Holman Highway 68 / Highway 1 Roundabout Planning Commission May 14, 2013
2
Congestion
4
Roundabout Project Need Long Traffic Q’s and excessive delay on E/B Holman Hwy 68 Q’s extend well beyond CHOMP Impact to public safety / access to hospital Operations / Safety at PB Gate Acceleration from Holman Hwy to southbound Hwy 1 entrance ramp Reduction in crashes and crash severity Dramatic Emission Reduction - as compared to signal
5
Operations
6
Interim Signal Alternative 2015 + Project PM Peak 660 315
7
Existing Condition 2015 + Project PM Peak 660 315
8
Existing Traffic Signal Condition 250’
9
40 MPH
10
What About Converting the Existing Intersections?
11
Holman Highway 115/2/2013 Roundabout
12
Beverly Manor Holman Highway Design Optimization-Overlay 125/2/2013
13
Tighter Radius = Slower Speed, Slower Speeds = Less Merge Distance Req’d Less Downstream Merge Distance Req’d Improved Pedestrian Safety Improved Entry/View Angle Longer Merge Distance Improved Lane Utilization Separation of Decision Making / Improved Signing and Lane Choice Design Optimization-Overview 135/2/2013 Improved Channelization
14
Improved Entry/View Angle Separation of Decision Making / Improved Signing and Lane Choice Design Optimization 145/2/2013
15
200’ 75’ Tighter Rad = Slower Speed 125’ merge distance Req’d Defined Intersection Movements = Simplified Driver Decisions = Safer Improved Bike Lane Delineation 155/2/2013 Design Optimization – Off Ramp “Built To Deliver”
16
Improved View Angles (12 deg.) Sends Correct Priority Message Entering Yield to Circulating Traffic Design Optimization 165/2/2013“Built To Deliver”
17
Design Optimization 175/2/2013“Built To Deliver”
18
The Timing is Right Pebble Beach Project Approved Concept Plan Complete Stakeholders On-Board Relinquishment In Process
19
Next Steps Engineering Design Project Report Amendment EIR Addendum Public Outreach and Education Construction
20
Design Optimization - Challenges Merging Thru Down- Stream Intersection Un-Defined Intersection Vehicular and Bicyclists Safety Concerns Large RT Radius = Higher Speed 205/2/2013 Longer Merge Distance Lane Choice/Complexity Compressed Decision Making Dist. Difficult to Sign “Built To Deliver”
21
Design Optimization - Challenges Flat Entry Angle 215/2/2013 Very Short Merge Distance Lane Utilization Truck/Freight Concerns Poor View Angle to Left Priority Confusion / Merge Behavior Entry-Circulating Crashes “Built To Deliver”
22
Interim Layout
Similar presentations