Download presentation
Presentation is loading. Please wait.
Published byEmanuel Lippitt Modified over 10 years ago
1
PULL TEST Tank Industries (Pty) Ltd Welcomes Plessey
2
PULL TEST Scale at ZERO
3
PULL TEST Scale at 10Kg
4
PULL TEST Scale at 35Kg
5
MAJOR STRATEGIES MAJOR STRATEGIES PULL TEST Scale at 80Kg
6
PULL TEST No Pulling away from Coupling
7
PULL TEST No Pulling away from Coupling
8
PULL TEST No pulling away from Coupling after 4 days
9
PULL TEST View of Coupling removed from Jig.
10
PULL TEST View of Coupling removed from Jig. Note how Hole has enlarged.
11
PULL TEST This test was undertaken after a curing period of 3 Hours with room Temperature Between 22°C to 25°C After 1 Hour The bolt stretched the size of the bolt hole. The Pipe was under strain on the jig for 4 Days. No Pulling away from the Coupling. Jig slacked down to 85kg with hole enlarging in Polyethylene Tests undertaken By TANK Industries South Africa 1.0 Shaheem Abbas Trainee Engineer 2.0 John Aupiais Applications Engineer 3.0 Eric Martinsich Product Manager Compiled by Eric Martinsich for information back to Polywater America (2009-04-15)
12
END Thank You
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.