Download presentation
Presentation is loading. Please wait.
Published byEdgar Guise Modified over 10 years ago
1
Verification and Independent Assurance Assessments, Audits, Standards and Processes The Global Initiative Presenter: Kris Chambers
2
The Challenge TASK Streamline Verification, Audit, Assurance and Warranty globally A question was asked globally of all regions conducting diving operations on BP managed and operated worksites (Upstream only) What process do you currently use for project diving assurance? Response: 8 regions and essentially 8 different answers 2
3
How to achieve this 1.Define assurance 2.Develop the global process 3.Educate Diving contractors to our expectations, UDP and the Policy Statements 4.Educate the BP Regional Diving Responsible Person, Technical Authorities and Client Approved Representatives to our expectations 5.Restructure the Global Team. 3
4
4 Definition of Quality Assurance Quality Assurance is defined as "a planned and systematic pattern of all actions necessary to provide adequate confidence that an item or product conforms to established technical requirements" (IEEE Institute of Electrical and Electronics Engineers)
5
BP Global Diving Systems Assurance and Audit 5
6
6 What exactly is the Assurance Process?
7
BP Global Diving Practice (and Guide Q1 2013) 7
8
BP Global Diving Policy Statements 8
9
EvaluateMonitor Compliance Planning Performing Measuring & Improving 9 Implementation THE ASSURANCE PROCESS Audit Team / Diving Client Approved Responsible Person (DRP) Representative (CAR) Note: 1.Audit team establishes the baseline audit and then the Regional DRP conducts annual review 2.CAR monitors performance on a project by project basis
10
10 Global Assurance Process - Monitoring
11
Any Questions 11
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.