Engineers Without Borders: EWB-PSU: www.ewb.pdx.edu changing the landscape of the developing world Corianne Hart Engineers Without Borders, Portland State Chapter Environmental Engineering, M.S. 2008
2
Overview EWB-USA EWB-Portland State University Chapter PSU Past Projects PSU Future Projects How to get involved!
3
EWB-USA Overview A non-profit humanitarian organization established to partner with developing communities worldwide in order to improve their quality of life Involves the implementation of sustainable engineering projects, while involving and training internationally responsible engineers and engineering students
4
EWB-USA History Founded by Dr. Bernard Amadei, at the University of Colorado at Boulder, in April 2000 First Project – San Pablo, Belize water supply system Mobilized 8 University of Colorado students, forming the founding members of the first chapter Demonstrated the potential of professional and student engineers working together
5
EWB-USA Mission Statement To partner with developing communities to improve their quality of life through the implementation of environmentally sustainable, equitable, and economical engineering projects. In the process of working to advance developing communities, EWB-USA promotes the development of globally aware and internationally responsible engineers, students, and professionals
6
EWB-USA Goals To create a system to empower developing communities To build relationships to meet the needs of a community To develop a new generation of globally and environmentally aware engineers To preserve, learn from, and propagate information on sustainable engineering practices To develop a sustainable organization
7
EWB – Portland State Chapter Student service organization Founded in 2005 30 students 4 faculty Several professional mentors Multidisciplinary: Civil Mechanical Electrical Environmental Economics Implemented 2 projects in Nicaragua
8
EWB-PSU Partnerships Jessie F. Richardson Foundation EWB Portland Professionals Teamworks International Nicaraguan municipality in Jinotepe University of Paulo Friere, Nicaragua PSU Institute on Aging
9
EWB-PSU Events and Fundraising EWB-PSU Annual Fundraising Banquet Chinook Book Fundraiser West Coast regional workshop (2007) PSU – Student Activity Leadership Program
10
EWB-PSU Projects - Nicaragua 2006 Implementations Assessments 2007 Implementations Assessments 2008 Future Projects
11
EWB-PSU Nicaraguan Communities (2006) Jinotepe Water distribution system Matagalpa Irrigation system
12
EWB-PSU Completed Projects and Assessments (2006) Implementation: Matagalpa irrigation system Assessments: Jinotepe water distribution system Finished drip system at orchard Schematic of irrigation drip system implemented in Matagalpa
13
EWB-PSU Nicaraguan Communities (2007) Implementations Jinotepe ○ Hogar Assessments El Bluff ○ Community & Schools Puerta Cabezas ○ Hospital & School Jinotepe ○ School and Huehuete well
14
EWB-PSU Completed Projects and Assessments (2007) Water Tank & Tower Installation Roof Stabilization System Electrical System Upgrade Installation Preliminary foundation designInstalling tank and tower
15
EWB-PSU Nicaragua 2007 Team members: 9 engineering students 1 professional engineer 9 health students Implementation Two weeks in country June 2007
16
EWB-PSU Nicaragua 2007 Residents of the Hogar
17
EWB-PSU Nicaragua 2007 Water Tank & Tower Installation Goals: Elevate the 2500-liter tank currently on ground Locate tower for this tank Construct the concrete tower footings Isolate the current tower for continued facility water service. Install the tank Elevate the new 5000-liter tank Construct the concrete footings for the second new tower. Install the tank Connect tanks
18
EWB-PSU Nicaragua 2007 Water Tower Site Assessment First time to see the site Check physical dimensions Connect to people at the Hogar
19
EWB-PSU Nicaragua 2007 Water Tower Introduction to Nicaraguan engineering students Start foundation excavation
20
EWB-PSU Nicaragua 2007 Water Tower Adjustments to a prefabricated tower Nicaraguan students brought skills and equipment
21
EWB-PSU Nicaragua 2007 Water Tower Placement of 5000 L water tank
22
EWB-PSU Nicaragua 2007 Water Tower Setback: Leg of tower directly over an unpressurized water main Solution: Rotated tower legs
23
EWB-PSU Nicaragua 2007 Roof Stabilization System Goals: Stabilize the roof system to prevent tiles from shifting or falling during a seismic event. Metal tension strapping to be attached into the roof frame and concrete of the exterior wall.
24
EWB-PSU Nicaragua 2007 Roof Stabilization: 700 feet of CS16 galvanized steel tension strapping donated by Simpson Strong-Tie
25
EWB-PSU Nicaragua 2007 Roof Stabilization: Bolted strapping to concrete wall
26
EWB-PSU Nicaragua 2007 Roof Stabilization: Straps must be installed in tension
27
EWB-PSU Nicaragua 2007 Electrical System goals: Examine and correct the unsafe existing circuits. Consider the exposed junction boxes.
28
EWB-PSU Nicaragua 2007 Electrical Nicaraguan electrical contractor assessed students with electrical work
29
EWB-PSU Nicaragua 2007 Electrical Students measured and cut all conduit
30
EWB-PSU Nicaragua 2007 Electrical Created individual light switches for each room
31
EWB-PSU Active Projects (Spring 2008) Jinotepe elementary school flooding project Puerto Cabezas hospital water distribution/ purification project Huehuete well design/management Central clinic in Puerto CabezasSchool flooding project in Jinotepe
32
Engineers without Borders Get Involved! Become involved in building a better world one community at a time, whether you are: An engineering student A student in some other field of study A professional engineer or university faculty member Not an engineer at all!
33
Engineers without Borders Get Involved! How to Volunteer? Join or Start a Chapter Be a Professional Reviewer Coordinate Between Projects Provide Technical Expertise Help as a Non-Engineer Support Our Administrative Needs