Presentation is loading. Please wait.

Presentation is loading. Please wait.

9 November 2006VELOEddy Jans 0 ACDC3 VELO-testbeam Nov ‘06 November 9, 2006 preparation for transport transport Assembly Lab -> H8 testbeam (Prevessin)

Similar presentations


Presentation on theme: "9 November 2006VELOEddy Jans 0 ACDC3 VELO-testbeam Nov ‘06 November 9, 2006 preparation for transport transport Assembly Lab -> H8 testbeam (Prevessin)"— Presentation transcript:

1 9 November 2006VELOEddy Jans 0 ACDC3 VELO-testbeam Nov ‘06 November 9, 2006 preparation for transport transport Assembly Lab -> H8 testbeam (Prevessin) testbeam setup targets for vertex reconstruction first results

2 9 November 2006VELOEddy Jans 1

3 9 November 2006VELOEddy Jans 2 special VELO-module with accelerometer featuring on-line readout (http://www.pcb.com/spec_sheet.asp?model=340A65&item_id=257)

4 9 November 2006VELOEddy Jans 3 lifting of right half out of the assembly lab on-line monitoring in cabin of truck

5 9 November 2006VELOEddy Jans 4 TELL1-crate before connecting of the signal cables

6 9 November 2006VELOEddy Jans 5 ………………. and after connecting

7 9 November 2006VELOEddy Jans 6 Right half in the H8-testbeam area

8 9 November 2006VELOEddy Jans 7

9 9 November 2006VELOEddy Jans 8 Mounting of the rings with targets (Ø center =2 mm, Ø off-enter =10 mm) in the cylinder.

10 9 November 2006VELOEddy Jans 9 Cylinders with l=30 and L=100 mm mounted in right half.

11 9 November 2006VELOEddy Jans 10 First x-y hitmap of large beamspot on 6 sensors

12 9 November 2006VELOEddy Jans 11 Celebration of successful detection of first events


Download ppt "9 November 2006VELOEddy Jans 0 ACDC3 VELO-testbeam Nov ‘06 November 9, 2006 preparation for transport transport Assembly Lab -> H8 testbeam (Prevessin)"

Similar presentations


Ads by Google