Presentation is loading. Please wait.

Presentation is loading. Please wait.

Introduction to ECC PT1 November 2012. An introduction to ECC PT1 2 Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings)

Similar presentations


Presentation on theme: "Introduction to ECC PT1 November 2012. An introduction to ECC PT1 2 Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings)"— Presentation transcript:

1 Introduction to ECC PT1 November 2012

2 An introduction to ECC PT1 2 Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC Decisions and developed responses to the first EC Mandates on UMTS ECC PT1 developed major UMTS/IMT-2000 ECC deliverables implemented by most CEPT countries ERC PT1 held its 1 st meeting in Mainz, Germany ECC PT1 has held over 40 meetings and continue addressing IMT and MFCN matters 2000 2012 ECC PT1 has been an active contributor to ITU-R TG 8/1, WP8F, WP5D and JTG 5-6 on IMT

3 An introduction to ECC PT1 3 ECC PT1 Chairmen Mr. Pasi Toivonen FICORA ERC TG1: August 1997 – October 2000 Mr. Didier Chauveau ANFR ECC PT1: October 2009 – present time Mr. Peter Scheele BNetzA ECC PT1: October 2003 – October 2009 Mr. Jim Connolly ComReg ERC/ECC PT1: October 2000 – October 2003 1997 2000 2010

4 An introduction to ECC PT1 4 GSM, DECT IMT-2000/UMTS, MFCN Contributions – Deliverables ECC PT1 CEPT administrations Industry International organizations In average meeting: 78 participants with ~60 % representing industry 50 input documents 20+ ECC deliverables 10+ CEPT Reports

5 An introduction to ECC PT1 5 Participants

6 6 Documents

7 7 CEPT Members

8 An introduction to ECC PT1 8 ECC PT1 Terms of Reference ECC PT1 Terms of Reference The Project Team shall be responsible for implementing the WAPECS concept as appropriate in the context of MFCN and in frequency bands identified by ECC, including collaborating with WG FM on frequency management issues (e.g. cross-border coordination issues, sharing of bands with applications other than MFCN). ______________________________________________________________ 1 In recent ECC Decisions, spectrum has been designated to MFCN (mobile/fixed communications networks) which includes IMT and other communications networks in the mobile and fixed services" which would include fixed wireless access but not point-to- point links. 1 See full ECC PT1 Terms of Reference on the ECC PT1 webpageECC PT1 webpage

9 An introduction to ECC PT1 9 ECC PT1 Officials Chairman Mr. Didier Chauveau, ANFR, DPSAI Tel: +33 1 45 187704 E-mail: chauveau@anfr.fr Vice-chairman Mr. Jaime Afonso ANACOM, DGE Tel: +351 21 721 2240 E-mail: jaime.afonso@anacom.pt Secretary Mr. Patrick Donohue, ANFR Tel: +33 1 45 187372 E-mail: donohue@anfr.fr Vice-chairman Mr. Pasi Toivonen FICORA Tel: +358 9 6966 853 E-mail: pasi.toivonen@ficora.fi

10 An introduction to ECC PT1 10 Place of ECC PT1 within ECC Place of ECC PT1 within ECC ECC WG FM Frequency Management WG SE Spectrum Engeneering WG NNA Numbering, Naming Addressing CPG Conference Preparatory Group ECO ECC PT1 IMT Matters Steering Group 3GPP WiMAX Forum GSM A Industry UMTS Forum ETSI SRDoc FM50, FM51, FM52, EFIS/MG SE7, SE40, STG

11 An introduction to ECC PT1 11 ECC PT1 co-operation with external entities ECC PT1 co-operation with external entities ECC PT1 ECC European Commission APT Wireless Group (AWG) CITEL

12 An introduction to ECC PT1 12 ECC PT1 input to the CEPT preparation for WRCs ECC PT1 has contributed to the preparation of the European Common Proposals (ECPs) for the World Radiocommunication Conferences (WRCs) on the following Agenda Items: WRC-2000: 1.6.1 1.6.2 WRC-2003: 1.22 1.33 1.34 WRC-2007: 1.4 1.9 review of spectrum and regulatory issues for advanced mobile applications in the context of IMT ‑ 2000, noting that there is an urgent need to provide more spectrum for the terrestrial component of such applications, and priority should be given to terrestrial mobile spectrum needs, and adjustments to the Table of Frequency Allocations as necessary identification of a global radio control channel to facilitate multimode terminal operation and worldwide roaming of IMT ‑ 2000 to consider progress of ITU ‑ R studies concerning future development of IMT ‑ 2000 and systems beyond IMT ‑ 2000, in accordance with Resolution 228 (WRC ‑ 2000) to review the results of studies in response to Resolution 539 (WRC ‑ 2000) concerning threshold values for non ‑ GSO BSS (sound) in the band 2 630 ‑ 2 655 MHz, and to take actions as required to review and revise technical, operational and regulatory provisions, including provisional limits in relation to the operation of high altitude platform stations within IMT ‑ 2000 in the bands referred to in No. 5.388, in response to Resolution 221 (WRC ‑ 2000) to consider frequency-related matters for the future development of IMT ‑ 2000 and systems beyond IMT ‑ 2000 taking into account the results of ITU ‑ R studies in accordance with Resolution 228 (Rev.WRC ‑ 03) to review the technical, operational and regulatory provisions applicable to the use of the band 2 500-2 690 MHz by space services in order to facilitate sharing with current and future terrestrial services without placing undue constraint on the services to which the band is allocated

13 An introduction to ECC PT1 13 ECC PT1 is the CEPT entity contributing to ITU-R WP5D Since the establishment of the ITU-R WP5D “ IMT Systems ” (successor of ITU-R WP8F) in January 2008, ECC PT1 has been contributing to its work by presenting the CEPT positions on the issues on the agenda of WP5D, including : Development and update of ITU-R Recommendations and Reports on IMT Digital Dividend (790-862 MHz for Region 1) IMT-Advanced submission and evaluation process Cognitive Radio Systems (CRS) Femtocells (home base stations )

14 An introduction to ECC PT1 14 ECC PT1 inputs on behalf of CEPT to ITU-R WP8F and WP5D ECC PT1 inputs on behalf of CEPT to ITU-R WP8F and WP5D

15 An introduction to ECC PT1 15 How is ECC PT1 organised? Sub Working Groups (SWGs) are active during the ECC PT1 plenary meetings Correspondence Groups (CGs) are active between ECC PT1 plenary meetings Opening plenary Closing plenary Sub working group A Sub working group C Plenary meeting n Plenary meeting n+1 Correspondence group X Correspondence group Y Correspondence group Z The number of CGs may vary

16 An introduction to ECC PT1 16 Presentation of ECC PT1 SWGs SWG-A – “ Spectrum Issues ” Chairman: Mr. Michael Kraemer (E-Plus Mobilfunk GmbH) michael.kraemer @ eplus-gruppe.de SWG-C – “ Compatibility and Sharing Issues ” Chairman: Mr. Robert Cooper (Deutsche Telekom) robert.cooper @ telekom.com

17 An introduction to ECC PT1 17 ECC PT1 current Work Programme ECC PT1 is currently focusing, among others, on the following issues: Studies in the 3.4-3.6 GHz (further to the approval of ECC/DEC/(11)06): o CEPT Report in response to the EC Mandate (development of new BEM for greater channel bandwidths and band plans) o ECC Report on the co-existence between adjacent TDD networks Brining the ECC regulatory framework for the 900/1800 MHz bands in line with the current EU one by adding LTE and WiMAX to the permitted technologies (ECC/DEC/(06)13) Mobile Communications onboard Aircraft (MCA) – CEPT Report in response to the second EC Mandate Mobile Communications onboard Vessels (MCV) – Sharing studies and revision of ECC/DEC/(08)08 accordingly Generic ECC Recommendation on cross border co-ordination covering all relevant ‘mobile bands’ and technologies

18 An introduction to ECC PT1 18 ECC PT1 webpage The most recent information: http://www.cept.org/ecc/groups/ecc/ecc-pt1

19 An introduction to ECC PT1 19 For further information on ECC PT1 please refer to the ECC PT1 contacts ECC PT1 contactsECC PT1 contacts


Download ppt "Introduction to ECC PT1 November 2012. An introduction to ECC PT1 2 Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings)"

Similar presentations


Ads by Google