HAROSA 2013 Barcelona July 10-12 WORKFORCE PLANNING AND SCHEDULING WITH CROSS-TRAINING AND LEARNING Scott E. Grasman Industrial & Systems Engineering Rochester Institute of Technology
2
Optimized worker scheduling in a production process or service setting. Worker allocation models 1.Single/Multi Period Worker-Task Allocation 2.Short-Term Cross-Training 3.Mid-Term Workforce Planning 4.Long-Term Workforce Development OUTLINE
3
Other considerations for short-term worker allocation models: Overtime assignments Individual worker preferences Factory rules and limitations Reduction of operational gaps Shift structures Learning? Approach/Solution: Two-Phase Goal (MIP) Programs see Jarugumilli et al (2011) SINGLE/MULTI PERIOD WORKER-TASK ALLOCATION
4
CROSS-TRAINING MODELS Workforce allocation may contain costly operational gaps: Approaches/Solution: Overtime allocations are temporary solutions. Effective cross-training plans are an essential component of worker allocation models. Identification of operations and workers for cross-training and implementation of the plans on a shift-by-shift basis. Learning is important. Workers of a particular skill level required at an operation Workers of that skill level assigned to the operation Operational Gap at that skill level
5
PROBLEM STATEMENT
6
FORMULATION – SETS
7
MATHEMATICAL FORMULATION Assignment Cost Overtime Allocation Cost Cost of Workforce Surplus Cost of Cross-training Cost of Slack in Cross-training Cost of surplus in Cross-training Requirements for training and for normal worker allocation
8
MATHEMATICAL FORMULATION Constraints which determine the binary variable that depends on the normal work assignment Limitation on the minimum shift duration that the worker can be assigned for Worker shift duration constraint Overtime Limit A worker is either allocated normally or trained in a shift
9
MATHEMATICAL FORMULATION Limit on cross-training for both individual shifts and the complete factory Training duration should be continuous Constraints that control the condition that training for L2 and L3 cannot take place if there is normal work of any skill level taking place at the same operation.
10
MATHEMATICAL FORMULATION The start of training is recorded and the workers are assigned to training if the training takes place. A worker cannot be trained multiple times on the same OP-Skill combo Training variables will be carried forward to the shifts of the next time horizon
11
MATHEMATICAL FORMULATION Connecting the end of training and the start of training Training can only occur on one skill level at any operation in any shift. Calculating the shifts where the worker can work or get trained in higher skill level after his training takes place.
12
MATHEMATICAL FORMULATION Constraints on the minimum and maximum possible qualifications of a worker. Workers can only be trained on L3, if they are qualified on L2; and they can only be trained on L2 if they are qualified on L1 for the same operation.
13
MATHEMATICAL FORMULATION Pre-allocation for training Partial allocation for work
14
RESULTS Industrial Test Cases ~100-150 workers and ~ 40-50 operations Solve in seconds (when linear) or minutes (when non-linear) Reduction in overtime and operational gaps (see Gandhi et al 2013)
15
CONTINUED WORK Extension Worker Qualification is Non-Linear Parallel Work: Mid-Term Workforce Planning Stochastic Models Future Work: Long-Term Workforce Development Non-Linear Learning Models
16
Aim: determine the size of the workforce at the start of the planning horizon in order to increase flexibility within the workforce (without double counting workers): shift swaps, cross-training, and overtime hiring and firing overtime once the actual demand is revealed Approach/Solution: Two-Stage Stochastic Programming 1.In the first stage, size of the workforce will be built using workers from previous planning horizon, shift-swaps, hiring and cross training 2.In the second stage, actual value of the demand will be revealed that will decide the recourse, i.e. required overtime WORKFORCE PLANNING
17
MODEL :OBJECTIVE FUNCTION
18
MODEL : CONSTRAINTS
20
SOLUTION APPROACH Scenario based Approach see Kulkarni et al (2013) 1.Generate demand scenarios, e.g., low, average, high 2.Determine the probability of occurrence of each demand scenario Converts the problem into an extended deterministic version of the “original” model!
21
SOLUTION APPROACH: IMPLEMENTATION
22
COMPLEXITY OF THE PROBLEM For: j - operations, k - shifts l - skill levels r - possible demands for each operation Scenarios3 demand cases for j operations rjrj Constraints15 linear constraints2*j*k*l*(n r ) Variables8 continuous variables3*j*k*l*(n r )
23
Solved using Cplex 12.5 using C# Larger problems solved by limiting the scenarios Good opportunity for an analytical method or simulation optimization. TEST CASES OperationsSkillsShifts Demand CasesScenarios Time* (Seconds) First Stage Variables Second stage VariablesTotal Constraints 32432711 17419441553 8263656126 88018895681267501 926319683263 99063772924272621
24
The learning organization is “continually expanding its capacity to create its future” - Peter Senge, The Fifth Discipline: The Art & Practice of the Learning Organization LONG-TERM WORKFORCE DEVELOPMENT
25
Quantitative, descriptive models of how humans learn are non-linear: WHAT’S THE ISSUE?
26
LEARNING MODEL Production rate of worker i on task j in period Did i do task j in period t? Learning term Forgetting term Model proposed in:
27
LEARNING AND FORGETTING Forgetting leads to reduction in rate Rate in period 10 same under all plans
28
5 workers, 10 tasks, and 10 periods Knitro 7.0 unable to find a feasible solution for any instance within 2 hours HOW BIG OF AN INSTANCE CAN YOU SOLVE?
29
A VERY SIMPLE IDEA..... Suppose a model includes the following relation between variables y and x Because x has a finite and countable domain we can model it and the non-linear function with binary variables
30
RETURNING TO OUR PROBLEM.... Learning function has a finite and countable domain (number of times i performed task j between periods 0 and ) 1. Introduce a new binary variable (and linking constraints) to the model: Did i do j k times between periods 0 to t? 2. Enumerate production rates in a period.
31
Used Gurobi 5.1 Solver parameters: one hour time limit 1% relative gap 1 unit absolute gap (for these instances objective function values are typically less than 20 so relative gap not as meaningful) EXPERIMENTAL SETUP TO TEST REFORMULATION
32
Quantitative, descriptive models of how humans learn are non-linear: RECALL LEARNING CURVES…
33
INITIAL RESULTS instances with a heterogeneous workforce are the hardest to solve even though more workers means more z variables, instances easier to solve
34
The reformulated problems are significantly easier to solve and thus much bigger instances than what is seen in the literature can be solved (though solution time does depends on size and initial buffers/capacity). see Chacosky et al (2012) Future Develop an effective heuristic based on the reformulation? Tighten the formulation? Dynamic formulation? Integrate uncertainty in learning rates? Simulation?? Interface with planning and cross-training models! CONCLUSIONS & FUTURE WORK
35
Scott E. Grasman, Ph.D. Professor and Department Head, Industrial and Systems Engineering Kate Gleason College of Engineering Rochester Institute of Technology 81 Lomb Memorial Drive, Rochester, NY 14623 585-475-3952 (office) 585-475-2520 (fax) Scott.Grasman@rit.edu (or segeie@rit.edu) Scott.Grasman@rit.edusegeie@rit.edu YOU ARE ALL WELCOME TO VISIT ROCHESTER!!! QUESTIONS?