Controller-Pilot Data Link Communications Build I & Build IA Programs ATN 2001 Focus on the Reality of Data Link IEE London, England 19 September 2001.

Similar presentations


Presentation on theme: "Controller-Pilot Data Link Communications Build I & Build IA Programs ATN 2001 Focus on the Reality of Data Link IEE London, England 19 September 2001."— Presentation transcript:

1 Controller-Pilot Data Link Communications Build I & Build IA Programs ATN 2001 Focus on the Reality of Data Link IEE London, England 19 September 2001 Gregg Anderson ATS User Team Lead Free Flight Phase Office

2

3 En Route ATN CPDLC Build I Summary  Single-site Deployment – Key site: Miami Air Route Traffic Control Center (ARTCC) – Provides 4 Operational Services Transfer of Communication, Initial Contact, Altimeter Setting, Informational Menu Text  American Airlines is the Launch Airline  Uses ATN Compliant VDL-2 as Air-to- Ground Sub-network

4 En Route ATN CPDLC Build I Summary continued  CPDLC Implementation Status – HW delivery begins to Miami7/01 – HW Installation in Miami8/01  CPDLC Testing Status – ATN Interoperability Testing9/01 – OT&E begins10/1 – Live Flight Testing at Miami2/02  AT Training9/01  Initial Daily Use (IDU)6/02

5 En Route ATN CPDLC Build IA Summary  Key Site Initial Daily Use (IDU): Dec 2003  National Deployment to Domestic ARTCCs  Provides 9 Operational Services – Build I services plus speeds, headings, altitudes, pilot-initiated altitude requests, route clearances  ATN-compliant VDL-2 air-to-ground subnetwork  Ground System will Support a DO-178B Level C Aircraft Certification  Widespread Industry Use Expected

6

7 Why CPDLC? Study Results  78% Reduction in Voice Channel Occupation Time  62% Reduction in Ground Delays  20% Reduction in Flight Times/Dist  30% Reduction in Arrival Processing Times Source: Data Link En Route Benefit Study, 1995

8 Minutes of Radio Occupation

9 CPDLC Reduces Communications Delays

10 SolutionProblem Results - Atlanta Tiroe Jet Only Arrivals* * Atlanta Data Link Benefits Study

11 FFP2 CPDLC  CPDLC Builds I and IA are included in the FFP2 Program – Guidance from RTCA Free Flight Steering Committee  Leverage FFPO Agency priority and successful processes: – User Teams / User Acceptance – Waterfall Management – Metrics & Benefits Tracking – Risk Management – Industry Coordination