Download presentation
Presentation is loading. Please wait.
Published byMadisyn Minton Modified over 9 years ago
1
Property Assessed Clean Energy (PACE) Financing
2
What is PACE Energy Efficiency and Renewable Energy Financing Private sector buildings Put in place by localities- by ordinance Requires State enabling legislation PACE loan is treated like a tax assessment Started in 2009 in CA PACE laws in 31 states and DC
3
Why Use PACE 100% funding – No upfront costs Funding for up to 20 years Immediate positive cashflow No payoff on sale – PACE transfers to new owner Possible off-balance-sheet treatment Ability to pass payments through to tenants
4
PACE in Virginia Law enacted in 2009- but flawed Lacks priority lien status PACE Loan requires a lien status equal to tax lien- Treated as voluntary special assessment Virginia PACE Coalition to fix the law Lien status issue Lender consent
5
Virginia PACE Coalition Trane Boland Siemens ABM CREE Hannon Armstrong S&S Sales HCYU Alt-Energy Urban Ingenuity Renewable Funding Abacus Property Solutions Community Housing Partners Local Energy Alliance Program Virginia Energy Efficiency Council Richmond Region Energy Alliance
6
PACE Nationally- 2011
7
PACE Nationally- 2014
8
Growth of PACE Property Types
9
Connecticut PACE Program Commercial, industrial & multi-family Requires the consent of the existing mortgage lender Requires SIR>1 Renewable and energy efficiency
10
Connecticut PACE Program 200+ contractors trained 20 qualified capital providers Closed $30 million in deals -average size $700K Class B buildings $70 million of projects in the pipeline 17 mortgage lenders have provided consent
11
PACE Deal Snapshot Hilton Hotel Universal City, CA Amount - $7million Term – 20 years Rate – 7% fixed 50% reduction energy usage Energy & water savings - $800,000/yr ROI – 78% Local incentives sweetened the deal
12
PACE Deal Snapshot Shopping Center, Norwalk, CT Amount - $170,000 Term – 13 years Rate – 4.5% fixed 35,000 SF building Exterior LED Lighting Energy savings - $17,000yr
13
PACE Deal Snapshot Office Building, Toledo, OH Amount - $1.4 million Term – 15 years Rate – 4.32% fixed 60,000 SF building Cooling tower, lighting upgrade, hot water pump upgrade, building automation controls, new fan motors Estimated energy savings- 48%
14
Questions
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.