SAMARIS Creep test Meeting at TRL 2-3 March 2005
2
SAMARIS March 2005 – State of creep test program 2 Time schedule Sample reception LAVOC cores December 2004 DRI slabs February 2005 Test program Sample preparation (coring and cutting) February 05 Density measurement Creep test - At 50°CFebruary-March 05 - At additional T°C to be discussed Binder information ?
3
SAMARIS March 2005 – State of creep test program 3 Creep test conditions (1/2) European standard PrEN 12696-25 Method A: uniaxial cyclic compression test with confinement Method B: triaxial cyclic compression test British Standard BS 598-111 Unconfined uniaxial loading test Internal Shell protocol Performed on the NAT Sample size 100 mm Diam 60 mm Height Normal stress100kN Temperature50°C Pulse time 0.2s loading + 1.8s rest
4
SAMARIS March 2005 – State of creep test program 4 Creep test conditions (2/2) PrEN 12607-25 (confined or triaxial) BS 598-111 (static load) Shell protocol Sample size D / H 148 mm D 60 mm H 100, 150 or 200 40 to 100 mm 100 mm D 60 mm H Normal stress 100 kPa Temperature 40°C (typical)30°C50°C Pulse 1s (0.5Hz) 3600 pulses 3600 s0.2s + 1.8s
5
SAMARIS March 2005 – State of creep test program 5 Sample preparation From LAVOC materialDone 2x9 cores 90mm diam (not 100mm) Layer sawing in order to have - Surface layer 2x30mm thick - Base layer 60mm thick From DRI materialUnder progress 2 slabs Coring Layer sawing as for LAVOC
6
SAMARIS March 2005 – State of creep test program 6 Preliminary measurements (1/3) Density measurement (for the time being for LAVOC only) Require information on mix characteristics (density, composition, …) Slight difference between base and surface layers Scattering of results (higher for surface than base) Impact of test results
7
SAMARIS March 2005 – State of creep test program 7 Preliminary measurements (2/3)
8
SAMARIS March 2005 – State of creep test program 8 Preliminary measurements (bis)
9
SAMARIS March 2005 – State of creep test program 9 First creep test result for LAVOC Base layer Excellent behaviour Longer test required Surface layer Lower behaviour Breakdown of certain sample
10
SAMARIS March 2005 – State of creep test program 10 Next step Creep test on the DRI material at 50°C Further information on mixture Coefficient calculation Binder data (viscosity of fresh binder) ? To be discussed Test at another temperature? Other conditions?