Download presentation
Presentation is loading. Please wait.
Published byKenna Hardman Modified over 9 years ago
1
Information for Delegation Holders Peter Gill Airworthiness Engineer
2
Topics to be covered: Delegation Changes since 2009 Major Design Change Authorisation Process Manufacturing Considerations STC’s AC’s Other Miscellaneous Topics Design Delegation Holder’s Seminar Design Delegation Holder’s Seminar
3
Delegation Changes since 2009 No approval of modification classified as “major design change” (schedule One) without CAA authorisation CAA undertook to give authorisation for appropriate “one-off” modifications where not contrary to CAA policy All delegations which included modifications were re-issued August 2010 Design Delegation Holder’s Seminar Design Delegation Holder’s Seminar
4
Authorisation Process Design Delegation Holder’s Seminar Design Delegation Holder’s Seminar
5
Authorisation Requests 2010 10 Yes0 No 201154 Yes5 No Reasons for No: 1 – Unusual design features 1 – HEC (CAA Policy – STC) 1 – 21.303 (later authorised) 1 – Operational Concern 1 – TCDS Change 201210 Yes0 No Design Delegation Holder’s Seminar Design Delegation Holder’s Seminar
6
Manufacturing Considerations Part 146 organisations approve data – do not authorise manufacture CAA expect part 146 organisations to promote compliance with Rules where possible CAA has publicised compliance with 21.303 to industry (Vector magasine article Nov/Dec 2010) Factor in authorisation process Design Delegation Holder’s Seminar Design Delegation Holder’s Seminar
7
Manufacturing Considerations Contd CAR 21.303 – be manufactured “by a person performing maintenance on the product…” No subcontracting (can supervise) NOTE: “Subcontracting” term here is used in the manufacturing sense where the manufacturer takes responsibility for the subcontractors work. Where the “subcontractor” has an organisation certificate of its own and can issue a release certificate, that is acceptable (they are then a “supplier” rather than a ‘subcontractor”.) Design Delegation Holder’s Seminar Design Delegation Holder’s Seminar
8
Manufacturing Considerations Contd How to approved “existing” equipment (where origin unknown)? Should be a document (Form One or Two) identifying part and origin Part 21Q has always required part marking Design Delegation Holder’s Seminar Design Delegation Holder’s Seminar
9
STC’s See later presentation from Beth Small number of “New” STC’s Large number started, stalled Time delays – CAA extra assessment Certification Basis – Determine iaw FAR 21.101 Changed Product Rule Requirement for any STC where FAA validation is likely to be sought Should always specify why you can’t/don’t use the latest requirements Design Delegation Holder’s Seminar Design Delegation Holder’s Seminar
10
Advisory Circulars Advisory Circulars to be revised or written by ACU (we welcome comments or suggestions): AC 146-1 - Clarify CAA position on “one-man- bands”; Clarify Delegation Issue Process; General Update AC 148-1 – General Update; Remove Extraneous material; Clarify CAA position on Subcontractors, senior person qualifications, Critical Parts, Design Data. Design Delegation Holder’s Seminar Design Delegation Holder’s Seminar
11
Advisory Circulars Contd AC 43-9 (Mods, Repairs, 337) – Complete re- write and update AC 91-5 (PEDS) – General update New AC on aircraft Electrical Load Analysis - Probably an AC 91-X – detailing how the owner should maintain an ELA for his aircraft Design Delegation Holder’s Seminar Design Delegation Holder’s Seminar
12
Miscellaneous Topics Where making a minor change to a “major design change” – is this major? Original approver? Effect of change? Continuation of Class A/B delegation classifications? Not yet determined Design Delegation Holder’s Seminar Design Delegation Holder’s Seminar
13
Miscellaneous Topics Contd Delegation of Part 146 activities: Testing Data (eg Weight & Balance data) Electrical/Mechanical demarcation 1309 training – Seen by CAA as essential Design Delegation Holder’s Seminar Design Delegation Holder’s Seminar
14
Miscellaneous Topics Contd Surveillance – effect of new policy Increased preparation More targeted audit No change to delegate monitoring Design Delegation Holder’s Seminar Design Delegation Holder’s Seminar
15
Questions? Design Delegation Holder’s Seminar Design Delegation Holder’s Seminar