Download presentation
Presentation is loading. Please wait.
Published byNikolas Shinn Modified over 9 years ago
1
National Aluminium Company Limited Integrated operations : Bauxite – Alumina – Aluminium – Power Share Holders & Financial Advisors May 2010
2
Spectrum of Operations Bauxite Mine Panchpatimali Alumina Refinery Damanjodi
3
Spectrum of Operations 1080 MW -CAPACITY- BEING EXPANDED TO 1200 MW.(TARGET-JULY’10) HIGH PLANT LOAD FACTOR. ADVANCED ELECTROSTATIC PRECIPITATOR (99.9% EFFICIENCY) TO CONTROL POLLUTION. ZERO DISCHARGE OF EFFLUENTS. Aluminium Smelter Angul Thermal Power Plant Angul Port facility Vizag
4
Highlights: FY10 & Previous Five years Sales Net Profit EPS Figures in Rs. Crores 1 Crore=10 Million Figures for 2010 are unaudited LME
5
2 ND PHASE EXPANSION UNITPRESENT CAPACITY AFTER EXPANSION STATUS BAUXITE MINES MTPA4.86.3JAN’11 ALUMINA REFINERY MTPA1.5752.1JAN’11 ALUMINIUM SMELTER MTPA0.3450.46COMPLETED MARCH’10 CAPTIVE POWER MW120 x 8120 x 10120 MW- COMPLETED- AUG’09 120 MW-JULY’10
6
PRODUCTION – NEXT FOUR YEARS
7
FINANCIAL PERFORMANCE – NEXT FOUR YEARS Exchange: 1 USD = Rs. 46 GROSS SALES SALESLME PAT
8
COST OF PRODUCTION 2010-11 (Projected) COSTBAUXITEALUMINAPOWERMETAL Operating39711,5361.7689,515 Depreciation251040.154,749 Interest (notional) 331460.279,208 Total45511,7862.18103,472 in Rs.
9
GROWTH INITIATIVES
10
OPTIONS FOR GROWTH BROWNFIELD EXPANSION GREENFIELD GROWTH- INDIA & ABROAD DIVERSIFICATION UP & DOWNSTREAM INTEGRATION
11
BROWNFIELD EXPANSION REFINERY SMELTER
12
EXPANSION OF REFINERY 5 TH STREAM OF 7 LAKH MT IN REFINERY FROM YEAR 2014 (TOTAL CAPACITY – 30 LAKH MT) INVESTMENT – Rs 1800 CRORE SPL GRADE ALUMINA PLANNNED
13
BAUXITE NEED OF REFINERY YEARSREFINERY CAPACITY ANNUAL BAUXITE CONSUMPTION TOTAL BAUXITE CONSUMPTION FY11-FY142.36.827.2 FY15-FY40 (ADDITION OF 5 TH STREAM) 3.08.9231.4 TOTAL 258.6 MILLION TONNE
14
BAUXITE RESERVE MINE2010 LEVELCUM PANCHPATMALI176.6 POTTANGI70.0246.6 MILLION TONNE REQUIREMENT TILL YEAR 2040 - 258.6
15
BAUXITE LEASES AVAILABLE MINESSTATUS LIFE UPTO PANCHPATMALIOPERATING2031 WITH POTTANGIOPERATION FROM 2014 2039
16
EXPANSION OF SMELTER & CPP UPGRADATION OF SMLETER TO 220 KA AT ANGUL –CAPACITY ADDITION: 92,000 TPY 1 x 120 MW UNIT IN CPP INVESTMENT: –Rs 900 CRORE (POT LINES AND CARBON PLANT) –Rs 600 CRORE (POWER)
17
SMELTER UP-GRADATION- ANGUL PLAN: –UP-GRADATION OF SMELTER AMPERAGE TO 220 KA –GAIN IN PRODUCTION: 92,000 TPY –UP-GRADATION TO BE COMPLETED BY 2016 STATUS: –RIO-TINTO ALCAN ENGAGED FOR PREPARATION OF FEASIBILITY STUDY ESTIMATED INVESTMENT: Rs. 1500 CRORES
18
GREENFIELD EXPANSION
19
BACKGROUND SURPLUS ALUMINA – 1.35 MTPA FROM 2012-13 SURPLUS ALUMINA + VALUE ADDITION NEEDS CAPTIVE POWER REFINERY or SMELTER- NEEDS BAUXITE / COAL
20
EXPANSION OPTIONS IN ALUMINIUM SECTOR
21
GROWTH OPTIONS-INDIA
22
OPTIONSPLANTSINVESTMENT ASMELTER - ORISSA/ CG POWER – 1250 MW SMELTER – 5 LTPA Rs 16,500 CRORE B“A” + AP MINES & REFINERY MINE – 42 LTPA REFINERY – 14 LTPA POWER – 1250 MW SMELTER - 5 LTPA Rs 22,500 CRORE INVESTMENT- INDIA
23
GREENFIELD SMELTER IN INDIA 0.5 MTPA SMELTER IN TWO PHASES OF 0.25 MTPA EACH 7000MU POWER NEEDED - 1250 MW CAPACITY CAPTIVE POWER PLANT NEEDS 7.5 MILLION TONNES COAL ESTIMATED INVESTMENT: Rs. 16,500 CRORES
24
GREENFIELD REFINERY IN INDIA 4.2 MTPA MINES AND 1.4 MTPA REFINERY IN AP RESERVES ALLOTTED IN KR KONDA & GUDEM IN AP PFR PREPARED SANCTION OF ML DETAILED EXPLORATION ACTIVITY OF RESERVES TO START. –AGENCY ENGAGED. INVESTMENT-Rs. 6000 CRORES.
25
GROWTH OPTIONS-ABROAD
26
GREENFIELD SMELTER-ABROAD INDONESIA 0.5 MTPA SMELTER AND 1250 MW POWER PLANT IN TWO PHASES ESTIMATED INVESTEMENT OF USD 3.9 BILLION MoU signed with Govt. of South Sumatra. Feasibility Report Prepared. Alternate location at East Kalimantan explored. Approval obtained from Indonesian Investment Coordinating Board Project office opened in Jakarta
27
INVESTMENT- ABROAD PLANTINVESTMENT POWER(COAL)– 1250 MW SMELTER – 0.5 MTPA USD 3.9 BILLION
28
DIVERSIFICATION
29
NUCLEAR POWER PLANT WIND POWER PROJECT DIVERSIFICATION
30
1400 MW NUCLEAR POWER PLANT -JV WITH NPCIL ESTIMATED INVESTEMENT Rs. 12,000 CRORES MoU signed with NPCIL One project identified JV agreement to be signed – June’10 NUCLEAR POWER PLANT-JV WITH NPCIL
31
50 MW WIND POWER PLANT AT SUITABLE LOCATION HAVING WIND POTENTIAL ESTIMATED INVESTEMENT Rs. 300 CRORES Feasibility Report prepared Tender floated Scheduled Commissioning – July’11 WIND POWER PROJECT
32
UP & DOWNSTREAM INTEGRATION
33
FLY ASH UTILIZATION ALUMINIUM WAGON PROJECT ALUMINIUM PARK SPECIALITY ALUMINA UP & DOWNSTREAM INTEGRATION
34
FLY ASH UTILIZATION: Selection of suitable partner for establishment of fly ash based Cement Grinding Unit at Angul in advance stage ALUMINIUM PARK –MoU signed with IDCO for establishment of Aluminium Park at Angul in JV for downstream and ancillary industries –JV Company to be registered soon UP & DOWNSTREAM INTEGRATION
35
ALUMINIUM WAGON PROJECT: Prototype aluminium wagon developed in collaboration with BEML. SPECIALITY ALUMINA : Selection of JV partner for 100,000 MTPA is in progress. UP & DOWNSTREAM INTEGRATION
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.