U.S. Customs and Border Protection Infrastructure Update Transportation Border Working Group October 27, 2010
2
CBP Land Port of Entry Program Conditions at ARRA Ports Boundary, WA (CBP)Los Ebanos, TX (CBP) Van Buren, ME (GSA – flooded) Whitetail, MT (CBP)
3
3 Existing LPOE End State Rendering P INNACLE R OAD, VT Above: Foundation work is 98% complete
4
4 C HURUBUSCO, NY Above: Bollard concrete pour Below: Utility installation at the Government Garage Above: Sand backfill and stockpile Below: Installation of floor drain
5
5 P ITTSBURG, NH Existing LPOE End State Rendering Above: Erecting steel frame of building
6
F OREST C ITY, ME 6 CBP archaeological specialists excavate the site of the proposed Forest City, ME LPOE.
7
7 W ALHALLA, ND Existing LPOE End State Rendering Above: Stem walls in place
8
8 W ESTHOPE, ND Existing LPOE End State View from South Above: View of electrical and plumbing work Right: Curbs in place for lanes
9
9 S HERWOOD, ND Existing LPOE End State Rendering Above: Curbs installed prior to asphalt paving
10
10 A NTLER, ND Right: View of LPOE looking North Left: Excavating for electrical in drive islands
11
11 M ORGAN, MT Above: Drive lane looking south at booth Below: Housing module moving into final position Above: Installation of roof sheathing on east side of LPOE Below: Truss installation at south residential unit
12
12 W ILD HORSE, MT Right: Asphalt edge clean up and site grading Left: Fire Suppression distribution lines being installed
13
13 C ARBURY, ND Existing LPOE End State Rendering Right: View of newly set roof trusses and exterior of LPOE Left: View from inside the LPOE
14
14 H ANSBORO, ND Existing LPOE End State Rendering from South Above: Foundation work at the port
15
15 N ECHE, ND Existing LPOE End State Rendering Left: Foundation work continues Right: Installation of main building underslab plumbing and electrical
16
16 F RONTIER, WA Above: Vapor Barrier installed at LPOE depressed slab Below: Finishing concrete for slab-on-grade at Main Port Building Above: Spreading crushed base rock for asphalt paving
17
17 W ILLOW C REEK, MT Control closet, camera, and monitor installed at the Willow Creek, MT LPOE, one of seven LPOEs receiving BSDP equipment.
18
N OONAN, ND Above: Bypass lane with RPM bollards in the background Below: Culvert under Highway 40 Above: View of the LPOE looking North
19
19 Slide Title