Download presentation
Presentation is loading. Please wait.
Published byMicah Grounds Modified over 9 years ago
1
The Process of Mining Ridge Road Elementary 3 rd Grade Rice’s Homeroom
2
Quality kaolin deposits are located by – Surveying – Drilling – Sampling – Testing
3
Once a mine is chosen, the plan is submitted to the state for evaluation and approval. The plan must contain… – Measures for erosion – Sediment control – Structures to be built
4
Before mining begins, the landowner removes any trees that be sold.
5
The life of a kaolin mine is determined by the quality and size of the deposit.
6
When the mining is complete, the last cuts are made into a lake or pond if there is sufficient water available.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.