Presentation is loading. Please wait.

Presentation is loading. Please wait.

PIPED SUPPLY OF BIO-GAS TO RURAL HOUSE HOLDS THROUGH COMMUNITY BIO-GAS UNIT AT VILLAGE: MISHRAWALLIA BLOCK: BERUARBARI DISTT: BALLIA,U.P. SPONSORED BY.

Similar presentations


Presentation on theme: "PIPED SUPPLY OF BIO-GAS TO RURAL HOUSE HOLDS THROUGH COMMUNITY BIO-GAS UNIT AT VILLAGE: MISHRAWALLIA BLOCK: BERUARBARI DISTT: BALLIA,U.P. SPONSORED BY."— Presentation transcript:

1 PIPED SUPPLY OF BIO-GAS TO RURAL HOUSE HOLDS THROUGH COMMUNITY BIO-GAS UNIT AT VILLAGE: MISHRAWALLIA BLOCK: BERUARBARI DISTT: BALLIA,U.P. SPONSORED BY UNICEF,NEW DELHI NODAL AGENCY BIO-ENERGY MISSION DEPT. OF PLANNING, GOVT OF U.P. ( FEB. 2010)

2 SALIENT FEATURES It is a modular unit. Optimal community size plant: 100 m 3 capacity. Average Bio-gas production after 4-5 hours duration : 80-100 m3 Suitable for 40-50 families. All type of agro waste can be consumed. Presently we are using cow dunk (20%) and other agro-horticulture/other degradable waste what so ever available in the village except mud.

3 Weekly feeding :1875 kg agro waste. Bio-gas production is almost similar in every season. Moisture, H 2 S &Co 2 (major part) are scrubbed. Easier maintenance While burning, the pressure is standard & equal at each user point. Minimum chances of leakage. Use-ful life of project is approximate 20 year.

4 It helps environment &help also in the cleanliness of village. Bio-gas in the Cylindersis stored at 300 psi pressure. It may be used for domestic power generation. Farmers/ users are transporting bio-gas through bio-gas balloon for their domestic/ agricultural uses.

5 LOCATION DETAILS OF UNITS Unit :1&2 :- Village: Mishrawallia Site at: Block : Mishrawallia Distt : Ballia State : U.P. No.of beneficiaries : 78 (If pipeline assistance is provided in addition it may be extended to 100) Type : Piped supply Major beneficiaries are from B.P.L. families

6 Secretary to Hon. Chief Minister, Govt. of U.P. and D.M., Ballia Visiting The Ballia Bio-gas Unit. Chief Mason is explaining the technical facts of the project. U.P.GOVT. OFFICIAL‘S VISIT TO BALLIA BIO-GAS UNIT

7 A comprehensive view of Community Biogas unit at Ballia in Uttar Pradesh

8 Kalawati explaining the benefits of the bio-gas in her hut

9 UNIT 3 : Site at : Village : Mullahikhera Block : Sarojini Nagar Distt. : Lucknow State : U.P. No. of beneficiaries : 45 ( These facilities may be extended to about 15- 20 more beneficiaries) Type : Bio-Gas balloon supply Major beneficiaries are from B.P.L. families.

10 A comprehensive view of community bio-gas plant at Mullahikhera in Lucknow

11 Principal Secretary, Dept. of Non-conventional energy, Govt. of U.P. (in red T shirt ) visiting the Mullahikhera, Lucknow community bio-gas plant U.P. GOVT. OFFICICIALS AT MULLAHIKHERA,LUCKNOW

12 TOTAL COST OF THE PROJECT Total cost of the 3 units : Rs.21,95,948.00 Contribution from UNICEF: Rs.18,81,360.00 Community contribution : Rs. 3,14,138.00 Total no. of beneficieries : Rs. 123 Per family total investment: Rs.17,853 Note: The bio-gas facility may be extended to 25-30 more families.

13 INITIATIVE OF U.P. GOVT. Replicating this Model into 200 different Villages/locations in the State. Bankable Model has been established. U.P. Govt.’s contribution ( Proposed) : 25% of the project cost or maximum upto Rs. 5.00 lakh Recasting of100 cubic meter plant including all accessories for 50 families has been established it is be between Rs. 8.15-10.00 lakh. depends on region to region

14 AVAILABILITY OF AGRO-WASTE IN INDIA AND ITS IMPACT ON FUEL Annual availability : 500-600 million tons Potential of establishing bio-gas plants; (A) Individual : 1-4 m3 capacity: 30 million (B) Community Plant : 100 m3 : 0.68 million Equivalent energy : 6.341 Million Tons Kerosine. Value at present prices : Rs. 12682 Million

15 BIO-ENERGY MISSION’S VISION-2015 Our rural masses in U.P. shall be completely self-reliant in their energy needs for cooking and lighting. Our total sanitation schemes shall be majorly self propelled. Major farming activities would be based on organic inputs. Convergence with MNAREGA and other developmental schemes.

16 THANK YOU WITH REGARDS JAI-HIND


Download ppt "PIPED SUPPLY OF BIO-GAS TO RURAL HOUSE HOLDS THROUGH COMMUNITY BIO-GAS UNIT AT VILLAGE: MISHRAWALLIA BLOCK: BERUARBARI DISTT: BALLIA,U.P. SPONSORED BY."

Similar presentations


Ads by Google