Presentation is loading. Please wait.

Presentation is loading. Please wait.

Market Situation in Hungary Market Situation in Hungary The Geothermal Heat Pumps market in Central & Eastern Europe BRATISLAVA 12.11.2007. Bela Adam Renewable.

Similar presentations


Presentation on theme: "Market Situation in Hungary Market Situation in Hungary The Geothermal Heat Pumps market in Central & Eastern Europe BRATISLAVA 12.11.2007. Bela Adam Renewable."— Presentation transcript:

1 Market Situation in Hungary Market Situation in Hungary The Geothermal Heat Pumps market in Central & Eastern Europe BRATISLAVA 12.11.2007. Bela Adam Renewable energy expert, Chairman of the Hungarian Heat Pump Association

2 Set up of the Hungarian Heat Pump Association 20.06.2007.

3 The process of the geothermal heat pump systems in Hungary 2003 – first small and medium sized heat pump systems (20-50 units). – First regulations for closed-loop ground source heat pump systems. – Harkány Thermal Spa: installed capacity – 2,2 MW. 2004 – larger heat pump systems with 100-300 kW capacity (50-100 units) 2005 – family houses, industrial buildings up to 300-600 kW capacity (150 units) 2006 – Office/business buildings up to 800 kW capacity (200 units) 2007 – Pannon GSM Mobile Office Building 960 kW, 180 GHE Total installed capacity: ~ 10 – 15 MW (the calculation based on selling data because most of the heat pump systems have no license).

4 The distribution of the heat pump systems in Hungary Closed loop type: 60 % Open systems (groundwater): 25% Thermal water: 10 % Air-source heat pumps: 5% There is big possibility for the multistage utilisation of the thermal water in Hungary. The multistage utilization is supported by the Ground Heat Program (starting phase). Conception: to enhance the proportional rate of thermal energy from 3,6 PJ to 10 PJ by 2013.

5 ENERGY PRICES The implementing of the heat pump systems depends on the gas and electricity prices. – gas price: less than in the EU (price support) – electricity: at same level in the EU (no preferential tariff for heat pump systems)

6 hindering ‘activity’ of very strong natural gas lobby preferential electricity price is needed for heat pumps The equalisation of the Hungarian and the EU gas-prices will increase the spreading of the heat pump systems in large scale CONCLUSIONS

7

8

9 Payback time of the additional investment Family house – 11 kW (not supported): 10 years – 11 kW (supported, 10%): 8 years Industrial building – 200 - 900 kW (not supported): 8 years – 200 – 900 kW (supported, 25-40%): 6 - 4 years

10 Very large European BHE plants, status end of 2006 (Eugster & Sanner, 2007)

11 Páty, Verdung - warehouse Heating capacity: 610 kW Cooling capacity: 610 kW Number of BHE: 120 vertical loops Total BHE length: 12.000 m Type of BHE: single ‘U’ tube, each 100 m deep

12 HEATING CONTROL ROOM

13 PANNON PROJECT Start: 20th October, Under construction Heating capacity: 860 Kw, cooling capacity: 960 kW Number of BHE: 180 vertical loops Type of BHE: single ‘U’ tube, each 100 m deep Total BHE length: 18.000 m

14 DRILLING FOR BHE

15 Objectives and aims of the Hungarian Heat Pump Association provide technical and economic advice Lobby, preferential tariff for heat pumps quality control to coordinate the eco-labelling to process the heat pump technology education, courses action plan for Hungarian heat pump market

16 THANK YOU FOR YOUR ATTENTION! 1141 Budapest, Zsigárd u.21. Tel:+36(1)221-1458; Fax:+36(1)422-0004 www.hgd.hu www.hgd.hu info@hgd.hu