Horizontal Paintline
2
Layout
3
Jigging 25 jig bars available Can be used for long length upto 7m or small pieces Jigging and de-jigging made in same axis Cranes can take upto 3 jigs per load
4
Pre-treatment Chromating line Capacity for additional pre-treatment (ie. for steel sheets) 2m tanks x 7m profiles Heating by oil (boiler can be incl. although is overdimensioned) 2 manual Demag cranes
5
Conveyor Automatic and continuous conveyor Speed upto 3m/min Possible to modify conveyors to make plant more compact
6
Painting Gema paint technology (booth from 2004) 5 pistols each side (automated entry) Compressed air cleaning on pistol withdrawal 20 minute standard colour change
7
Infrared oven Between painting and main oven Initial melting of powder avoids cross contamination in the main oven Especially important when different colours in the main oven
8
Main oven Gas-fired with channels from underneath 2 gas burners at opposite corners
9
Also available... Spiral wrap packing line after dejigging with outfeed tables Line for covering painted sheets with protective foil
10
Additional Photos (pre-treatment and conveyor)
11
Additional Photos (painting)
12
Additional Photos (oven and conveyor)
13
Additional Photos (boiler and oil heating)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.