Presentation is loading. Please wait.

Presentation is loading. Please wait.

OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.

Similar presentations


Presentation on theme: "OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District."— Presentation transcript:

1 OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District

2 OP-Navigation.ppt2 SC GA ATLANTIC OCEAN Savannah R. St. Mary’s R. Savannah Harbor Savannah Harbor Brunswick Harbor AIWW Civil Works & Navigation Boundaries Boundaries

3 OP-Navigation.ppt3 u Sav’h Harbor 32.5 Miles u AIWW 161 Miles u Brunswick 24 Miles Total 217.5 Miles Total 217.5 Miles Navigation Projects

4 OP-Navigation.ppt4 Scheduled FY08 Dredging Work in Savannah District South Atlantic Division Savannah & Brunswick Inner Harbor FY08 Savannah & Brunswick Entrance Chl OCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEP Sea Turtles-screens & observers Striped bass spawning Hopper Dredge Maintenance Dredging Hydraulic Pipeline Dredge Maintenance Dredging Est. 6,000K CY BO10/15 Est. 2,000K CY BO23 BO15

5 OP-Navigation.ppt5 Savannah District FY 07 Hopper Dredge Program

6 OP-Navigation.ppt6 Scheduled FY08 Dredging Work in Savannah District South Atlantic Division FY08 Savannah & Brunswick Entrance Chl OCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEP Sea Turtles-screens & observers Hopper Dredge Maintenance Dredging BO10/15 Est. 2,000K CY BO23

7 OP-Navigation.ppt7 Savannah District u Project: Savannah Entrance Channel u Type of work: Maintenance u Depth: 42/44 ft u Width: 600 ft u Length: 11.4 miles u Quantity: 1.0 MCY u Type of Material: sand/silt/clay u Placement Areas: EPA approved ocean site and near shore sites u Distance to Placement Area: up to 11.5 miles u Type of Equipment: Hopper u Small Business Set Aside: No u Last Dredged: FY06 u Environmental Window: Dec 15- March 31 u Reason for Window: Right Whales and Sea Turtles

8 OP-Navigation.ppt8 Savannah District u Project: Brunswick Entrance Channel u Type Work: Maintenance u Depth: 36/38 feet u Width: 500 feet u Length: 16.8 miles u Quantity: 1.0 MCY u Type of Material: Sand/silt/clay u Placement Areas: EPA approved ocean site and near shore sites u Distance to Placement Area: up to 19 miles u Type of Equipment: Hopper u Small Business Set Aside: No u Last Dredged: FY07 u Environmental Window: 15 Dec-13 March u Reason for Window: Right Whales and Sea Turtles

9 OP-Navigation.ppt9 Savannah District FY07 Hydraulic Cutter Head Dredge Program

10 OP-Navigation.ppt10 Scheduled FY08 Dredging Work in Savannah District South Atlantic Division Savannah & Brunswick Inner Harbor OCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEP Striped bass spawning Hydraulic Pipeline Dredge Maintenance Dredging Est. 6,000K CY BO15

11 OP-Navigation.ppt11 Savannah District u Project: Savannah & Brunswick Inner Harbors u Type of work: Maintenance u Depth: (SH)40/46 ft, (BH)36 ft u Width: (SH)500 ft, (BH)400 ft u Length: (SH)21.3 miles, (BH)3 miles u Quantity: 6.0 mcy u Type of Material: sand/silt/mud u Placement Area: Upland placement sites u Distance to Placement Area: up to 2 miles u Type of Equipment: Hydraulic cutterhead pipeline u Small Business Set Aside: Yes u Last Dredged: FY07 u Environmental Window: (SH) March 15-May 30 (above Station 63+000) (BH)April 1-August 1 u Reason for Window: (SH)Striped Bass Spawning (BH) Least tern nesting

12 OP-Navigation.ppt12 SAVANNAH DISTRICT NEW WORK DREDGING PROGRAM SAVANNAH DISTRICT NEW WORK DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA US Army Corps of Engineers Savannah District US Army Corps of Engineers Savannah District

13 OP-Navigation.ppt13 Savannah District FY09FY10FY11FY12 ProjectDredgeQuantity Disposal Area 1st Qtr 2nd Qtr 3rd Qtr4th Qtr1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr Savannah Harbor Expansion Entrance Channel Hopper Pipeline 11.4 M Beach Ocean Littoral Savannah Harbor Expansion Inner Harbor Pipeline14.3 MUpland

14 OP-Navigation.ppt14 Type of Work: New Work Depth: 47‘ Width: varies Length: 36+ Miles Quantity: 25.7 Mcy Type of Material: Hard Sand, Silts and Clay Placement Area: Upland & Open water Distance to Placement Area: upto 15Miles Type of Equipment: Hopper/Pipeline Small Business Set Aside: No Last Dredged: 2007 Schedule: Bid Opening November 2008 POC: T. Alan Garrett Savannah Harbor Expansion


Download ppt "OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District."

Similar presentations


Ads by Google