Download presentation
Presentation is loading. Please wait.
Published byKristina Noakes Modified over 9 years ago
1
Transportation Enhancement in Oregon Pat Rogers Fisher TE Program Manager Oregon Dept. of Transportation (503) 986-3528 patricia.r.fisher@odot.state.or.us
2
TE Basics Oregon’s TE profile The 12 TE Activities Schedule for 2010 Tips for a Successful Application Main Topics
3
Acronyms TE Transportation Enhancement ODOT Oregon Department of Transportation FHWA Federal Highway Administration AASHTO American Association of State Highway and Transportation Officials
4
TE Basics Federal funds for transportation-related projects Source of funds -- 10% of STP allocation Reimbursement -- not grants !! Requires matching funds -- 10.27%
5
Projects are meant to: Strengthen the cultural, aesthetic, or environmental aspects of the trans. system Enrich the experience of those using the transportation system Go beyond what is routine or required on transportation projects
6
Eligibility Fits an approved TE Activity Has clear relation to surface transportation also… Is over and above what is routine or required on transportation projects
7
Twelve TE Activities 1. Facilities for Pedestrians and Bicyclists 2. Safety and Educational Activities for Pedestrians and Bicyclists 3. Acquisition of Scenic Easements and Scenic or Historic Sites (including historic battlefields) 4. Scenic or Historic Highway Programs (including tourist and welcome center facilities)
8
more TE Activities… 5.5Landscaping and Other Scenic Beautification 6.Historic Preservation 7.Rehabilitation and Operation of Historic Transportation Buildings, Structures and Facilities (including historic railroad facilities and canals) 8.Preservation of Abandoned Railway Corridors (including conversion and use for pedestrian or bicycle trails)
9
more TE Activities… 9. Inventory, Control and Removal of Outdoor Advertising 10.Archaeological Planning and Research 11.Environmental Mitigation (i) to address water pollution due to highway runoff or (ii) to reduce vehicle-caused wildlife mortality while maintaining habitat connectivity 12.Establishment of Transportation Museums
10
Oregon’s TE Program 2-part program– Statewide Competitive – Director’s Discretionary Allocation 8.5 $M/yr FY 2008-2011 9.6 $M/yr FY 2012-2015 42 active projects13 programming 13 PE or ROW 16 construction
11
Oregon TE Profile TE Awards Minimum$200,000 Maximumabout $1.5M (no set policy) Average$870,000 Matching funds Minimum10.27% Average20% Soft match with prior approval
12
Standards --Bike/PedAASHTO + Oregon Bike/Ped Plan --OthersAppropriate to type of project Plans & Goals -- Local comp plans & transportation plans -- Statewide plans and goals Contracting -- State and federal rules -- Certified Agency Program Oregon TE Profile
13
Schedule -- 2 year cycle with STIP -- Notice by letter, news release, web site -- 12 months from notice to award Type of Process -- Statewide selection -- No quotas by project type or location Assistance -- Web site. Workshops. Local DOT contacts. Oregon TE Profile
14
Application Sequence NOI = Notice of Intent Approval to Proceed 2-part app: form + support docs Screening and Review Initial compliance Technical Review Comment Period Cut to 30 Finalists Scoring/Selection
15
Selection Team 11 member Advisory Committee Selection Method Individual scoring.Meet to discuss & select Approvals DOT. FHWA. Commission. After Award Assigned to Region staff Oregon TE Profile Selection and Approval
16
Projects Dollars Sidewalk, Bike Lane33%26% Separate Path (trail)34%43% Main Street/Streetscape 6% 8% Historic Preservation13%13% Scenic, Environmental 14% 9% TE Projects, FY 2000-2009
17
Scenic Byway Program Forest Highway Program Safe Routes to School State Pedestrian & Bicycle Program Coordinating with Other Funding Programs
18
TE and Bicycle-Pedestrian Program Coordinate on project selection, program policy, technical review Many of the same applicants & projects Jointly funded projects --Powell Blvd Bike-Ped Bridge --Waldport Sidewalk / Streetscape --Rogue River Greenway Trail, Hwy 140 Tunnel
19
TE and Scenic Byways Many of same applicants Byways & TE Activity #4 Jointly Funded Projects --Heceta Head Lighthouse Access --Vista House Restoration --Depoe Bay Scenic Lands Acquisition
20
TE Program Mgr is FHP coordinator FH Enhancement projects also fit TE Jointly Funded Projects --Lowell Covered Bridge --Vista House / Crown Point Viaduct --Oneonta Tunnel TE and Forest Highway Program
21
TE and Safe Routes to School TE Program Manager manages SRTS Infrastructure Many of the same applicants Jointly funded projects --Elkton: River Rd. Sidewalks
22
Twelve TE Activities 1. Facilities for Pedestrians and Bicyclists 2. Safety and Educational Activities for Pedestrians and Bicyclists 8.Preservation of Abandoned Railway Corridors (conversion and use for pedestrian or bicycle trails)
24
Washington Street in Vale BEFORE AFTER
25
4 th StreetMain St PhoenixHeppner
26
Shared-Use Paths Trails & Bridges
27
The Dalles Riverfront Trail
28
Sports Park Bridge, Grants Pass
29
Union Street Railroad Bridge
30
Main Streets & Streetscape
31
Lakeview
32
‘A’ Street in Vale BEFORE AFTER
33
Twelve TE Activities 3. Acquisition of Scenic Easements and Scenic or Historic Sites (including historic battlefields) 4. Scenic or Historic Highway Programs (including tourist and welcome center facilities) 5.Landscaping and Scenic Beautification
34
Shell Island – Simpson Reef Overlook Walkway to Viewpoint
36
Vista House at Crown Point
37
Landscaping & Scenic Beautification
38
Philomath: US-20 Landscaping BEFORE AFTER
39
more TE Activities… 5.Historic Preservation 6.Rehabilitation and Operation of Historic Transportation Buildings, Structures and Facilities (including railroad facilities and canals)
40
Historic Preservation
41
Portland Union Station
42
Lowell Covered Bridge Restoration & Interpretive Site
43
more TE Activities… 9. Inventory, Control and Removal of Outdoor Advertising 10.Archaeological Planning and Research 11.Environmental Mitigation (i) to address water pollution due to highway runoff or (ii) to reduce vehicle-caused wildlife mortality while maintaining habitat connectivity 12.Establishment of Transportation Museums
44
MAY 18, 2010App. Forms Available JUNE 30, 2010NOI Due SEPT 30, 2010Applications Due FEB. 2011Narrow to Finalists APRIL 2011OTC Final Approval Project Selection Schedule for 2010
45
Selection Process Two-stage Application -- Notice of Intent (NOI) -- Application with support documents Review and Screening -- Initial compliance review -- Technical review -- Comment period Selection and Approval (next slide)
46
Selection and Approval Reduce to ~30 finalists TE Advisory Committee scores and selects FHWA and ODOT Director review Oregon Transportation Commission approval
47
After Selection Notification and acceptance Assign to program year (STIP) Scoping, prospectus, agreement Hire consultant and begin
48
Who May Apply If a project is on notice for being late or inactive, the sponsoring agency and all co-applicants or partners in any phase of the project may not apply for TE funding and may not sponsor a project for others… Policy & Procedures Changes for 2010
49
Focus Areas -- #1 Benefits a state highway, state-owned transportation facility, or a multi-modal transportation facility Policy & Procedures Changes for 2010
50
Focus Areas -- #3 Supports or augments one or more of the following: 1 -- an upcoming STIP project, 2 -- a mixed-use or compact development, 3 -- a state or regional Governor’s Economic Revitalization Team effort, or 4 -- a state or federal job creation/retention program. Policy & Procedures Changes for 2010
51
Focus Areas -- #5 Directly supports tourism, health promotion, or economic development efforts, or has tourism, health promotion or economic development as its primary focus. Policy & Procedures Changes for 2010
53
Enhancing your Application
54
Choice of Project Predominant work fits a TE Activity General intent fits TE program purpose Early coordination is done Match and partnerships confirmed
55
Enhancing your Application Scope of Work Meet design / development standards Logical end-points or phasing Funding, Partnerships -- simple and secure Distinguish eligible vs. non-TE work
56
Enhancing your Application Matching Funds Prove you have enough qualified match Cash counts more than “soft match” Extra match can score higher Distinguish match from non-TE costs
57
Enhancing your Application Cost Estimate Be realistic – we check detail and prices! Be reasonable – is it an appropriate transportation expenditure? Be specific – show unit costs Show separate total for non-TE work Don’t “pad” to meet minimum size
58
Enhancing your Application Rating Factors Speak to published rating factors Emphasize most relevant factors Use terms and sequence from the application packet
59
Enhancing your Application Assembling the Application Respect page limits, font size, formatting Make sure pages copy OK in black-and-white App. form and support documents separate Legible map and graphics
60
Enhancing your Application Supporting Documents Confirm local support and priority Commitments and contributions from others Resolutions and Endorsements Approval to use property owned by others
61
Enhancing your Application Consider the Reviewers Give short, simple answers. Avoid repetition. Minimize background info. Stick to the question. Use legible font. Check format and spacing. Use support letters wisely -- 2 or 3 max. Provide a GOOD map !
62
Pat Rogers Fisher TE Program Manager Oregon Dept. of Transportation (503)986-3528 patricia.r.fisher@odot.state.or.us Transportation Enhancement
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.