Presentation is loading. Please wait.

Presentation is loading. Please wait.

Donna Lutz Steve Jones. Concept: Iowa’s First Destination Resort Park Lodge 108 rooms, conference center, restaurant, indoor water park 18-hole golf course.

Similar presentations


Presentation on theme: "Donna Lutz Steve Jones. Concept: Iowa’s First Destination Resort Park Lodge 108 rooms, conference center, restaurant, indoor water park 18-hole golf course."— Presentation transcript:

1 Donna Lutz Steve Jones

2 Concept: Iowa’s First Destination Resort Park Lodge 108 rooms, conference center, restaurant, indoor water park 18-hole golf course 28 family & group cabins RV campground Boat Ramp, Boat Docks Beach Day use area, paved/unpaved trails Ped Bridge to exisiting park

3 Lodge Complex $19 million project

4 Lodge opened Sep 19, 2008

5 Cabins available June 2009 Pedestrian Bridge 2010?

6

7 HCRP is intended to exemplify a sustainable approach to development, by protecting the natural environment of both the site itself and the neighboring Rathbun Lake. To meet this goal both water quality monitoring and stormwater management must be part of the development plans. Water Quality Monitoring Stormwater Management & Design

8 Before, During Construction and Not Quite Done

9 Boat ramp and RV Park Lodge Construction

10 Water Quality Monitoring Goal : To protect Rathbun Lake from contaminants due to construction activities at HCRP Work Plan: Baseline monitoring Construction monitoring Post-construction / Operational monitoring?? Components: Lake (near shore and offshore) Surface and integrated depth samples Stormwater inputs Static/first flush and automated samplers

11 HCRP WQ Monitoring Sites

12 Monitoring Protocol Storm Events First flush samples with static samplers at many locations Automatic sampling at prime location for 12 -24 hours Parameters- Solids (total, suspended and volatile) Turbidity, pH and Conductivity In –lake Sampling Near shore locations Depth integrated samples for solids and nutrients Depth profiles (YSI) for temp, DO, conductivity Other parameters - BTEX, pesticides, nutrients, metals

13 Static stormwater samplers

14 Site nearest Lodge Construction

15

16 In-stream sampling for BTEX

17 Automated stormwater sampling

18

19

20

21 Most important aspect: Communication to Steve about monitoring results and site inspections


Download ppt "Donna Lutz Steve Jones. Concept: Iowa’s First Destination Resort Park Lodge 108 rooms, conference center, restaurant, indoor water park 18-hole golf course."

Similar presentations


Ads by Google