Download presentation
Presentation is loading. Please wait.
Published byMegan O'Leary Modified over 11 years ago
1
Assessing Hydrological Model Performance Using Stochastic Simulation
Ke-Sheng Cheng Department of Bioenvironmental Systems Engineering National Taiwan University September 8, 2010
2
INTRODUCTION Very often, in hydrology, the problems are not clearly understood for a meaningful analysis using physically-based methods. Rainfall-runoff modeling Empirical models – regression, ANN Conceptual models – Nash LR Physical models – kinematic wave September 8, 2010
3
Regardless of which types of models are used, almost all models need to be calibrated using historical data. Model calibration encounters a range of uncertainties which stem from different sources including data uncertainty, parameter uncertainty, and model structure uncertainty. September 8, 2010
4
The uncertainties involved in model calibration inevitably propagate to the model outputs.
Performance of a hydrological model must be evaluated concerning the uncertainties in the model outputs. Uncertainties in model performance evaluation. September 8, 2010
5
ASCE Task Committee, 1993 “Although there have been a multitude of watershed and hydrologic models developed in the past several decades, there do not appear to be commonly accepted standards for evaluating the reliability of these models. There is a great need to define the criteria for evaluation of watershed models clearly so that potential users have a basis with which they can select the model best suited to their needs”. Unfortunately, almost two decades have passed and the above scientific quest remains valid. September 8, 2010
6
SOME NATURES OF FLOOD FLOW FORECASTING
Incomplete knowledge of the hydrological process under investigation. Uncertainties in model parameters and model structure when historical data are used for model calibration. It is often impossible to observe the process with adequate density and spatial resolution. Due to our inability to observe and model the spatiotemporal variations of hydrological variables, stochastic models are sought after for flow forecasting. September 8, 2010
7
A unique and important feature of the flow at watershed outlet is its persistence, particularly for the cases of large watersheds. Even though the model input (rainfall) may exhibit significant spatial and temporal variations, flow at the outlet is generally more persistent in time. September 8, 2010
8
Illustration of persistence in flood flow series
A measure of persistence is defined as the cumulative impulse response (CIR). September 8, 2010
9
The flow series have significantly higher persistence than the rainfall series.
We have analyzed flow data at other locations including Hamburg, Iowa of the United States, and found similar high persistence in flow data series. September 8, 2010
10
The Problem of Lagged Forecast
September 8, 2010
11
September 8, 2010
12
CRITERIA FOR MODEL PERFORMANCE EVALUATION
Relative error (RE) Mean absolute error (MAE) Correlation coefficient (r) Root-mean-squared error (RMSE) Normalized Root-mean-squared error (NRMSE) September 8, 2010
13
Coefficient of efficiency (CE) (Nash and Sutcliffe, 1970)
Coefficient of persistence (CP) (Kitanidis and Bras, 1980) Error in peak flow (or stage) in percentages or absolute value (Ep) September 8, 2010
14
September 8, 2010
15
Coefficient of Efficiency (CE)
The coefficient of efficiency evaluates the model performance with reference to the mean of the observed data. Its value can vary from 1, when there is a perfect fit, to A negative CE value indicates that the model predictions are worse than predictions using a constant equal to the average of the observed data. September 8, 2010
16
Model performance rating using CE (Moriasi et al., 2007)
Moriasi et al. (2007) emphasized that the above performance rating are for a monthly time step. If the evaluation time step decreases (for example, daily or hourly time step), a less strict performance rating should be adopted. September 8, 2010
17
Coefficient of Persistency (CP)
It focuses on the relationship of the performance of the model under consideration and the performance of the naïve (or persistent) model which assumes a steady state over the forecast lead time. A small positive value of CP may imply occurrence of lagged prediction, whereas a negative CP value indicates that performance of the considered model is inferior to the naïve model. September 8, 2010
18
An example of river stage forcating
Model forecasting CE= ANN model observation September 8, 2010
19
Model forecasting CE=0.68466 CP= -0.3314 Naive forecasting CE=0.76315
ANN model observation Naïve model September 8, 2010
20
Bench Coefficient Seibert (2001) addressed the importance of choosing an appropriate benchmark series with which the predicted series of the considered model is compared. September 8, 2010
21
The bench coefficient provides a general form for measures of goodness-of-fit based on benchmark comparisons. CE and CP are bench coefficients with respect to benchmark series of the constant mean series and the naïve-forecast series, respectively. September 8, 2010
22
The bottom line, however, is what should the appropriate benchmark series be for the kind of application (flood forecasting) under consideration. We propose to use the AR(1) or AR(2) model as the benchmark for flood forecasting model performance evaluation. A CE-CP coupled MPE criterion. September 8, 2010
23
Demonstration of parameter and model uncertainties
September 8, 2010
24
Parameter uncertainties without model structure uncertainty
September 8, 2010
25
Parameter uncertainties without model structure uncertainty
September 8, 2010
26
Parameter uncertainties without model structure uncertainty
September 8, 2010
27
Parameter uncertainties with model structure uncertainty
September 8, 2010
28
Uncertainties in model performance RMSE
September 8, 2010
29
Uncertainties in model performance RMSE
September 8, 2010
30
Uncertainties in model performance CE
September 8, 2010
31
Uncertainties in model performance CE
September 8, 2010
32
Uncertainties in model performance CP
September 8, 2010
33
Uncertainties in model performance CP
September 8, 2010
34
It appears that the model specification error does not affect the parameter uncertainties. However, the bias in parameter estimation of AR(1) modeling will result in a poorer forecasting performance and higher uncertainties in MPE criteria. September 8, 2010
35
ASYMPTOTIC RELATIONSHIP BETWEEN CE AND CP
Given a sample series { }, CE and CP respectively represent measures of model performance by choosing the constant mean series and the naïve forecast series as benchmark series. The sample series is associated with a lag-1 autocorrelation coefficient September 8, 2010
36
[A] September 8, 2010
37
Given a data series with a specific lag-1 autocorrelation coefficient, we can choose various models for one-step lead time forecasting of the given data series. Equation [A] indicates that, although the forecasting performance of these models may differ significantly, their corresponding (CE, CP) pairs will all fall on a specific line determined by . September 8, 2010
38
Asymptotic relationship between CE and CP for data series of various lag-1 autocorrelation coefficients. September 8, 2010
39
The asymptotic CE-CP relationship can be used to determine whether a specific CE value, for example CE=0.55, can be considered as having acceptable accuracy. The CE-based model performance rating recommended by Moriasi et al. (2007) does not take into account the autocorrelation structure of the data series under investigation, and thus may result in misleading recommendations. September 8, 2010
40
Consider a data series with significant persistence or high lag-1 autocorrelation coefficient, say 0.8. Suppose that a forecasting model yields a CE value of 0.55 (see point C). With this CE value, performance of the model is considered satisfactory according to the performance rating recommended by Moriasi et al. (2007). However, it corresponds to a negative value of CP (-0.125), indicating that the model performs even poorer than the naïve forecasting, and thus should not be recommended. September 8, 2010
41
Asymptotic relationship between CE and CP for data series of various lag-1 autocorrelation coefficients. September 8, 2010
42
1= 0.843 CE=0.686 at CP=0 1= 0.822 CE=0.644 at CP=0 1= 0.908
September 8, 2010
43
For these three events, the very simple naïve forecasting yields CE values of 0.686, 0.644, and respectively, which are nearly in the range of good to vary good according to the rating of Moriasi et al. (2007). September 8, 2010
44
In the literature we have found that many flow forecasting applications resulted in CE values varying between 0.65 and With presence of high persistence in flow data series, it is likely that not all these models performed better than naïve forecasting. September 8, 2010
45
Another point that worth cautioning in using CE for model performance evaluation is whether it should be applied to individual events or a constructed continuous series of several events. Variation of CE values of individual events enables us to assess the uncertainties in model performance. Whereas some studies constructed an artifact of continuous series of several events, and a single CE value was calculated from the multiple-event continuous series. September 8, 2010
46
CE value based on such an artifactual series cannot be considered as a measure of overall model performance with respect to all events. This is due to that fact that the denominator in CE calculation is significant larger for the artifactual series than that of any individual event series, and thus the CE value of the artifactual series will be higher than the CE value of any individual event. September 8, 2010
47
For example, the CE value by naïve forecasting for an artifactual flow series of the three events in Figure 1 is which is significant higher than the naïve-forecasting CE value of any individual event. September 8, 2010
48
1= 0.843 CE=0.686 at CP=0 1= 0.822 CE=0.644 at CP=0 1= 0.908
September 8, 2010
49
A nearly perfect forecasting model
CE= CE= CE= CE= CE= CE= CE= CE= CE= September 8, 2010
50
A CE-CP COUPLED MPE CRITERION
Are we satisfied with using the constant mean series or naïve forecasting as benchmark? Considering the high persistence nature in flow data series, we argue that performance of the autoregressive model AR(p) should be considered as a benchmark comparison for performance of other flow forecasting models. September 8, 2010
51
From our previous experience in flood flow analysis and forecasting, we propose to use AR(1) or AR(2) model for benchmark comparison. September 8, 2010
52
The asymptotic relationship between CE and CP indicates that when different forecasting models are applied to a given data series (with a specific value of 1, say *), the resultant (CE, CP) pairs will all fall on a line determined by Eq. [A] with 1= * . September 8, 2010
53
In other words, points on the asymptotic line determined by 1=
In other words, points on the asymptotic line determined by 1= * represent forecasting performance of different models which are applied to the given data series. Using the AR(1) or AR(2) model as the benchmark, we need to know which point on the asymptotic line corresponds to the AR(1) or AR(2) model. September 8, 2010
54
CE-CP relationships for AR(1) model
[B] September 8, 2010
55
CE-CP relationships for AR(1) and AR(2) models
September 8, 2010
56
Example of event-1 September 8, 2010 1=0.843 AR(2) model
Data AR(2) modeling AR(1) model Data AR(1) modeling September 8, 2010
57
Assessing uncertainties in (CE, CP) using modeled-based bootstrap resampling
September 8, 2010
58
Assessing uncertainties in MPE by bootstrap resampling (Event-1)
September 8, 2010
59
Assessing uncertainties in MPE by bootstrap resampling (Event-1)
September 8, 2010
60
Conclusions Performance of a flow forecasting model needs to be evaluated by taking into account the uncertainties in model performance. AR(2) model should be considered as the benchmark. Bootstrap resampling can be helpful in evaluating the uncertainties in model performance. September 8, 2010
61
As a final remark, we like to reiterate a remark made by Seibert (2001) a decade ago:
“Obviously there is the risk of discouraging results when a model does not outperform some simpler way to obtain a runoff series. But if we truly wish to assess the worth of models, we must take such risks. Ignorance is no defense.” September 8, 2010
62
Thank you for your attention. Your comments are most welcome!
September 8, 2010
63
What exactly does ensemble mean?
“Ensemble” used in weather forecasting Ensemble Prediction System (EPS) Ensemble Streamflow Prediction (ESP) Perturbation instead of stochastic variation “Ensemble” in statistics A collection of all possible outcomes of a random experiment. September 8, 2010
64
In mathematical physics, especially as introduced into statistical mechanics and thermodynamics by J. Willard Gibbs in 1878, an ensemble (also statistical ensemble or thermodynamic ensemble) is an idealization consisting of a large number of mental copies (sometimes infinitely many) of a system, considered all at once, each of which represents a possible state that the real system might be in. September 8, 2010
65
In both cases, the fact of including stochastic physics in the model gives rise to higher forecast scores values than using only an ensemble based on random perturbations to the initial conditions. September 8, 2010
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.