Download presentation
Presentation is loading. Please wait.
Published byMandy Newborn Modified over 9 years ago
1
1 © 2012 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. KPMG and the KPMG logo are registered trademarks of KPMG International. Combining Labour Market Economic Modelling with Traditional Cost Estimation Mr Iain Bain Andrew Nicholls KPMG
2
2 © 2012 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. KPMG and the KPMG logo are registered trademarks of KPMG International. Traditional Approach Labour/Effort Cost Schedule Generic Indexation Risks
3
3 © 2012 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. KPMG and the KPMG logo are registered trademarks of KPMG International. Labour/Effort - Replacement Submarine Design Effort Year201520162017201820192020202120222023202420252026202720282029 DraftsmenElectrical Design6121620487796 773920 10 DraftsmenMechanical Design681220313958 392012 DraftsmenPiping Vent Design610 2031396786 673918 12 DraftsmenStructural Design1620295896134 965029 20 DraftsmenOther Design10 14293958 3920 EngineerElectrical101420293958 392010 EngineerMechanical810 202939 2920106666 EngineerFluids410 202939 2920106666 EngineerNaval Architecture/Structure and Arrangements162939587796 77583929 20 EngineerCombat Systems1629395877 58 39 EngineerSignature Analsysis66101420232923201610 20 EngineerPlanning/Production24661020 1066444 EngineerTesting246610 6446 EngineerManagement6101620 16 10 66 EngineerEngineering Support610162039 20 10 EngineerOther Engineering6101620293958 3929 394858 Total 126196269418624807898911869620390277287253263 Source: Australia’s Submarine Design Capabilities and Capacities, RAND, 2011
4
4 © 2012 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. KPMG and the KPMG logo are registered trademarks of KPMG International. Price: Some Simplifying Assumptions Experienced and highly trained workforce required Using $100,000 p.a. as not unreasonable, but also for simplicity Source: Australia’s Submarine Design Capabilities and Capacities, RAND, 2011
5
5 © 2012 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. KPMG and the KPMG logo are registered trademarks of KPMG International. Design Activity: Nominal or Out-turned Price Over $1bn using standard approach
6
6 © 2012 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. KPMG and the KPMG logo are registered trademarks of KPMG International. Question: We all understand potential cost risk for highly skilled workforce, but can these be quantified
7
7 © 2012 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. KPMG and the KPMG logo are registered trademarks of KPMG International. Bringing in Economic Modelling approach Intergrates labour market economic modelling into traditional cost estimation Provides more robust estimation of budget related to personnel by projecting the economy-wide skills gaps for required skills accounting for such skills gaps in individual occupations that are required by a specific project. Has application for projects that may have significant demand for highly sort after skills within the economy..
8
8 © 2012 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. KPMG and the KPMG logo are registered trademarks of KPMG International. Methodology: A Step-by-Step Labour market model to produce skills gaps for each ANZSCO occupation Map each employment of interest based on major ANZSCO codes Based on the labour market model output, identify potential pressure wages growth for each employment category Calculate final impact on cost estimate
9
9 © 2012 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. KPMG and the KPMG logo are registered trademarks of KPMG International. A practical application of our approach : Step 1 - apply labour market model to produce skills gaps for each ANZSCO occupation 1. Employment by industry (Macro CGE model) 4. Labour force by education (Education Model) Balancing Occupational Demand & Supply 3. Population by age groups (Demographi c Model) 2. Employment by occupation (Occupation al Demand Model) 5. Labour force by occupation (Occupation al Supply Model) Labour Demand Labour Supply Model system control of inputs and outputs
10
10 © 2012 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. KPMG and the KPMG logo are registered trademarks of KPMG International. Model Output for each year Industry 1.Industry 2...... Industry 19Industry 20 Total Demand Total SupplySkills Gap Occupation 1 Occupation 2 Occupation 3..... Occupation 40..... Occupation 473 Occupation 474 Total Employment 20 Industries: ANZSIC 1 Digit Classification 474 Occupations: ANZSCO 4 Digit Classification
11
11 © 2012 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. KPMG and the KPMG logo are registered trademarks of KPMG International. Step 2 - Map each employment of interest based on major ANZSCO codes Occupational projection of number of employment for a specific project
12
12 © 2012 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. KPMG and the KPMG logo are registered trademarks of KPMG International. Mapping Skill Sets to ANZSC codes Note that ANZSCO codes also go to lower levels, but these have not been used in this example
13
13 © 2012 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. KPMG and the KPMG logo are registered trademarks of KPMG International. Step 3 - Identify potential pressure wages growth for each employment category The index designed to capture wage pressure at the occupational, INDEX_OCCUPATIONAL, produces a rather different picture as opposed to the national index, INDEX_NATIONAL
14
14 © 2012 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. KPMG and the KPMG logo are registered trademarks of KPMG International. Step 4 - Calculate final impact on cost estimate based on the occupational index Accordingly, using our approach gives a different budgetary outcome over the lifespan of the project
15
15 © 2012 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. KPMG and the KPMG logo are registered trademarks of KPMG International. Difference made by considering occupation specific wage pressure
16
16 © 2012 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. KPMG and the KPMG logo are registered trademarks of KPMG International. Issues dealing with sub-skills set analysing the concentration of technical skills in the occupations needed for the project a higher wage pressure results from higher concentrated sub-skills set in a occupation (results a 10% increase in the occupational index)
17
17 © 2012 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. KPMG and the KPMG logo are registered trademarks of KPMG International. Issues dealing with sub-skills set budget gap over time and accumulative budget gap
18
18 © 2012 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. KPMG and the KPMG logo are registered trademarks of KPMG International. Concluding Remarks - Large complex projects significantly benefit from integration of economic and costing analysis. -Labour Market risks can be quantified. - Approach has broad application for Defence and Natural Resources industries
19
19 © 2012 KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. KPMG and the KPMG logo are registered trademarks of KPMG International. Questions
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.