Project Renovatio Joshua Fraser Alastair Fraser Ruofei Fu Chao Jiang Cheng Zhen Dacheng Zheng Tien Truong
2
System-Level Schematic
3
WBS: System Decomposition
6
Testing Plans Power (Current/Volt meter & Management systems) -Battery discharge and recharge rate and duration -Verify power conversion efficiencies Motor (G sensors, GPS, Speedometer and/or Dynamometer) -Top speed, acceleration, duration, etc. -Acceleration/Speed sustainability Heat (Temperature sensors and IR Camera) -Max temperature of motor and charger -Water/coolant temperature -Temperature range of batteries
7
Testing Plans Water/Rain Susceptibility (Hose or Sprinkler) -Power/battery systems are water tight -Wiring is properly insulated -No large potential differences between chassis and ground Safety Shutoffs (Crash, Ground Fault, and Hand Switches) -Crash sensor works properly -GFI’s properly detect current imbalances and shut off power -Hand switches properly disconnect power systems
8
Component Specifications
9
Risk Mitigation Plan
10
WBS: Project Organization
11
Organization Chart
12
Project Schedule
13
Questions? ●Project Site: o project-renovatio.bitballoon.com project-renovatio.bitballoon.com