Presentation is loading. Please wait.

Presentation is loading. Please wait.

Barents 2020 Final Report RN01 “Co-ordination of Deliverables” Moscow 14 December 2011 Presented by Vladimir Vernikovskij, Russian Coordinator of RN01.

Similar presentations


Presentation on theme: "Barents 2020 Final Report RN01 “Co-ordination of Deliverables” Moscow 14 December 2011 Presented by Vladimir Vernikovskij, Russian Coordinator of RN01."— Presentation transcript:

1 Barents 2020 Final Report RN01 “Co-ordination of Deliverables” Moscow 14 December 2011 Presented by Vladimir Vernikovskij, Russian Coordinator of RN01 DRAFT 2011-12-11

2 2 RN01 Participants Co-ordinators

3 RN01 - Mandate for Phase IV 1.Recommend how deliverables should be structured and published 2.Review deliverables for compliance with the recommendations, –prepare roadmaps for implementation of deliverables 3.Create awareness among the potential recipients as to what is coming –(e.g. standards organisations) 4.Provide proposal for an Arctic long term international standards program –(ref. ISO/TC67 MC Ad-hoc group Arctic Operations)

4 Task 1: Recommendation of deliverables Report developed and delivered to Steering Committee 7th Dec. 2010 Recommendations presented at B2020 Conference 9th Dec. 2010

5 Task 2 Review of deliverables and recommendation for implementation

6 RN02 - Ice Loads Guidance Document ISO Editing Panel for 19906 Input to update of 19906 ISO TC67/SC8Future NWIP National St.org. Russia/Norway Regional amendment to ISO 19906 (unitl new edition issued) Recipient Deliverable Application

7 RN02 - Commentary

8 RN03 – Risk Management Seminar Proceedings Barents 2020 Report DeliverableRecipient

9 RN03 - Commentary

10 RN04 – Evacuation & Rescue Commentary on EER provisions of ISO19906 ch.18 ISO Editing Panel for 19906 Input to update of 19906 ISO TC67/SC8 Future possible NWIP Guide for Arctic Evacuation ISO TC67/SC8 Future possible NWIP Guide for Emergency Reponse Vessels ISO TC67/SC8 Future possible NWIP Recipient Deliverable Application

11 RN04 - Commentary

12 RN05 – Human Factors Report ISO Editing Panel for 19906 Input to Update of 19906 ISO TC67/SC8 Future NWIP DNV Class Rules Class Notation «Winterised» Recipient Deliverable Application

13 RN05 - Commentary

14 RN06 – Ice Management State of the Art Report ISO TC67/SC8 Future NWIP Recipient Deliverable Application

15 RN06 - Commentary

16 RN07 – Operational Emissions & Discharges Reginal Guidance Report Russian National Std. Body Gost or SanPin std. ISO TC67/SC8Future NWIPOGP Arctic environmental Guideline Recipient Deliverable Application

17 RN07 - Commentary

18 18 Task 3: Creating Awareness Initiatives RN01 participation and presentations: Plenary meeting of ISO TC67/SC7 –Singapore, Jan. 2011 ISO/TC67/Management Committee meeting –San Francisco, June 2011 –where the formation of ISO/TC67 MC AHG “Arctic Operations” were discussed Norwegian Sector Board for Petroleum Standardisation OGP Standards committee meetings OGP Arctic Co-ordination TF meetings Article in OGP Standards bulletin 2011 18

19 Task 4 – Proposal for Arctic Long Term Standardisation B2020 RN01 Recomm. Report to ISO (June) ISO Ad-hoc Group Arctic Operation (June-Sep.) ISO TC67 Plenary Meeting Moscow (Sep) New ISO TC67 Sub-Comm. 8 «Arctic Operation» formed 1234

20 RN01 Recommendations to ISO: 11 New Work Item Proposals 20 Working groupDeliverables 2012201320142015201620172018 RN01: Recommendation for structuring, editing and publishing of phase IV deliverables PNGI – Arctic operations – Ice loads in structural design PNGI – Arctic Operations – Topside facilities, add. tech. requirements PNGI – Arctic operations – Working environment PNGI – Arctic operations – Escape, evacuation and rescue PNGI – Arctic operations – Onshore logistics PNGI – Arctic operations – Offshore logistics PNGI – Arctic operations – Staff management PNGI – Arctic operations – Maintenance of structures PNGI – Arctic operations – Offshore structures corrosion protection PNGI – Arctic operations – Plant security PNGI – Arctic operations – Ice management 1

21 ISO AHG The ISO/TC67 MC Ad-hoc group on Arctic Operations used the Barents 2020 RN01 report as a basis for their recommendations Recommended to the ISO/TC67 plenary meeting in Moscow, 14-15 th September 2011: –to set up a new subcommittee for Arctic Operations –to invite Russia to propose a chairman and secretary. Re. ISO/TC67 N 1148 Report ISO TC67 MC AHG Arctic operations, dated: 2011-09-07.. 2

22 3 – IOS plenary meeting The plenary meeting of ISO/TC67 took a resolution in its meeting 2011-09-15 to establish SC8 “Arctic Operations”. The SC8 work programme will be developed on the basis of the abovementioned work items. The formal establishment of SC8 has been approved by ISO Technical Management Board Preparations for the first meeting can start. Detailed new work item proposals are being prepared. 3

23 ISO TC67 SC8 SC 8 work programme to start with about 15 work items, which should include the following subjects and/or standards: –Working environment in connection with cold-climate conditions (1 standard ready in late 2014); –Escape, evacuation and rescue (1 standard ready in early 2014)); –Maintenance of onshore and offshore structures (2 standards ready in late 2014); –Ice management (6 standards ready in 2015); –Onshore and offshore logistics (2 standards ready in late 2014); –Plant security (1 standard ready in early 2014). The detailed new work item proposals are being prepared. 4

24 Thank you for your attention !

25 25 Options for final reporting 1.Barents 2020 technical report 2.Proposal for Guideline(s) or Recommended Practice(s) –GAZPROM (STO) –DNV (RP) –OGP 3.Proposal for identical Russian and Norwegian national supplementary standard to an ISO standard –GOST R Standard, Recommendation or “set of rules” –NS or NORSOK standard 4.Proposal for national annex to adopted ISO or EN-ISO standard 5.Proposal for ISO Technical Specification (TS) 6.Proposal for ISO Technical Report (TR) 7.Proposal for ISO Publicly Available Specification (PAS) 8.Proposal for ISO International Workshop Agreement (IWA) 9.Proposal for ISO Amendment to existing standard (Amd)


Download ppt "Barents 2020 Final Report RN01 “Co-ordination of Deliverables” Moscow 14 December 2011 Presented by Vladimir Vernikovskij, Russian Coordinator of RN01."

Similar presentations


Ads by Google