Presentation is loading. Please wait.

Presentation is loading. Please wait.

Essex County Transportation Services Department Essex County Highways 2013 Construction Program Peter Bziuk P. Eng. Manager Construction Services.

Similar presentations


Presentation on theme: "Essex County Transportation Services Department Essex County Highways 2013 Construction Program Peter Bziuk P. Eng. Manager Construction Services."— Presentation transcript:

1 Essex County Transportation Services Department Essex County Highways 2013 Construction Program Peter Bziuk P. Eng. Manager Construction Services

2 Essex County Highways 2013 Construction Program Highlights –$25,872,500 expenditure level –Includes approx. $1,100,000 from 2012 –Rehabilitation Program –Capacity Improvement Program –CWATS Implementation

3 Rehabilitation Program 27 Planned Projects –6 Bridges ( 2 Engineering, 4 Construction ) –12 Roads –5 Maintenance –4 Culverts ( 2 Engineering, 2 Construction )

4 Capacity Improvement Program County is continuing a multi year capacity improvement program for the network County funding is being utilized, Senior level funding is being pursued 10 Planned Projects for 2013 –7 Construction, 3 Engineering

5 Essex County Highways Bridge Projects ($5,725,000) –4 - Structure Rehabilitations: CR 14 @ Silver Creek CR 2 @ Ruscom River CR 31 @ Ruscom River CR 42 @ Moisson Creek –1 - Structure Rehab / Expansion: CR 22 @ Puce River –2 - Engineering for 2014 construction: CR 8 @ Belle River CR 18 @ Big Creek

6 Essex County Highways Culvert / Drainage ( $1,100,000 ) –CR 43 @ Gzowski Drain culvert replacement –CR 50 @ Beaudoin Drain culvert replacement –CR 34 – Drain Improvement – Kingsville –2 - Culvert Engineering projects for 2014 CR 31 @ Ruscom River CR 43 @ Sullivan Creek

7 Essex County Highways Road Projects ($4,820,000) –Recycling/Resurfacing: CR 19 - Tecumseh/Lakeshore – 6.2 km CR 12 - Essex – 2.0 km CR 7 - LaSalle – 1.5 km CR 29 - Kingsville – 2.6 km CR 34 - Leamington – 1.5 km CR 5 - Amherstburg – 1.8 km CR 8 - Lakeshore/Leamington – 7.0 km CR 10 - Amherstburg – 2.7 km CR 14 - Leamington – 1.8 km

8 Essex County Highways Pavement Preservation ( $495,000 ) –Route and Seal – various locations –Surface Treatment – various locations - 8 km –Slurry Seal – CR50 – 5.5 km Bridge / Culvert Preservation ($855,000) –8 - deck/expansion joint repairs –Various guiderail repairs / upgrades Estimated Quantities –35,000 tonnes of Hot Mix Asphalt –127,000 sm. of Pavement Recycling –19,750 tonnes of Granular A

9 Essex County Highways Capacity Projects ( $5,600,000 ) –CR 23/46 – Intersection Improvements – LS –CR 22 Phase 5 - Contract A – LS –CR 19/22 Improvements - Engineering –Various Connecting Link projects with Towns CR 19 – Tecumseh CR 6 – LaSalle CR 20 – Amherstburg CR 34 – Leamington

10 Essex County Highways EA’s / Engineering: –CR 19 / CR 22 with MTO Prelim. Design ($200M) –CR 22 Ph 5b – CR 2 to Puce Detailed Design ($7.0M) –CR 42 EA – CoW to CR 25 ($30M) –Lauzon Parkway Extension – MTO/CoW /CoE –Active Transportation System ($52M) Annual expenditure @ $1,200,000

11 Essex County Highways Thank you for your interest, Thank you for your support in delivering our annual programs, Looking forward to another successful construction season.


Download ppt "Essex County Transportation Services Department Essex County Highways 2013 Construction Program Peter Bziuk P. Eng. Manager Construction Services."

Similar presentations


Ads by Google