Download presentation
Presentation is loading. Please wait.
Published byBrennen Tush Modified over 9 years ago
1
ASTROSAT LAXPC Biswajit Paul Raman Research Institute, Bangalore On behalf of the LAXPC Team
2
ASTROSAT
3
EXOSAT-ME : 1983-1986 1.5-15 keV, 1800 sq cm With LE Imaging Telescopes (CMA) GINGA-LAC: 1987-1991 2-37 keV, 4000 sq cm With All Sky Monitor RXTE-PCA: 1996-200? 2-30 keV, 6000 sq cm All Sky Monitor and Hard X-ray Instrument ASTROSAT-LAXPC: 2-80 keV, 6000 sq cm With All Sky Monitor, Soft/Hard X-ray Instruments, UVIT Large Area X-ray Astronomical Observatories USA Exp,2000 sq cm IXAE, 1200 sq cm
5
IXAE
6
LAXPC Characteristics Area : 6,000 - 7,500 cm 2 Mass: 390 kg Time Resolution: 10 µs, dead time 30-35 µs Front-end and Processing Electronics: separate electronics for each detector Data Storage: Onboard Memory 570 MB per Orbit Detection Efficiency: 90-100 % upto 20 keV, ~40% upto 80 keV Energy Resolution: 12-13% at 20-60 keV Life Time: 3-10 Years, no Consumable
8
LAXPC: Effective Area
9
LAXPC: Energy Resolution
10
LAXPC: Complex Energy Response Energy response generation: Monte Carlo simulation / Ground calibration
11
Spectral Leakage in PCA and LAXPC PCA LAXPC
12
Spectral Leakage in PCA
13
LAXPC Schematic
14
LAXPC: Complex Energy Response PCA: Energy resolution of single events and escape events
15
ASTROSAT Ground Trace
16
LAXPC Advantages Large effective area in hard X-ray band Stable background Low Spectral leakage Wide energy band 2-80 keV with LAXPC 0.3-8 keV with SXT 10-150 keV with CZT Simultaneous, sensitive, multi-band UV/Optical observations Only timing instrument it this time frame
17
Studies with LAXPC Only Timing Instrument it this Time Frame Hard X-ray Response X-ray Pulsars (Pulsations, QPOs, Transient Nature, Orbital Evolutions) LMXBs (KHz and Low Frequency QPOs, Hard X-rays) Millisecond Accreting Pulsars Rotation Powered Pulsars (Simultaneous Radio observations) BHCs (QPOs and variations in a wide range of time scale) Pulsar Cyclotron Line Cluster Hard X-rays ? Sky Survey Sky Monitoring
18
Timing Studies
19
BH High Frequency QPOs (MAXI!)
20
CRSF with ASTROSAT LAXPC
21
Survey with Slew Data and Deep Survey
22
Radio X-ray Simultaneous Observations of Millisecond Pulsars: Absolute Timing
23
ASTROSAT Launch Window October-December 2011
24
A Thomson X-ray polarimeter has been designed, developed and successfully tested. Detectors, Front end electronics, Processing Electronics, Collimators with flat top response Test and calibration setup, Rotational stage An Engineering Model is under fabrication Minimum Detectable Polarisation of 3% at 5σ (50 mCrab) No of sources: 50 Thomson X-ray Polarimeter for a small satellite mission Unpolarised source Polarised source Results 24
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.