Download presentation
Presentation is loading. Please wait.
Published byKendall Friends Modified over 9 years ago
1
Trevor Andrews Holli Monroe Emily Piccione William Wright
2
Project Team Project Description Customer Needs Specifications Bill of Materials Final Design Mechanical System A Mechanical System B Electrical System Test Summary and Results User or Operator Instructions/ Manual Service Instructions/ Manual Lessons Learned Questions
3
Trevor AndrewsIndustrial & Systems Engineering Holli MonroeMechanical Engineering Emily Piccione Industrial & Systems Engineering William Wright Mechanical Engineering The project team would like to acknowledge and express appreciation to RIT faculty member Scott Bellinger for all of his help and assistance in executing this project.
4
In order to improve quality on the four-station assembly line within the Toyota Production Systems Lab at the Rochester Institute of Technology, two andon systems and a corresponding monitoring system were developed. One andon system consists of simple electronics controlled by predetermined logic. The other andon system is purely mechanical in nature. In order to highlight and record abnormalities, which can later be used to perform root cause analysis and develop preventative countermeasures, a monitoring system was designed alongside the andon systems.
7
Under $3,000 budget!
12
For more on Test Summary and Results consult EDGE webpage.EDGE webpage
13
For more on User or Operator Instructions/ Manual consult EDGE webpage.EDGE webpage
14
For more on Service Instructions/ Manual consult EDGE webpage.EDGE webpage
15
Ladder Logic Functions of a PLC How to wire, use longer wires originally
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.