Fall 2009 Workshop Level 1 Energy Audits - Energy Use Analysis - - Walk Through Analysis - Mr. Matt O’Brien, AIA, LEED AP November 17, 2009.

Similar presentations


Presentation on theme: "Fall 2009 Workshop Level 1 Energy Audits - Energy Use Analysis - - Walk Through Analysis - Mr. Matt O’Brien, AIA, LEED AP November 17, 2009."— Presentation transcript:

1 Fall 2009 Workshop Level 1 Energy Audits - Energy Use Analysis - - Walk Through Analysis - Mr. Matt O’Brien, AIA, LEED AP November 17, 2009

2 Program Development Establish Utility Baseline Facility Audits (Existing Conditions) Behavior ManagementLow Cost/No CostSystem Design Evaluate Results Reinvest Savings Develop Energy Conservation Measures (ECM) Implementation (Individualized School Plan) System Intervention Evaluate Results Implementation (Individualized School Plan) Reinvest Savings Evaluate Results Implementation (Individualized School Plan) Today’s Focus (Matt O’Brien) Agendas and Focus

3 PEA = Preliminary Energy Audit (use “New” ECM form) DES = Detailed Energy Survey (implies modeling) SEP = Strategic Energy Plan (and Water Plan) SEP Definitions: PEA’s, DES’s, SEP’s & M&V’s m & V = measurement & Verification M & v = Measurement & verification

4 The Preliminary Energy Audit involves collecting data about the building from construction and maintenance records and from a walk-thru of the building. Step 1 of the Strategic Energy Plan: PEA’s (Data Collection)

5 Why are Energy Audits Important ?

6 The results from an energy audit show you: 1. How efficiently your building is operating

7 The results from an energy audit show you: 1. How efficiently your building is operating 2. How you can increase efficiency using low cost or no cost changes in operation

8 The results from an energy audit show you: 1. How efficiently your building is operating 2. How you can increase efficiency using low cost or no cost changes in operation 3. How, with a capital investment, you can increase efficiency and reliability, and decrease maintenance costs

9 The Energy Utilization Index (EUI) +If your building has utility meters, you can identify the least efficient buildings by calculating the EUI for each metered building. + Buildings with a high EUI are probably wasting energy and money, and they are the best candidates for an energy “tune-up”.

10 Energy Performance Indicators:

11 How do I calculate the EUI for my building? Since: 1 kW-hr = 3,412 BTUs (Electric Bill) and 1 Therm = 100,000 BTUs (Gas Bill) and The building = 63,609 square feet then

12 How do I calculate the EUI for my building? Electrical Energy consumption: 1/1/08 to 12/31/08: 718,613 kW-hr. Natural Gas consumption: 1/1/08 t0 12/31/08: 10,819 therms. Based on the two values, the energy utilization index (EUI) and the energy cost index (ECI) are: 55.56 kBTU/SF/YR and 1.09 $/kBTU/SF/YR ENERGY TYPETOTAL ANNUAL USE UNITSCONVERSION MULTIPLIER TO THOUSANDS BTU THOUSAND BTU (kBTU) TOTAL ANNUAL COST ($) ELECTRICITY718,613kW-H3,412/1000 = 3.4122,451,90754,174 NATURAL GAS10,819Therms100,000/1000 = 1001,081,90015,116 Total3,533,807 63,609 = EUI=55.56 69,290 63,609 = ECI=1.09

13 Compare EUI to a data base of similar building types:

14 EUI & ECI Real Examples Section 1.5 Building Energy and Cost Indices: January 1, 2008 through December 31, 2008 is: 760,500 kW-h. 29,656 therms. EUI = 105 kBTU/SF/YR and ECI = 1.72 $/kBTU/SF/YR respectively. 4,119,120kW-h. 45,269 therms. EUI = 140 kBTU/SF/YR and ECI = 2.00 $/kBTU/SF/YR respectively. 332,820 kW-h. 3,157 therms. EUI = 123kBTU/SF/YR and ECI = 2.30 $/kBTU/SF/YR respectively. (The facility’s energy utilization index is on the high side the reason may be the presence of two huge computer laboratories)

15 What if buildings are not individually metered ? + Not having individual meters makes the task of prioritizing your energy “tune-up” program difficult. + However, larger, older buildings with central air conditioning and central heating are probably the least energy efficient and should be placed at the top of the priority list. + Sub-Metering devices

16 The “HOBO” Option Guilford County & GTCC In-House Electricians Aiding Installation of CT DataLoggers for M & V Study CT DataLoggers for M & V Study

17 Preliminary Energy Audit Findings Top Ten Low-Cost and No Cost Items 1. High or Low thermostat settings 2. Lights left “on” in unoccupied rooms 3. Dripping hot water faucets 4. Windows open when HVAC system is “on” 5. No weather stripping around doors 6. No caulking around windows 7. Heating boilers left idling during warm weather 8. Dirty coils in HVAC equipment 9. Clogged filters in HVAC equipment 10. Incandescent light bulbs

18 CERT’s ECM Tally Sheet-Top Ten (Summer 2008) Note: All 40 buildings were candidates for Performance Contracting. (We were unable to obtain energy bills in most cases) HITSENERGY CONSERVATION MEASURE 35 Occupancy sensors should be installed. 21 Replace existing T-12’s with T-8’s and magnetic ballasts. 18 Remove lighting from vending machines or install vending misers. 17 Install 1.6 gpf water closets and.5 gpf urinals and low flow faucets in rest rooms. 13 Economizer needed in the building. 8 Provide optimum stop-start system for the HVAC system. 8 24/7 exhaust fans, ventilation & water heaters to be put on timer & be OFF overnight. 7 Exit lights should be replaced with LED. 7 Chiller approach should be set to 10°F – It is currently about 4.8°F. 6 Install programmable T-stats in all zones with set-back capabilities.

19 Once no cost and low cost opportunities have been identified, then what? 1. Leadership team awareness and support 2. Monitor progress by installing meters and/or sub-meters. 3. Education program for occupants and maintenance staff. 4. Make repairs and publicize energy-use reductions on a quarterly basis. Step 2 of the Strategic Energy Plan: Evaluate Results & Develop Plan

20 Step 3 of the Strategic Energy Plan: DES’s (Quantify Energy Savings) The Detailed Energy Survey identifies and quantifies capital investment opportunities that will increase HVAC system and lighting system efficiency and reliability, and will decrease maintenance costs. The Detailed Energy Audit is conducted by a professional engineer who calculates utility savings, engineering design costs, construction costs, and payback.

21 Energy Simulations: Consumption Fig.3: 2008 Electric Energy Consumption

22 Energy Simulations: Demand Fig. 4: 2008 Electric Power Demand

23 Energy Simulations: Savings Energy Conservation Measure (ECM) Cost($)Savings (kWh)/yr. Dollar Savings/yr. Percentage Savings/yr. Option 1A1531112956781.3% Option 1B132082855001% Option 2A35,00043,1662,5904.7% Option 2B3,00016,5839951.8% Option 2C3,00050,0008501.5% Option 2D10,000166,6662,3594.3%

24 Detailed Energy Audit Top SIX Energy Investment Opportunities 1. Lighting replacement, occupancy sensors, and day-lighting controls. 2. Installing state-of-the-art HVAC controls 3. Installing variable speed drives on pumps and fans. 4. Updating outside air economizer controls. 5. Installing energy recovery units. 6. Replacing old, inefficient HVAC boilers and chillers,

25 Step 5 of the Strategic Energy Plan: Capital Project Implementation (Steps 4 and 6 are M&V’s) Selecting capital projects by choosing only projects with short paybacks, like relamping. Example: Replacing T12, 34 watt fluorescent lamps with T8, 25 watt lamps and electronic ballast: Estimated Savings $ 13,981 / year Estimated Cost: $ 39,597 Simple payback period: 2.8 years

26 Step 5 of the Energy Management Program: Capital Project Implementation Accepting a longer payback and funding more Projects, like motor replacement. Example: Replace the 75 hp Motor with Premium Energy Efficient Motor Estimated Savings: $ 905 / year Estimated Cost: $ 4,436 Simple payback period: 4.9 years It is assumed that the motor is operated 6000 hour/year.

27 Means of Capital Project Funding Raise construction funds (bonds, gifts) Hire an architect and engineer to prepare plans Bid the project Monitor Construction Commission the project Performance Contracting Select a performance contractor Sign the contract

28 Steps 4 & 6 of the Strategic Energy Plan: M & V (Measurement & Verification) Based on a year of actual operation, did the retrofit project reduce energy costs as predicted? Attend Dr. Rojeski’s presentation tomorrow.

29 Review and Questions 1. Data Collection – PEA 2. Evaluate Results/Develop Plan 3. Quantify Energy Savings – DES 4. Establish Baseline - M & v 5. Implement Plan 6. Verify/Validate - m & V Data Collection Develop Plan Implement Plan Measure Results Evaluate Results

30 Page 1 of the “NEW” SEO ECM

31 Page 2

32 Page 3

33 Page 4

34 Page 5

35 Page 6

36 Page 7

37 Page 8

38 Page 9

39 Page 10

40 Page 11


Download ppt "Fall 2009 Workshop Level 1 Energy Audits - Energy Use Analysis - - Walk Through Analysis - Mr. Matt O’Brien, AIA, LEED AP November 17, 2009."

Similar presentations


Ads by Google