Presentation is loading. Please wait.

Presentation is loading. Please wait.

PBK K-12 Bellaire High School Community Meeting Houston Independent School District \\ Bellaire, Texas \\ September 4, 2014 ARCHITECTURE \\ ENGINEERING.

Similar presentations


Presentation on theme: "PBK K-12 Bellaire High School Community Meeting Houston Independent School District \\ Bellaire, Texas \\ September 4, 2014 ARCHITECTURE \\ ENGINEERING."— Presentation transcript:

1 PBK K-12 Bellaire High School Community Meeting Houston Independent School District \\ Bellaire, Texas \\ September 4, 2014 ARCHITECTURE \\ ENGINEERING \\ PLANNING \\ TECHNOLOGY \\ FACILITY CONSULTING1-800-938-7272 \\ PBK.com

2 PAT Debra Campbell Carl Casteel Marina Finley Ashley Heng Bellaire High School – Students and Staff Community Members Todd Blitzer Kent Cantrell Tracy Christie Rachel Crochet Joel Leagans Diana Leeson Rocky Manuel Michael McDonough Sandi Johnson Judy Long Leisa Lovy Swati Narayan Amy McIntyre Andrew Monzon Bianca Rubio Allen Scarrow Project Advisory Team Tyler Smith Jay Stubbs Daniel Wilkes Zachary Wood

3 An Environment of Academic Excellence Develop academically, athletically, ethically, physically and socially Aesthetically pleasing and inspirational Will maintain or improve upon the quality of existing facilities Creation of green space A Culture of Academic Achievement Atmosphere of shared responsibility Academic challenge Intercultural understanding Mutual respect A belief in Collaboration Community Involvement for Success Encourage collaboration between students, parents, faculty and staff Environment that supports critical thinking, high achievement, ethical behavior, and respect for intercultural diversity. Neighborhood institution offering educational opportunities and hosts community engagements. Diverse cultures, traditions and customs are celebrated. Safety Allows for Success Open visible environment where students, teachers and staff are safe and secure. Guiding Principles

4 Setbacks Height Requirement Lot Coverage Parking Requirement Traffic Neighborhood Detention City Site Requirements Context Planning Considerations FERRIS DR MAPLE ST S. RICE AVE VALERIE ST.

5

6 Existing Site Plan MAPLE ST. S. RICE AVE. FERRIS DR. Preliminary designs under development EXISTING FOOTBALL FIELD AND TRACK EXISTING BASEBALL FIELD EXISTING SCIENCE BUILDING EXISTING BELLAIRE HIGH SCHOOL VALERIE ST.

7 Preliminary designs under development Ferris/Maple Option – Students Remain On-Site During Construction SAFETY _ CONSTRUCTION SCHEDULE _ STUDENT LIFE _ COMMUNITY IMPACT _ R I S K F A C T O R S MAPLE ST. S. RICE AVE. FERRIS DR. EXISTING SCIENCE BUILDING AUDITORIUM/ FINE ARTS PHYSICAL EDUCATION ATHLETICS POOL PRACTICE BASEBALL FIELD DINING COMMONS ADMINISTRATION CP STUDENT/STAFF PARKING PRACTICE FOOTBALL FIELD AND TRACK COURTYARD PARENT DROP-OFF LEARNING HUB KITCHEN MULTI-STORY CLASSROOM MULTI-STORY CLASSROOM BUS LANES Athletics will be temporarily located at Joe Kelly Butler Sports Complex 5 miles south of campus.

8 MAPLE ST. S. RICE AVE. FERRIS DR. AUDITORIUM/ FINE ARTS PHYSICAL EDUCATION ATHLETICS POOL MULTI-STORY CLASSROOM DINING COMMONS ADMIN CP COURTYARD LEARNING HUB KITCHEN EXISTING SCIENCE BUILDING PRACTICE BASEBALL FIELD STUDENT/ STAFF PARKING PRACTICE FOOTBALL FIELD AND TRACK PARENT DROP-OFF BUS LANES Preliminary designs under development SAFETY _ CONSTRUCTION SCHEDULE _ STUDENT LIFE _ COMMUNITY IMPACT _ R I S K F A C T O R S South Rice/Maple Option – Students will be Relocated During Construction

9 Next Steps

10 Thank You


Download ppt "PBK K-12 Bellaire High School Community Meeting Houston Independent School District \\ Bellaire, Texas \\ September 4, 2014 ARCHITECTURE \\ ENGINEERING."

Similar presentations


Ads by Google