increased to maintain RWL Thermal performance trends of upstream 1N21F027A/B valves were not fully understood, and were not acted upon Indicated leakby from those valves PMs on 1N21F027A/B moved out of 2012 refueling outage with little technical justification Inadequate ACD from 2012 condenser damage Incorrect assessment of June 2012 banging noises in ODMI No action taken from increasing offgas flowrates, as recommended in the ODMI Possibility of external valve leakage not identified, despite similar occurrences in similar applications MISSED OPPORTUNITIES
26
Need PMs on all high energy source drains to condensers FWH high level dump valves Feed Pump min flow valves Long cycle Cleanup valves Thermal Performance monitoring Permanent thermocouples Heat gun UT thickness measurements for suspect valves Hotwell level False bottom impacts PMs for Level Controls LESSONS LEARNED
27
QUESTIONS?