Download presentation
Presentation is loading. Please wait.
Published byJohnny Hogarth Modified over 9 years ago
1
U.S.R. Electronic Systems (1987) Ltd.
2
LOCATION – TEL AVIV. 10 YEARS EXPERIENCE. TEAM OF 6 ENGINEERS INCLUDING MANAGER AND TEAM LEADER. AVERAGE PROJECTS PER MONTH : 20-30. MECHANICAL DESING DIVISION STURCTURE
3
U.S.R. Electronic Systems (1987) Ltd. U.S.R CAPBILITIES IN ELCTRONIC PACKAGING PLANING FOR PUNCHING MANUFACTURE. PLANING FOR NIBLING MANUFACTURE. PLANING FOR EXTRUSION MANUFACTURE. PLANING PLASTIC PRODUCTS FOR HIGH\LOW PRESSURE\STL\MILLING MANUFACTURE. PLANING FOR ALUMINUM CASTING MANUFACTURE. PRESSURE CASTING, SAND CASTING.
4
U.S.R. Electronic Systems (1987) Ltd. PLANING FOR PUNCHING MANUFACTURE
5
U.S.R. Electronic Systems (1987) Ltd. PLANING FOR NIBLING MANUFACTURE
6
U.S.R. Electronic Systems (1987) Ltd. PLANING FOR EXTRUSION MANUFACTURE
7
U.S.R. Electronic Systems (1987) Ltd. PLANING PLASTIC PRODUCTS FOR HIGH\LOW PRESSURE \STL \MILLING AND INJECTION MANUFACTURE
8
U.S.R. Electronic Systems (1987) Ltd. STANDARDS PLANING IS BASED UPON RADIO FREQUENCY INTERFERENCE. RFI – RADIO FREQUENCY INTERFERENCE. IP STANDARTS – OUTDOOR CONDITIONS. IP STANDARTS – OUTDOOR CONDITIONS. THERMAL ANALYSIS – MODELS TEMPERTURE TESTING.THERMAL ANALYSIS – MODELS TEMPERTURE TESTING. ENVIRONMENTAL TESTING – OVEN/LAB TESTING.ENVIRONMENTAL TESTING – OVEN/LAB TESTING. VIBRATION TESTING – PRODUCT LAB TESTING.VIBRATION TESTING – PRODUCT LAB TESTING. HALT & HASS – PRODUCT LIFE SPAN TESTING.HALT & HASS – PRODUCT LIFE SPAN TESTING.
9
U.S.R. Electronic Systems (1987) Ltd. (RFI) Interference Frequency Radio (RFI) Interference Frequency Radio
10
U.S.R. Electronic Systems (1987) Ltd. IP STANDARTS
11
U.S.R. Electronic Systems (1987) Ltd. THERMAL ANALYSIS
12
U.S.R. Electronic Systems (1987) Ltd. ENVIRONMENTAL TESTING HUMIDITY SUN RADIATION RAIN WIND PRESSURE SALTY ENVIRONMENT SAND AND DUST TEMPERTURE TESTING
13
U.S.R. Electronic Systems (1987) Ltd. VIBRATION TESTING VIBRATION WHEN THE PRODUCT IS TURNED OFF. VIBRATION WHEN THE PRODUCT IS TURNED ON. SHIPPING SHAKEING TEST. ACOUSTIC NOISE. SHOCK TESTING.
14
U.S.R. Electronic Systems (1987) Ltd. HALT & HASS APLLYING EXTREME CONDITIONS (PRESSURE, TEMPRTURE, LOAD) IN ORDER TO FIND PROBLEMS EARLY ON. THERE ARE SEVERAL EXPEDITIOUS EXPERIMENT: LIFE SPAN RELIABILITY FILTERING MANUFACTURE PROBLEMS PROCESSES.
15
U.S.R. Electronic Systems (1987) Ltd. ManufacturePlanningQuality ControlComponentsDocumentationProcess Samples Production Design Planer Engineering Project Manager
16
U.S.R. Electronic Systems (1987) Ltd. ISO9001:2000 certified ISO13485 (medical) certified ISO 14001 environmental
17
U.S.R. Electronic Systems (1987) Ltd. All factories and centers are linked and connected (data & voice ) using a common computer network. All U.S.R designer uses agile as engineering solution for all her customers.
18
U.S.R. Electronic Systems (1987) Ltd. CREATING A PRODUCT MEETING THE CUSTOMER
19
U.S.R. Electronic Systems (1987) Ltd. DEMANDS DEFINITION – SOW OR PRICE QUOTE DEMANDS SPECIFICATIONS PRODUCT AND COMPONENT DEFINIRTION PLANING IDEAS PRICE NEGOTIATION
20
U.S.R. Electronic Systems (1987) Ltd. DESING REVIEW -PDR PDR - PREPARING BASIC FORMATION FOR CUSTOMERS. CDR - FINAL CONCEPT INCLUDING B.O.M FDR - PROTOTYPE PRODUCTION
21
U.S.R. Electronic Systems (1987) Ltd. SUBCONTRACT IN FILEDS LIKE: THERMAL ANALYSIS PRODUCT DESIGNER CIRCUIT EDITOR SHEET METAL MANUFACTURERS PAINT AND PRINTING ENVIRONMENTAL CONDITIONS LAB U.S.R IS USING SEVRAL SUBCONTRACTORS IN DIFFERENT FILEDS IN ORDER TO GIVE THE CUSTOMER FULL GUARANTEE.
22
U.S.R. Electronic Systems (1987) Ltd. DESING REVIEW -CDR
23
U.S.R. Electronic Systems (1987) Ltd. MANUFACTURE SKETCHES
24
U.S.R. Electronic Systems (1987) Ltd. MANUFACTURE SKETCHES
25
U.S.R. Electronic Systems (1987) Ltd. ASSEMBLY SKETCHES
26
U.S.R. Electronic Systems (1987) Ltd. PREPARING CARDS LAY OUT
27
U.S.R. Electronic Systems (1987) Ltd. PREPARING CARDS LAY OUT
28
U.S.R. Electronic Systems (1987) Ltd. PREPARING CARDS LAY OUT
29
U.S.R. Electronic Systems (1987) Ltd. CABLE PLANNING
30
U.S.R. Electronic Systems (1987) Ltd. WIRE SKETCHING
31
U.S.R. Electronic Systems (1987) Ltd. STEPS AFTER MECHANICAL PLANNING BUILDING BOM OF THE MECHANICAL PARTS. RECEIVING PRICE QUOTE METAL PARTS, WIREING AND DIFFERNET FASTENERS – FROM SUBCONTRACTORS. ESCORTING PRODUCT ASSEMBLY. CORRECTIONS AFTER BUILDING PROTOTYPE. FINAL PRODUCT.
32
U.S.R. Electronic Systems (1987) Ltd. RECENT PROJECTS
33
U.S.R. Electronic Systems (1987) Ltd.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.