Presentation is loading. Please wait.

Presentation is loading. Please wait.

LIU-SPS Beam Loss, Protection, Transfer Lines WG

Similar presentations


Presentation on theme: "LIU-SPS Beam Loss, Protection, Transfer Lines WG"— Presentation transcript:

1 LIU-SPS Beam Loss, Protection, Transfer Lines WG
M. Meddahi for the WG members Jan Borburgh, Paolo Chiggiato, Karel Cornelis, Brennan Goddard, Lars Jensen, Lars Jensen, Gilles Le Godec, Roberto Losito, Jan Uythoven, Giovanna Vandoni, Jorg Wenninger, Oliver Aberle, Frederic Galleazzi, Helmut Vincke, Ramon Folch, Antoine Kosmicki, Verena Kain, Francesco Cerutti, Chiara Bracco, Jeremie Bauche, Alessio Mereghetti, Cesare Maglioni, Matthew Alexander Fraser, Genevieve Eleanor Steele, Lene Drosdal, Jose Abelleira, Fausto Lorenzo Maciariello, Francesco Maria Velotti, Florian Pasdeloup, Antonio Perillo Marcone, Jan Hrivnak, Anton Lechner

2 2014 achievements 2014 main achievements
Protection devices for high brightness beams - need to attenuate % more than present design ! Solution found for the TI 2, TI 8 TCDIs – optics (with magnets/power converters), integration, materials, operation/machine protection - Engineering specs being finalised HiRadMat tests being prepared – very important SPS orbit correction –See Giovanni SPS orbit stability Shot-by-shot trajectory variation: Continuous improvements of the MSE current stability – MSE4 and 6 now identical performance (Gilles’ team) Bunch-by-bunch variation: MKE waveform improved (MKE4 con’t) Feasibility studies for the LIU-SPS external beam dump LSS6, LSS4, LSS5 examined – LSS5 concept developed -Bren/Francesco- and retained

3 LSS5 external beam dump ECX5 ECA5 CONNECTION TUNNEL JUNCTION CAVERN
CORE SPS TS55 DUMP TUNNEL DUMP CAVERN

4 2015 challenges 2015 Conclusions
Review and finalise all functional specs for all protection devices and dumps Launch design studies and procurements Perform HiRadMat tests Continue orbit/stability studies (MDs) – understand source/test patches Take a decision on performing the External beam dump – needs some remaining CE information Conclusions Thanks to Verena and team for all efforts done and brilliant results. Verena will chair this working group as of Jan/ 2015 – mandate and objectives will be reviewed, in phase with the phase of the project


Download ppt "LIU-SPS Beam Loss, Protection, Transfer Lines WG"

Similar presentations


Ads by Google