TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
2
Outline Introduction Previous work OMB 6U Final prototype OMB 9U Schedule for production
3
ATLAS detector
4
Optical Multiplexer Board 64 modules x 4 Barrels 2 links out per module with redundant data. Global CRC and DMU CRC. 8 OMBs x 4 crates OMB: 16 In / 8 Out CRC checking VME error counters Data injection to RODs 8 RODs x 4 crates ROD: 8 In/ 2 out Data processing
5
Outline Introduction Previous work OMB 6U Final prototype OMB 9U Schedule for production
6
Previous work OMB 6U Specifications VME 6U Board format 2 input channels (4 input fibers) @ 640 Mbit/s 2 output channels (2 output fibers) Digital data analysis (CRC computation) Trigger and Busy inputs
7
VME_FPGA ALTERA ACEX FPGA EP1K100 VME R/W registers Status/control CRC error registers Provides communication between VME bus and CRC_FPGAs. 2 CRC_FPGAs Altera Cyclone® FPGA Real-time CRC check Internal memory lets us download and inject real events towards the ROD. Event counter generator CRC injection OPTICAL I/O 4 Optical transceivers I/O (Infineon®V23818-K305-L17) 2 Inputs / 1 Output per each CRC_FPGA SERIALIZERS/ DESERIALIZERS 4 receivers (HDMP 1034) 2 transmitters (HDMP1032) The same ones as the I.C.s VME INTERFACE FP connectors LEMO input conectors: Trigger and busy Previous work OMB 6U
8
ROD production with the OMB 6U Front-End emulation with the OMB 6U. Events injected with CRC Online CRC checking Total events injected: 13 x 10 9 events Total events checked: 1,7 x 10 9 events
9
Outline Introduction Previous work OMB 6U Final prototype OMB 9U Schedule for production
10
Final prototype OMB 9U Same basic functionality CRC checking Data injection 40 MHz clock Differences 8 channels 16 input fibers 8 output fibers TTCrx Mezzanine connectors: more processing power?
11
PCB technical specifications PCB details Input/output signals designed for operation at 80 MHz Standard 9U VME board size 1272 components 2278 nets 10 copper layers Signal layers between power/gnd planes Adjacent layers routed orthogonally for minimum coupling
12
OMB main components OPTICAL CONNECTORs (Stratos Lightwave) G_LINKS chips (Agilent HDMP1032/34) 8 CRC FPGAs (Altera CYCLONE 324pins) 4 Processing Units slots VME FPGA (Altera CYCLONE 400pins) TTC FPGA & TTCrx (ALTERA ACEX 144pins)
13
OMB CRC checking 16 Front End inputs. 8 output to ROD Real time CRC checking. GLOBAL DMU CRC TTC Information BCID DMU check Error counters readable from VME.
14
OMB: ROD injector Data injector to RODs. Actual data Autogenerated data. Trigger: External source. TTC information
15
OMB: Processing Units Upgrade 4 Processing Units. Compatible with ROD PUs. Pre-processing of front end data.
16
Outline Introduction Previous work OMB 6U Final prototype OMB 9U Schedule for production
17
Schedule First prototype validated. Currently producing the second prototype with minor changes Software and firmware adaptation from 6U board. Production of 38 boards during the summer. Installation in the ATLAS cavern at the end of the year.
18
Backup slides
19
Final prototype OMB 9U
20
Signal integrity issues Big area, not too much populated Long distance traces (high coupling) Clock distribution JTAG chain distribution VME-CRC FPGA serial bus Different voltage supplies +3.3 Volt for FPGA I/O and some logic +1.5 Volt for FPGA cores (island) +5 Volt for logic +12 Volt for NIM/TTL conversion (ext. trigger input)
21
Final prototype OMB 9U Example of SI analysis: VME to CRC serial BUS Connected between the VME FPGA and all CRC FPGAs For control, communication, configuration, etc. 4 lines: CLK, DATA0, DATA1, DATA2, DATA3 Frequency of operation 40 MHz
22
Final prototype OMB 9U First attempt Manual placement and routing of bus lines Keep stubs short Keep same routing layer as much as possible R, RC termination Problem Characteristic impedance change at T junction Reflections at first FPGA creates InterSymbol Interference (ISI)
23
Final prototype OMB 9U PostLayout simulation
24
Final prototype OMB 9U Second attempt Manual placement and routing of bus lines Keep stubs short Keep same routing layer as much as possible Problem Reflections with different termination schemes
25
Final prototype OMB 9U PostLayout simulation
26
Final prototype OMB 9U Final attempt Manual placement and routing of bus lines Keep stubs short Keep same routing layer as much as possible Solution Resistive termination at both ends
27
Final prototype OMB 9U PostLayout simulation