Presentation is loading. Please wait.

Presentation is loading. Please wait.

DOC ID © Chevron 2005 Implementation of NeSSI CPAC – November 8, 2007 John Dempster, Rick Junge, Sandra Krauthamer, Mark Lee, Stacey Miller, Don Nettles.

Similar presentations


Presentation on theme: "DOC ID © Chevron 2005 Implementation of NeSSI CPAC – November 8, 2007 John Dempster, Rick Junge, Sandra Krauthamer, Mark Lee, Stacey Miller, Don Nettles."— Presentation transcript:

1 DOC ID © Chevron 2005 Implementation of NeSSI CPAC – November 8, 2007 John Dempster, Rick Junge, Sandra Krauthamer, Mark Lee, Stacey Miller, Don Nettles

2 DOC ID © Chevron 2005 2 NeSSI Systems Richmond Refinery Liquid sample: Ultra Low Sulfur Diesel Supplier – CIRCOR  Pressure transducers installed [PLC program to monitor / autovalidation]  Combination of down mount and traditional system  Fabricated sample conditioning system enclosure System Integrator - TASC  Installed CIRCOR SCS enclosure to Shelter PLC for analyzer communication hiway and SCS monitoring

3 DOC ID © Chevron 2005 3 Richmond Refinery - ULSD PLC supporting SCS

4 DOC ID © Chevron 2005 4 Richmond Refinery - ULSD PLC HMI supporting SCS

5 DOC ID © Chevron 2005 5 Richmond Refinery - ULSD CIRCOR SCS

6 DOC ID © Chevron 2005 6 Richmond Refinery - ULSD CIRCOR SCS

7 DOC ID © Chevron 2005 7 Richmond Refinery - ULSD CIRCOR SCS

8 DOC ID © Chevron 2005 8 NeSSI Systems Richmond Refinery Liquid sample: Gasoline Hydrotreater Supplier – Parker  Down mount plate System Integrator - TASC  Installing in TASC designed and fabricated sample conditioning system and enclosure  PLC for analyzer communication hiway and SCS monitoring Scheduled Delivery Date: Dec ‘07

9 DOC ID © Chevron 2005 9 NeSSI Systems Richmond Refinery Vapor: Fuel Gas Drum analyzer system [3 systems] STATUS: Front end engineering phase complete

10 DOC ID © Chevron 2005 10 NeSSI Systems Pascagoula Refinery Liquid sample: Ultra Low Sulfur Diesel Supplier – Parker  Supplied down mount panel System Integrator - TASC  Installed Parker panel in sample conditioning system

11 DOC ID © Chevron 2005 11 Pascagoula ULSD Parker Panel

12 DOC ID © Chevron 2005 12 Pascagoula ULSD Parker Panel – Analyzer Flow

13 DOC ID © Chevron 2005 13 NeSSI Systems El Segundo Refinery Blender / Chevron Engineered / CIRCOR / AutoFlow (one off) / 1st generation / liquid [RVP azr] Total Sulfur GC / SAAI system integrator / CIRCOR / 1st generation / vapor sample DIB / SAAI system integrator / CIRCOR / 1.5 generation [smarts involved] / vapor sample FCCU / CEM / Chevron Engineered / CIRCOR / 1st generation / Stack Sample Nox & SO2

14 DOC ID © Chevron 2005 14 NeSSI Systems El Segundo Refinery – con’t  (2 systems) ULSD project / SAAI system integrator / CIRCOR / 1.5 generation [smarts involved] / liquid  (5 systems) Flare Gas / TASC / CIRCOR / 1.5 generation [smarts involved] / vapor  (3 systems) GC Applications / TASC / CIRCOR / 1.5 generation [smarts involved] / 2 vapor / 1 liquid  (2 systems) CEMS Applications / TASC / CIRCOR / 1.5 generation [smarts involved] / 2 vapor

15 DOC ID © Chevron 2005 15 El Segundo

16 DOC ID © Chevron 2005 16 El Segundo

17 DOC ID © Chevron 2005 17 El Segundo

18 DOC ID © Chevron 2005 18 El Segundo


Download ppt "DOC ID © Chevron 2005 Implementation of NeSSI CPAC – November 8, 2007 John Dempster, Rick Junge, Sandra Krauthamer, Mark Lee, Stacey Miller, Don Nettles."

Similar presentations


Ads by Google