Download presentation
Presentation is loading. Please wait.
Published byDaniel Kibbey Modified over 9 years ago
2
Developer Tester Architect IT / Project Manager BusinessAnalyst Designer Database Professional Team Collaboration Software Quality Project Transparency Supporting the whole of the Application Life Cycle
3
Microsoft Confidential3 Unified Repository [David Chappel, Tools for Team Development] Source Code Versions Development Tool Design Documents Architecture Tool Project Statistics Project Management Tool Test Cases Test Tool Requirements Requirements Tool Business Analysts Technology Leads Developers QA, Testers Project Managers
4
4
5
5
6
Good ALM can have Great ROI 6 −Global Manufacturer −Global Manufacturer ROI: 203% Payback: 6 months A global manufacturer deployed Microsoft Visual Studio Team System to improve the consistency and efficiency of internal software development, enabling it to support adoption of the widely recognized Capability Maturity Model for software development. This enabled the company to increase developer, project manager, and tester productivity while improving software quality. −Social Web Site −Social Web Site ROI: 512% Payback: 3 months A social networking Web site used Microsoft Visual Studio Team System to improve the productivity of its developers and project managers as well as to reduce software costs.
7
Microsoft Confidential7
8
8 Test Manager 2010 Manual Testing Layer Diagram UML Modeling Load Testing Web Testing Test Case Management IntelliTrace™ Architecture Explorer Fast Forward for Manual Testing Logical Class Designer Cloud Development Office Development Windows Development New WPF Editor Customizable IDE Multi-core Development Silverlight Tools Web Development SharePoint Development Generate from Usage Static Code Analysis Database Deployment Code Metrics Database Unit Testing Test Data Generation Test Impact Analysis UI Test Automation Code Coverage Performance Profiling Database Change Mgmt
9
9Reporting Team Portal Test Case Management Branch Visualization Version Control Build Automation Gated Check-in Agile Planning Tools Checkpoint Environment Environment from Template Virtual Env. Setup/Tear Down
10
10 Test Manager 2010 Test Case Management Fast Forward for Manual Testing Manual Testing Lab Mgmt Config. Team Explorer Team Agents Access TFS from within the Eclipse IDE and from Macintosh and UNIX Systems
11
11 Visual Studio Team System 2008 Team Suite with MSDN Premium Visual Studio 2010 Ultimate with MSDN Visual Studio Professional 2008 with MSDN Premium Visual Studio 2010 Professional with MSDN Visual Studio Team System 2008 Team Editions with MSDN Premium Visual Studio 2010 Premium with MSDN Visual Studio Professional 2008 with MSDN Professional Visual Studio 2010 Professional with MSDN License upgrade 4/12/2010 License upgrade 4/12/2010 License upgrade 4/12/2010 License upgrade 4/12/2010
12
12 Step 1: http://msdn.microsoft.com Step 2: Sign In with your Live ID Step 3: Click on “My Account” Step 4: Verify subscription Step 5: Access your benefits! Troubleshooting No “My Account”? Contact your MSDN Admin Wrong subscription? Contact your MSDN Admin Right subscription, but need to adjust to land in best VS 2010? Contact your MSDN Admin
13
13
22
−http://www.olegsych.com −http ://blogs.msdn.com/camerons −http://www.lovettsoftware.com −http://blogs.msdn.com/stevecook −http://www.peterprovost.org/blog/ −http://blogs.msdn.com/jmprieur
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.