Download presentation
Published byAngelo Sheerer Modified over 9 years ago
1
ROT systems ROTARY INCINERATORS G. &G. IMPIANTI Sas of Ing
ROT systems ROTARY INCINERATORS G.&G. IMPIANTI Sas of Ing.Gallarati Carlo &C. For municipal waste big incineration plants (MW) Hospitals and medical waste plants (HW) Industrial special - hazard waste plants (IW) RDF, pellet, fluff exploitation plants fitted with automatic loading, ash unloading, stack gas cleaning system at CEE norms, turbogenerators for electric energy and heat recovery G&G IMPIANTI sas di Ing.Gallarati C.&C.
2
INCLINED FURNACES SERIES ROT
Main technical advantages Rotating furnaces reach a complete material grinding and thermal destruction, obtaining completely carbonized and roasted ash Ash is completely roasted and stabilized becoming fully inertized Ash is pre-melted and vetrified and is unloaded into a water channel (redler) where it is violently quenched and reduced into vitreous shivers, to be classified as inertized material and to pass the solute cession lab tests. The ROT furnaces can be loaded with different waste types also mixed together offering the greatest possible loading flexibility of the incineration plant and reaching the maximum possible quantity of electric energy producted and as well producing a notable always positive economic income, rendering the bank financement amortizable with high profitability. ROT furnaces offer a long operative life without heavy maintenance costs. ROT furnaces are easy to be conducted and with a limited number of operators G&G IMPIANTI sas di Ing.Gallarati C.&C.
3
OTHER NOT LESS IMPORTANT ADVANTAGES
The civil works necessary for the plant, at charge of the client, are limited to the minimum (it is necessary only a shedded building with a plain basement concrete slab) The soil surface necessary for the plant is substantially contained ROT furnaces are a long term experienced technology and offer a very effordable solution of the waste problem without encountering bad surprises. ROT furnaces offer full certainty of the economic return (pay-back) We can show many ROT furnace units working, with very low short yearly down periods, since a long term, with full evidence the emissions to remain always below the permitted limits by the local air pollution authorities (ARPA), with official analysis certifications executed by the State authority itself (stack gas AFS depuration plants by Ing.Gallarati) The efficiency in heat and electric energy recovery is comparable with that obtainable with other more complex and expensive plants, but with very low cost maintenance and short shut down period. G&G IMPIANTI sas di Ing.Gallarati C.&C.
4
ORGANIZATION CHART OF G.&G. IMPIANTI Sas di Ing.Gallarati Carlo & C.
G&G IMPIANTI sas di Ing.Gallarati C.&C.
5
ROT PLANTS INFORMATIVE MATERIAL
Informative material about ROT plants, in form of graphs and tables is attached and is freely downloadable from the following internet web-sites: For further information please contact: Information contact: G&G IMPIANTI Sas of ING.GALLARATI CARLO & C. Local workshop: via dei Marinoni 43 - CAP – city of CIGOGNOLA PV - ITALIA tel. & fax.: .: / G&G IMPIANTI sas di Ing.Gallarati C.&C.
6
G&G IMPIANTI sas di Ing.Gallarati C.&C.
7
G&G IMPIANTI sas di Ing.Gallarati C.&C.
8
G&G IMPIANTI sas di Ing.Gallarati C.&C.
9
FORNUCE ROT CC - COUNTER CURRENT
ROT furnace are realized in many sizes The incineration capacity ranges from 0.5 t/h to 20.5t/h (ROT150) The ROT17 furnace aside has a capacity of 1 t/h as HW with LCV=4500 Kcal/Kg G&G IMPIANTI sas di Ing.Gallarati C.&C.
10
ROT17 CC plant - city hospital of Lecce
ROT17 plant of the city hospital USSL1, hospital VITO FAZZI – Lecce (Italy) G&G IMPIANTI sas di Ing.Gallarati C.&C.
11
ROT17 EC CO-CURRENT - city of Puto (ex Jugoslavia – during mounting)
ROT 17 EC (co-current) is more adapted for very dry waste with high LCV (i.e. hospital waste) (LCV=4500 Kcal/Kg) Here aside a ROT17 EC plant during mounting phase G&G IMPIANTI sas di Ing.Gallarati C.&C.
12
HYDRAULIC LOADING MACHINE OF A ROT15CC FURNACE
G&G IMPIANTI sas di Ing.Gallarati C.&C.
13
Stack effect from a ROT60 furnace (NZEP plant) (near to zero emissions plant)
G&G IMPIANTI sas di Ing.Gallarati C.&C.
14
Stack effect from a ROT15 CC furnace
G&G IMPIANTI sas di Ing.Gallarati C.&C.
15
Inertized ash, completely roasted and exhausted
G&G IMPIANTI sas di Ing.Gallarati C.&C.
16
LAY-OUT SAMPLE OF A ROT17 C.C. PLANT
G&G IMPIANTI sas di Ing.Gallarati C.&C.
17
LAY-OUT SAMPLE OF A ROT10 EC PLANT FOR HOSPITAL WASTE - 500 KG/H
G&G IMPIANTI sas di Ing.Gallarati C.&C.
18
Lay-out of a big incinerator center for a large municipality fitted with Nr.4 ROT 150 parallel
G&G IMPIANTI sas di Ing.Gallarati C.&C.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.