Presentation is loading. Please wait.

Presentation is loading. Please wait.

Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 1 Data Taking Jan 2 – 8 Store # BeginLum [cm -2 s -1 ]Duration 3123Fri 16:134.3E31 27.9 hrs 3125Sat 23:414.2E31.

Similar presentations


Presentation on theme: "Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 1 Data Taking Jan 2 – 8 Store # BeginLum [cm -2 s -1 ]Duration 3123Fri 16:134.3E31 27.9 hrs 3125Sat 23:414.2E31."— Presentation transcript:

1 Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 1 Data Taking Jan 2 – 8 Store # BeginLum [cm -2 s -1 ]Duration 3123Fri 16:134.3E31 27.9 hrs 3125Sat 23:414.2E31 25.2 hrs 3127Mon 4:404.4E31 27.0 hrs 3130Tue11:284.6E31 30.7 hrs 3132Thu 1:59 4.7E31 29.7 hrs 7 of the 8 best stores (initial luminosity) in the last month Long stores, targeted studies and recycler shots 141 (!) hrs in store for the week

2 Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 2 Integrated Luminosity

3 Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 3 Data Taking Jan 2 – 8 Day∫L dt (del)∫L dt (rec)Efficiency FriJan 2 1342nb -1 1176nb -1 87.6% SatJan 3 1241nb -1 1094nb -1 88.2% SunJan 4 1765nb -1 1494nb -1 84.7% MonJan 5 1764nb -1 1492nb -1 84.6% TueJan 6 1740nb -1 1489nb -1 85.6% WedJan 7 1038nb -1 901nb -1 86.9% ThuJan 8 2057nb -1 1748nb -1 85.0% This week 10947nb -1 9394nb -1 85.8% Best week9786nb -1 8604nb -1 87.9% (May 2-8 2003) Only category where we have not set records recently is efficiency... All-time best

4 Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 4

5 Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 5 Store 3123 (Jan2-3) Initial Lum. 4.3 ⋅ 10 31 cm -2 s -1 SBC (0x53)Restart CFT (23min)temperature control program (15min)

6 Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 6 Store 3125 (Jan3-5) Initial Lum. 4.2 ⋅ 10 31 cm -2 s -1 SMT HDI, 2xL2 medium hammerM200 tripsEnd store confusion (50min)(18+15min) L1 Trigmon down for much of the store

7 Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 7 Store 3127 (Jan5-6) Initial Lum. 4.4 ⋅ 10 31 cm -2 s -1 STT outM200 trip, x24/x25 outfix CTTSTT (15min)(13min)(22min)(15min) (slow NFS) NFS overloaded evening/owl

8 Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 8 Store 3132 (Jan8-9) Initial Lum. 4.7 ⋅ 10 31 cm -2 s -1 First run ever with >500nb -1 recorded (507nb -1, run 187910) Inappropriate prescalesMuon PDT231hot tower chosen(32min)(30min)

9 Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 9 Store 3130 (Jan6-7) Initial Lum. 4.6 ⋅ 10 31 cm -2 s -1 SMT HDI B4-L6-05SBC 0x51 + farm resetEnd-of-store studies (22min)(28min)Special run (CTT)

10 Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 10 Agenda RussMechanical StuOnline Fritz / GeoffControls Michiel / ElliotGM Michael / SergeySMTStefan / BrigitteCTT Fred / Drew / AbidCFT / PSBill L. / LarsSTT RobertCALJeffL1Muon Al ItoCentral MuonMiroslavL2 DmitriForward MuonGordon / DougL3 BrendanLuminosity Andrew / Mike S.FPD


Download ppt "Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 1 Data Taking Jan 2 – 8 Store # BeginLum [cm -2 s -1 ]Duration 3123Fri 16:134.3E31 27.9 hrs 3125Sat 23:414.2E31."

Similar presentations


Ads by Google